The production of power using the process of pressure–retarded osmosis (PRO) has been studied both experimentally and theoretically for simulated sea water vs. river water and deionized water under two cases: the first is for simulated real conditions of sea water and river water and second under low brine solution concentration to examine the full profile of the power- pressure. The influence of concentration polarization (CP) on water flux has been examined as well.
Bauxite residue (red mud) is a waste material from alumina refineries in the Bayer process, containing significant quantities of valuable metals, notably scandium (Sc). The objective of this study is to recover Sc (III) from Hungarian bauxite residue by using hydrometallurgical processes, including solvent extraction and leaching. Red mud directly leached with hydrochloric acid to generate the leachate solution. The significant iron content (~38 %) in red mud makes it hard to recover scandium selectively due to comparable physicochemical characteristics. According to the findings, Fe (III) could be effectively extracted from hydrochloric acid leachate as HFeC14 using diethyl ether before Sc extraction. Protocol B demonstrated superior recov
... Show MoreBauxite residue (red mud) is a waste material from alumina refineries in the Bayer process, containing significant quantities of valuable metals, notably scandium (Sc). The objective of this study is to recover Sc (III) from Hungarian bauxite residue by using hydrometallurgical processes, including solvent extraction and leaching. Red mud directly leached with hydrochloric acid to generate the leachate solution. The significant iron content (~38 %) in red mud makes it hard to recover scandium selectively due to comparable physicochemical characteristics. According to the findings, Fe (III) could be effectively extracted from hydrochloric acid leachate as HFeC14 using diethyl ether before Sc extraction. Protocol B demonstrated superior recov
... Show MoreThe aims of the research is to know the role of strategic to manage the human resources in enhancement the process of knowledge management in the Ministry of Transportation , In addition to the effects occurred on outcomes for both the managers and practitioners .
For the purpose of achieving the objectives of the research , the researchers designed a questionnaire that included (40 Points for collecting the primary data from the sample of the research which contained (51) indiviluals. In light of that, the data was to collect and analyzed and hypotheses were tested by using the (SPSS) Program, and a number of statistical techniques was used to attain the goal of the research such as the means , Sta
... Show MoreElectrocoagulation process was employed for the treatment of river water flows in Iraq. In this study, a batch Electrocoagulation process was used to treat river water taken from Al - Qadisiyah water treatment plant. electrolysis time, voltage and inter-electrode spacing were the most important parameters to study . A statistical model was developed using the RSM model. The optimum condition after studying the parameter effect the process was 1 cm separating, 30 volts . The RSM model shows the ideal condition of removal for both the TSS and turbidity at 1 cm, 20 volts and 55 min.
In this research, an experimental study was conducted to high light the impact of the exterior shape of a cylindrical body on the forced and free convection heat transfer coefficients when the body is hold in the entrance of an air duct. The impact of changing the body location within the air duct and the air speed are also demonstrated. The cylinders were manufactured with circular, triangular and square sections of copper for its high thermal conductivity with appropriate dimensions, while maintaining the surface area of all shapes to be the same. Each cylinder was heated to a certain temperature and put inside the duct at certain locations. The temperature of the cylinder was then monitored. The heat transfer coefficient were then cal
... Show MoreIn this study, low cost biosorbent ̶inactive biomass (IB) granules (dp=0.433mm) taken from drying beds of Al-Rustomia Wastewater Treatment Plant, Baghdad-Iraq were used for investigating the optimum conditions of Pb(II), Cu(II), and Ni(II) biosorption from aqueous solutions. Various physico-chemical parameters such as initial metal ion concentration (50 to 200 mg/l), equilibrium time (0-180 min), pH (2-9), agitation speed (50-200 rpm), particles size (0.433 mm), and adsorbent dosage (0.05-1 g/100 ml) were studied. Six mathematical models describing the biosorption equilibrium and isotherm constants were tested to find the maximum uptake capacities: Langmuir, Freundlich, Redlich–Peterson, Sips, Khan, and Toth models. The best fit to the P
... Show MoreCharacterization of the heterogonous reservoir is complex representation and evaluation of petrophysical properties and application of the relationships between porosity-permeability within the framework of hydraulic flow units is used to estimate permeability in un-cored wells. Techniques of flow unit or hydraulic flow unit (HFU) divided the reservoir into zones laterally and vertically which can be managed and control fluid flow within flow unit and considerably is entirely different with other flow units through reservoir. Each flow unit can be distinguished by applying the relationships of flow zone indicator (FZI) method. Supporting the relationship between porosity and permeability by using flow zone indictor is ca
... Show More