Pyrolysis of high density polyethylene (HDPE) was carried out in a 750 cm3 stainless steel autoclave reactor, with temperature ranging from 470 to 495° C and reaction times up to 90 minute. The influence of the operating conditions on the component yields was studied. It was found that the optimum cracking condition for HDPE that maximized the oil yield to 70 wt. % was 480°C and 20 minutes. The results show that for higher cracking temperature, and longer reaction times there was higher production of gas and coke. Furthermore, higher temperature increases the aromatics and produce lighter oil with lower viscosity.
Impact Resistance training with and against the trajectory of the motor in some physical abilities and the BioA 100-meter, mechanical racing run for young people. That Training Jogging for different distances Melt -Rubber ropes According to direction and reversed movement With Obligations To the border of scientific of components Pregnancy Training represents to a training trend Aimed To Events Developments In The link between Starting and running, According to the specific mechanical requirements Have It Of Development of force Explosive and quick and their components which To give Border To the level Special speed for Stages Sprint run 100 m and amounts Efforts Required instantaneous powers. Noted Researcher In That Over there Repeat For
... Show MoreAbstract:
The internal control is the tool through which it is possible to verify and ensure the implementation of tasks in accordance with the established plans and programs and to evaluate the level of performance that is implemented within the different companies.
A guarantee from the supplier with the absence of a specialized technical committee that follows up the stages of implementing the contract and disbursing all amounts of financial dues to the supplier before completing the implementation of the contract and overlooking the non-implementation of some clauses of the contract by the committee in charge of
... Show MoreIntegrated project delivery is collaboratively applying the skills and knowledge of all participants to optimize the project's results, increase owner value, decrease waste, and maximize efficiency during the design, fabrication, and construction processes. This study aims to determine IPD criteria positively impacting value engineering. To do this, the study has considered 9 main criteria according to PMP classification that already covers all project phases and 183 sub-criteria obtained from theoretical study and expert interviews (fieldwork). In this study, the SPSS (V26) program was used to analyze the main criteria and sub-criteria priorities from top to bottom according to their values of the Relative Importance In
... Show MoreThe problem of finding the cyclic decomposition (c.d.) for the groups ), where prime upper than 9 is determined in this work. Also, we compute the Artin characters (A.ch.) and Artin indicator (A.ind.) for the same groups, we obtain that after computing the conjugacy classes, cyclic subgroups, the ordinary character table (o.ch.ta.) and the rational valued character table for each group.
This study proposed control system that has been presented to control the electron lens resistance in order to obtain a stabilized electron lens power. This study will layout the fundamental challenges, hypothetical plan arrangements and development condition for the Integrable Optics Test Accelerator (IOTA) in progress at Fermilab. Thus, an effective automatic gain control (AGC) unit has been introduced which prevents fluctuations in the internal resistance of the electronic lens caused by environmental influences to affect the system's current and power values and keep them in stable amounts. Utilizing this unit has obtained level balanced out system un impacted with electronic lens surrounding natural varieties.
the research goal is preparing a list of standard criteria and quality controls for information technology applications to serve the Holy Quran.
To achieve this goal, the researcher has built a list of criteria according to the following steps:
First - identify the key areas covered by the whole list which are:
1 – Standards of system building and implementing with the operating screens.
2 – Standards of display forms including audio and video presentation.
3 – Standards which are related to the program philosophy.
4 - Standards which are related to the program objectives.
... Show More