Water flooding is one of the most important methods used in enhanced production; it was a pioneer method in use, but the development of technology within the oil industry, takes this subject toward another form in the oil production and application in oil fields with all types of oils and oil reservoirs. Now days most of the injection wells directed from the vertical to re-entry of full horizontal wells in order to get full of horizontal wells advantages.
This paper describes the potential benefits for using of re-entry horizontal injection wells as well as combination of re –entry horizontal injection and production wells. Al Qurainat productive sector was selected for study, which is one of the four main productive sectors of South Rumaila oil field. A simulation model – named as SRFQ was used in the present work to predict the re-entry horizontal wells performance.
Four scenarios were suggested to cover the full scope of the study; those scenarios are different in manner of wells combinations. Cumulative oil production, ultimate recovery percentage are two criteria were used to predict the performance and comparison of scenarios.
Results from simulation model (SRFQ) runs revealed that the productive sector can be continue to gain 1564.331 MMSTB till 2020, without changing to any existing injection and production wells status, which is called the base scenario. While scenario no.1 needs some of work over and remedies jobs, which gives more cumulative oil production reaches to 1698.481 MMSTB till 2020.
On another side, scenarios no. 2 and 4 are the most important scenarios because re-entry horizontal injection wells were implemented. Very good and encourage results were gained over the bas scenario from the sector under study.
At last, scenario no.3 was suggested just to predict the production capacity of the Al Qurainat sector with re-entry horizontal production wells and existing vertical injection and production wells, while the cumulative oil production reaches 3398.481MMSTB.
It is very difficult to obtain the value of a rock strength along the wellbore. The value of Rock strength utilizing to perform different analysis, for example, preventing failure of the wellbore, deciding a completion design and, control the production of sand. In this study, utilizing sonic log data from (Bu-50) and (BU-47) wells at Buzurgan oil field. Five formations have been studied (Mishrif, Sadia, Middle lower Kirkuk, Upper Kirkuk, and Jaddala) Firstly, calculated unconfined compressive strength (UCS) for each formation, using a sonic log method. Then, the derived confined compressive rock strengthens from (UCS) by entering the effect of bore and hydrostatic pressure for each formation. Evaluations th
... Show MoreThis study is concerned with making comparison in using different geostatistical methods for porosity distribution of upper shale member - Zubair formation in Luhais oil field which was chosen to study.
Kriging, Gaussian random function simulation and sequential Gaussian simulation geostatistical methods were adopted in this study. After preparing all needed data which are contour map, well heads of 12 wells, well tops and porosity from CPI log. Petrel software 2009 was used for porosity distribution of mentioned formation in methods that are showed above. Comparisons were made among these three methods in order to choose the best one, the comparing cri
With the increasing rate of unauthorized access and attacks, security of confidential data is of utmost importance. While Cryptography only encrypts the data, but as the communication takes place in presence of third parties, so the encrypted text can be decrypted and can easily be destroyed. Steganography, on the other hand, hides the confidential data in some cover source such that the existence of the data is also hidden which do not arouse suspicion regarding the communication taking place between two parties. This paper presents to provide the transfer of secret data embedded into master file (cover-image) to obtain new image (stego-image), which is practically indistinguishable from the original image, so that other than the indeed us
... Show MoreThis paper discusses the method for determining the permeability values of Tertiary Reservoir in Ajeel field (Jeribe, dhiban, Euphrates) units and this study is very important to determine the permeability values that it is needed to detect the economic value of oil in Tertiary Formation. This study based on core data from nine wells and log data from twelve wells. The wells are AJ-1, AJ-4, AJ-6, AJ-7, AJ-10, AJ-12, AJ-13, AJ-14, AJ-15, AJ-22, AJ-25, and AJ-54, but we have chosen three wells (AJ4, AJ6, and AJ10) to study in this paper. Three methods are used for this work and this study indicates that one of the best way of obtaining permeability is the Neural network method because the values of permeability obtained be
... Show MoreAccurate estimation of permeability is essential for reliable reservoir characterization and simulation. However, core data are often limited due to their high cost and operational constraints, leading to significant uncertainty in uncored intervals. This study aims to reduce the dependence on core data for permeability estimation by integrating electrofacies derived from well logs and flow zone indicator analysis in the Mishrif Formation, Nasiriyah oil field. Electrofacies were generated using dynamic clustering based on the log data from 13 wells. This led to the identification of five electrofacies units that represent intervals with similar log responses, formed by merging 75 electrofacies, where flow zone indicators analysis id
... Show More“Smart city” projects have become fully developed and are actively using video analytics. Our study looks at how video analytics from surveillance cameras can help manage urban areas, making the environment safer and residents happier. Every year hundreds of people fall on subway and railway lines. The causes of these accidents include crowding, fights, sudden health problems such as dizziness or heart attacks, as well as those who intentionally jump in front of trains. These accidents may not cause deaths, but they cause delays for tens of thousands of passengers. Sometimes passers-by have time to react to the event and try to prevent it, or contact station personnel, but computers can react faster in such situations by using ethical
... Show MoreThe main problem of this research is the delay of implementation of the investment plan projects for the period (2013-2016) and the weakness of the staff ability in the ministries and they don’t have the sufficient experience to carry out the implementation process.
Therefore, the research aims to evaluate the implementation of programs and projects of the investment plan in a manner consistent with the objectives set for them without any wasteful of efforts, time and money. And then identify the problems and obstacles to determine the deviations of the implementation of the specific for each sector according to the criteria of evaluation and the form of cost, quality, time and implementation.<
... Show More
