Drilling well design optimization reduces total Authorization for Expenditures (AFE) by decreasing well constructing time and expense. Well design is not a constant pattern during the life cycle of the field. It should be optimized by continuous improvements for all aspects of redesigning the well depending on the actual field conditions and problems. The core objective of this study is to deliver a general review of the well design optimization processes and the available studies and applications to employ the well design optimization to solve problems encountered with well design so that cost effectiveness and perfect drilling well performance are achievable. Well design optimization processes include unconventional design(slimhole) compared with fat design, in addition to optimizing casing setting depth selection and casing string loads. Finally, we demonstrate well trajectory design considerations and optimization. The optimization process that mentioned above is significantly reduce drilling cost and time since, slimhole design with smaller casing and hole size reduce mud volume cost, steel cost and pump fuel cost. Optimum casing seat selection can ovoid serious problem such as kick and losses that increase nonproductive time (NPT) if kick tolerance and downhole pressure profile is not considered. Anticipating optimum stress loads in casing design is most effective way to reduce casing strings cost avoiding additional cost for designing with useless worst conditions. Wellbore trajectory optimization with geomechnic consideration is major concern to reduce the problem encountered with high torque, drag, formation collapse that result stuck pipe and non-productive time (NPT).
A substantial percentage of the world’s energy consumption (almost 40%) and carbon dioxide (CO2) emissions (around 37%) come from the construction industry, especially schools. This work presents a new hybrid artificial intelligence (AI) engineering model that aims to maximize energy performance on campuses in a holistic way. Modules for data-driven forecasting, metaheuristic optimization, and real-time adaptive control are all part of the concept. A thorough energy simulation of a university campus building is used in conjunction with the AI model to assess its performance through a co-simulation framework. Findings show that yearly peak electricity demand may be reduced by 18.7% and total site energy consumption by 22.4% when co
... Show MoreA second-order sliding mode control is used for high-order uncertain plants using equivalent control approach to improve the performance of control systems. They combine backstepping with quasi-continuous controller and twisting controllers. This paper considers a two of the most popular controllers that are used to solve the nonlinearities problem which are the backstepping quasi-continuous control (BQCC) and backstepping twisting controllers to control the angular velocity of a hydraulic motor to improve tracking performance and robustness to uncertainties. For the system dynamics, a linear state feedback with suitable high gain was designed as the virtual controller, where steady state error can be made arbitrarily small according to the
... Show MoreIn this paper, an analytical solution describing the deflection of a cracked beam repaired with piezoelectric patch is introduced. The solution is derived using perturbation method. A novel analytical model to calculate the proper dimensions of piezoelectric patches used to repair cracked beams is also introduced. This model shows that the thickness of the piezoelectric patch depends mainly on the thickness of the cracked beam, the electro-mechanical properties of the patch material, the applied load and the crack location. Furthermore, the model shows that the length of the piezoelectric patches depends on the thickness of the patch as well as it depends on the length of the cracked beam and the crack depth. The additio
... Show MoreIn this paper, an analytical solution describing the deflection of a cracked beam repaired with piezoelectric patch is introduced. The solution is derived using perturbation method. A novel analytical model to calculate the proper dimensions of piezoelectric patches used to repair cracked beams is also introduced. This model shows that the thickness of the piezoelectric patch depends mainly on the thickness of the cracked beam, the electro-mechanical properties of the patch material, the applied load and the crack location. Furthermore, the model shows that the length of the piezoelectric patches depends on the thickness of the patch as well as it depends on the length of the cracked beam and the crack depth. The additional flexibil
... Show MoreThe productivity of oil wells may be improved by determining the value of enhancing well productivity and the likely reasons or sources of formation damage after the well has been recognized as underperforming. Oil well productivity may be improved, but the economics of this gradual improvement may be compromised. It is important to analyze the influence of the skin effect on the recovery of the reserve. The acid treatment evaluated for the well AD-12, primarily for the zone Mi4; using a license of Stimpro Stimulation Software to validate the experimental work to the field scale, this software is considered the most comprehensive instrument for planning and monitoring matrix acid treatments and utilizing actual data to provide a far
... Show MoreThe productivity of oil wells may be improved by determining the value of enhancing well productivity and the likely reasons or sources of formation damage after the well has been recognized as underperforming. Oil well productivity may be improved, but the economics of this gradual improvement may be compromised. It is important to analyze the influence of the skin effect on the recovery of the reserve.
The acid treatment evaluated for the well AD-12, primarily for the zone Mi4; using a license of Stimpro Stimulation Software to validate the experimental work to the field scale, this software is considered the most comprehensive instrument for planning and monitoring matrix acid treatments and utilizing actual data to prov
... Show MoreHartha Formation is an overburdened horizon in the X-oilfield which generates a lot of Non-Productive Time (NPT) associated with drilling mud losses. This study has been conducted to investigate the loss events in this formation as well as to provide geological interpretations based on datasets from nine wells in this field of interest. The interpretation was based on different analyses including wireline logs, cuttings descriptions, image logs, and analog data. Seismic and coherency data were also used to formulate the geological interpretations and calibrate that with the loss events of the Hartha Fm.
The results revealed that the upper part of the Hartha Fm. was identified as an interval capable of creating potentia
... Show More