Preferred Language
Articles
/
ijcpe-515
Estimation of rock strength from sonic log for Buzurgan oil field: A Comparison study
...Show More Authors

It is very difficult to obtain the value of a rock strength along the wellbore.  The value of Rock strength utilizing to perform different analysis, for example, preventing failure of the wellbore, deciding a completion design and, control the production of sand.  In this study, utilizing sonic log data from (Bu-50) and (BU-47) wells at Buzurgan oil field.  Five formations have been studied (Mishrif, Sadia, Middle lower Kirkuk, Upper Kirkuk, and Jaddala) Firstly, calculated unconfined compressive strength (UCS) for each formation, using a sonic log method.  Then, the derived confined compressive rock strengthens from (UCS) by entering the effect of bore and hydrostatic pressure for each formation.  Evaluations the result of compared rock strength generated from two wells for the same formation and match the bottom and top of this formation in two wells.

   Based on the obtained results, a good agreement between values of unconfined compressive strength from well (50) and well (47) that used real along of drilling section.  The net results of the match between rock strength for wells (BU-50, BU- 47) of five formations; Mishrif, Sadia, Middle lower Kirkuk, upper Kirkuk, and Jaddala were 97, 87, 96.5, 97, 86 %, respectively

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Wed Oct 07 2020
Journal Name
Indian Journal Of Forensic Medicine & Toxicology
Phylogenetic Tree Analysis of First Psychrobacter Sp. Strain From Blood of Iraqi Patient; A Case Report
...Show More Authors

View Publication
Scopus (1)
Scopus Crossref
Publication Date
Tue Oct 01 2019
Journal Name
Journal Of Engineering
Removal of Dissolved Organic Compounds and Contaminants from Wastewater of a Petroleum Refinery by Ion Exchange
...Show More Authors

The efficient removal of dissolved organic compounds (DOC) from wastewater has become a major environmental concern because of its high toxicity even at low concentrations. Therefore, a technique was needed to reduce these pollutants. Ion exchange technology (IE) was used with AmberliteTM IR120 Na, AmberliteTM IR96RF, and AmberliteTM IR402, firstly by using anion and mixed bed system, where the following variables are investigated for the process of adsorption: The height of the bed in column (8,10 and 14 cm), different concentrations of (DOC) content at constant flow rate. The use of an ion exchanger unit (continuous system) with three columns (cation, anion, and mixed bed) was studied.

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Thu Jul 01 1999
Journal Name
Bulletin Of The Iraq Natural History Museum (p-issn: 1017-8678 , E-issn: 2311-9799)
A new species of grape-nune leafhopper of the genus Arboridia Zakhvathin (Homoptera : Cicadellidae) from Iraq
...Show More Authors

The present study introduces description of a new species of genus Arboridia Zakhvaticin 1946, based on a large collection of Cicadellids. External morphological characters particularly male genitalia were discussed and illustrated. The genus Arboridia Zalchvatkiia (Typhlocybinae: Erythroneurini) contains small slender, fragil and attractively coloured and patterned leafhoppers. It was erected by Zakhvatkin in 1946 (Zalchvatkin, 1946). The overall length of adults ranges from 2.5 to 3.4 mm. Members of this genus can be recognized by inner apical cell of forewing which is long with oblique base; Cu confluent with this base at a point near the middle of the length of inner apical cell; two prominent circular deep brown spots on vertex (Zal

... Show More
View Publication
Publication Date
Wed Jun 29 2022
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Determining Optimum Oil Separator Size and Optimum Operating Pressure
...Show More Authors

The optimum separators operating pressure is determined by using flash calculations and equilibrium ratios. In this study, the optimum separator size for Jambur field is calculated by using equations introduced by Arnold and Stewart and API12J Specification [1]. Because Jambur field has a high production rate two conditions are taken in the study to determine separator size, first based on production rate 80,000 bbl/day and second based on split the production between two banks A and B (40,000 bbl/day for each bank). The calculation resulted in optimum separator pressure for the first stage of 700 psi, and the second stage of 300 psi, and the third stage of 120 psi. The results show that as the number of stages increased above three-stag

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Jun 29 2022
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Determining Optimum Oil Separator Size and Optimum Operating Pressure
...Show More Authors

The optimum separators operating pressure is determined by using flash calculations and equilibrium ratios. In this study, the optimum separator size for Jambur field is calculated by using equations introduced by Arnold and Stewart and API12J Specification [1]. Because Jambur field has a high production rate two conditions are taken in the study to determine separator size, first based on production rate 80,000 bbl/day and second based on split the production between two banks A and B (40,000 bbl/day for each bank). The calculation resulted in optimum separator pressure for the first stage of 700 psi, and the second stage of 300 psi, and the third stage of 120 psi. The results show that as the number of stages increased above three

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Dec 01 2013
Journal Name
Journal Of Economics And Administrative Sciences
Oil Sector in Iraq (Reality and Prospects) Economic Analysis
...Show More Authors

   The oil sector in Iraq suffered from several difficulties led to the decline and reduction of oil production and the deterioration of refineries and transport pipeline status in addition to the weakness of the technology side and the prevalence of financial and administrative corruption besides the high costs of rehabilitation of the oil sector and also administrative and institutional problems still ongoing. 

 In spite of Iraq's possession of vast oil wealth allows him to play an important role in the international energy market، he is still under the level. The production of oil doesn'<

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Mar 29 2020
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Dissolving Precipitated Asphaltenes Inside Oil Reservoirs Using Local Solvents
...Show More Authors

There are several oil reservoirs that had severe from a sudden or gradual decline in their production due to asphaltene precipitation inside these reservoirs. Asphaltene deposition inside oil reservoirs causes damage for permeability and skin factor, wettability alteration of a reservoir, greater drawdown pressure. These adverse changing lead to flow rate reduction, so the economic profit will drop. The aim of this study is using local solvents: reformate, heavy-naphtha and binary of them for dissolving precipitated asphaltene inside the oil reservoir. Three samples of the sand pack had been prepared and mixed with a certain amount of asphaltene. Permeability of these samples calculated before and after mixed with asphaltenes. Then, the

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Sep 11 2022
Journal Name
Journal Of Petroleum Research And Studies
Non-Productive Time Reduction during Oil Wells Drilling Operations
...Show More Authors

Often there is no well drilling without problems. The solution lies in managing and evaluating these problems and developing strategies to manage and scale them. Non-productive time (NPT) is one of the main causes of delayed drilling operations. Many events or possibilities can lead to a halt in drilling operations or a marginal decrease in the advancement of drilling, this is called (NPT). Reducing NPT has an important impact on the total expenditure, time and cost are considered one of the most important success factors in the oil industry. In other words, steps must be taken to investigate and eliminate loss of time, that is, unproductive time in the drilling rig in order to save time and cost and reduce wasted time. The data of

... Show More
View Publication
Crossref (1)
Crossref
Publication Date
Wed Feb 01 2023
Journal Name
Journal Of Engineering
Introduction and Investigation into Oil Well Logging Operations (Review)
...Show More Authors

ole in all sta Oil well logging, also known as wireline logging, is a method of collecting data from the well environment to determine subterranean physical properties and reservoir parameters. Measurements are collected against depth along the well's length, and many types of wire cabling tools depend on the physical property of interest. Well probes generally has a dynamic respon to changes in rock layers and fluid composition. These probes or well logs are legal documents that record the history of a well during the drilling stages until its completion. Well probes record the physical properties of the well, which must then be interpreted in petrographic terms to obtain the characteristics of the rocks and fluids associated with

... Show More
View Publication
Crossref (2)
Crossref
Publication Date
Mon May 29 2017
Journal Name
Iraqi Journal Of Market Research And Consumer Protection
APPLICATION OF TQM REQUIREMENTS AND THEIR RELATIONSHIP TO ORGANIZATIONAL PERFORMANCE FROM THE POINT OF VIEW OF THE INTERNAL CUSTOMER/ COMPARATIVE STUDY.: APPLICATION OF TQM REQUIREMENTS AND THEIR RELATIONSHIP TO ORGANIZATIONAL PERFORMANCE FROM THE POINT OF VIEW OF THE INTERNAL CUSTOMER/ COMPARATIVE STUDY.
...Show More Authors

This study aims to Statement of the relationship between Total Quality Management philosophy and Organizational performance from the point of view of the internal customer. A comparison has been made between two companies, one of which applies the requirements of TQM well and the other does not apply these requirements as the (General Company for Electrical Industries/ Diyala) and (General Company for Electrical Industries/ Baghdad) to conduct the search, During the questionnaire prepared for this purpose and distributed to a sample of 30 employees in the General Company for Electric Industries/ Diyala and (20) employees of the General Company for Electrical Industries/ Baghdad. Their answers were analyzed using a simple correlation coef

... Show More
View Publication Preview PDF