Knowledge of permeability is critical for developing an effective reservoir description. Permeability data may be calculated from well tests, cores and logs. Normally, using well log data to derive estimates of permeability is the lowest cost method. This paper will focus on the evaluation of formation permeability in un-cored intervals for Abughirab field/Asmari reservoir in Iraq from core and well log data. Hydraulic flow unit (HFU) concept is strongly related to the flow zone indicator (FZI) which is a function of the reservoir quality index (RQI). Both measures are based on porosity and permeability of cores. It is assumed that samples with similar FZI values belong to the same HFU. A generated method is also used to calculate permeability in un-cored zones depending on matrix density grouping, where each group has its own permeability-porosity correlation. After applying the both methods and correlating the calculated permeability with the core permeability data it revealed that matrix density grouping is the best method to calculate permeability in un-cored zones and it is better than FZI method in this field, then the estimated permeability is distributed through the members of Asmari reservoir in Abughirab field and it is concluded that permeability in this field is generally increases toward south culmination of Abughirab field.
The study aimed at identifying the strategic gaps in the actual reality of the management of public organizations investigated to determine the strategy used based on the study model. The study relied on the variable of the general organization strategy in its dimensions (the general organization strategy, the organization's political strategy and the defense strategy of the organization) The sample of the study was (General Directorate of Traffic, Civil Status Directorate and Civil Defense Directorate), formations affiliated to the Ministry of the Interior, for the importance of the activity carried out by these public organizations by providing them In order to translate the answers into a quantitative expression in the analysi
... Show MoreThe improvement of the mechanical soil characteristics of jet grouting technique is very attractive. The jet grouted soil cement columns in soft is a complicated issue because it depends on a number of factors such as, soil nature, mixture, influence among soil and grouting materials, jetting force of nozzle, jet grouting and water flow rate, rotation and lifting speed. This paper discusses the estimation of shear strength parameters of soil-cement column (soilcrete) in soft clayey soil based on the relationships between the unconfined compressive and split tensile strength for the soilcrete and the effect of the jet grouting and water pressure in the values of cohesion and internal f
Abstract
In this investigation, Al2O3 nano material of 50nm particles size were added to the 6061 Al aluminium alloy by using the stir casting technique to fabricate the nanocomposite of 10wt% Al2O3. The experimental results observed that the addition of 10wt% Al2O3 improved the fatigue life and strength of constant and cumulative fatigue. Comparison between the S-N curves behaviour of metal matrix (AA6061) and the nanocomposite 10wt% Al2O3 has been made. The comparison revealed that 12.8% enhancement in fatigue strength at 107cycles due to 10wt% nano reinforcement. Also cumulative fatigue l
... Show MoreThe increasing use of plastics in various aspects of modern life resulted in the availability of enormous amount of wastes, including a negative effect on the environment and humans. So it is necessary to find solutions to deal with these wastes and ensure to use them as solutions to use in concrete mix . In this research the production of concrete containing high and low density polyethylene has been used by (5, 10, 15)% as a replacement of part of the volume of sand, so as to obtain concrete good compressive strength as well as other benefits such as improved possibility of pumping concrete and reduce the loss of concrete for workability polymer is a material that is non-absorbable of water . It is also intended to dispose of these was
... Show MoreAbstract:
There is a close relationship between rigidity and distort structure of production and productivity and inflation rates. The effects of this relationship are distorted the contribution rate of the productive sectors and the disproportionate of exchange rate in foreign trade.
raising the general level of prices is one of the way that have been used by previous governments (inflationary financing or deficit financing) in order to speed up the process of capital formation, depending on the availability of economic resources idle.
The fabricating inflation for development does not represent a true understanding of the nature of the
... Show MoreThe Karolinka earth-fill dam was constructed between 1977 and 1984 on the Stanovnice river above the town of Karolinka in the region of Vsetínsko in Czech Republic. Because of leakage on the downstream dam face due to technological indiscipline when filling dam layers during the dam construction stage, there were some steps to improve state dam safety. The final rehabilitation is to construct the diaphragm walls from self-hardening cement-bentonite suspension along the length of the dam. In addition to connecting the gallery and abutment (2 × 25 m long) by using jet piles. The article presents numerical modeling of safety factor evaluation associated with the state of the dam body and foundation; before, and after seal
... Show MoreThe purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tender phase of
... Show MoreThe purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tend