The Khor Mor gas-condensate processing plant in Iraq is currently facing operational challenges due to foaming issues in the sweetening tower caused by high-soluble hydrocarbon liquids entering the tower. The root cause of the problem could be liquid carry-over as the separation vessels within the plant fail to remove liquid droplets from the gas phase. This study employs Aspen HYSYS v.11 software to investigate the performance of the industrial three-phase horizontal separator, Bravo #2, located upstream of the Khor Mor sweetening tower, under both current and future operational conditions. The simulation results, regarding the size distribution of liquid droplets in the gas product and the efficiency gas/liquid separation, reveal that the separator falls short of eliminating all liquid droplets of specified sizes from the gas phase to meet efficiency requirements, weather with or without a mist extractor. Consequently, an analysis of various structural parameters of the vessel is undertaken to determine their impact on the carried-over liquid mass flow rate and the vessel’s gas/liquid efficiency. The findings recommend a new design concept termed the "smart separator" for Bravo #2, applicable to both current and anticipated operational scenarios. The smart separator demonstrates a remarkable enhancement in gas/liquid separation efficiency, showcasing improvements of 21.31% and 24.02% under existing and future operating conditions, respectively. This innovative design proves effective in controlling liquid carry-over and maintaining high-efficiency levels, even as vessel inlet flow rates increase over time, thus preventing foaming phenomena in downstream processes caused carried-over liquids.
Finding orthogonal matrices in different sizes is very complex and important because it can be used in different applications like image processing and communications (eg CDMA and OFDM). In this paper we introduce a new method to find orthogonal matrices by using tensor products between two or more orthogonal matrices of real and imaginary numbers with applying it in images and communication signals processing. The output matrices will be orthogonal matrices too and the processing by our new method is very easy compared to other classical methods those use basic proofs. The results are normal and acceptable in communication signals and images but it needs more research works.
The kinetic of atropine pertraction from seeds of Datura Metel Linn plant was studied. Diisopropyl ether, n-hexane and n-heptane were used as membranes for atropine recovery. The effect of speed of agitation and time in the range of 200-300 rpm and 0-3.5h, respectively were studied using the proposed membranes. The pertraction experiments were carried outs in a batch laboratory unit. The liquid-liquid pertraction was found to be very suitable for atropine recovery from its liquid extracts of Datura Metel seeds. A high purity (94-96%) can be obtained in the receiver phase. The pertraction process was found to be very selective for atropine recovery with diisopropyl ether membrane. As the speed of agitation increases the efficiency of pertrac
... Show MoreA new concrete rheometer is introduced including its innovation, actual design, working rules,
calibration, and reliability. A modified design of Tattersall two-point device is created. Some of
components are purchased from local and foreign markets, while other components and the
manufacturing process are locally fabricated. The matching viscosity method of determining the mixer
viscometer constants is demonstrated and followed to relate torque and rotational speed to yield stress
and viscosity (Bingham parameters). The calibration procedures and its calculation are explained.
Water is used as a Newtonian fluid, while; cement paste (cement + water) with w/c ratio equal to
(0.442) is used as a non-Newtonian fluid. Th
The aim of this research is to compare traditional and modern methods to obtain the optimal solution using dynamic programming and intelligent algorithms to solve the problems of project management.
It shows the possible ways in which these problems can be addressed, drawing on a schedule of interrelated and sequential activities And clarifies the relationships between the activities to determine the beginning and end of each activity and determine the duration and cost of the total project and estimate the times used by each activity and determine the objectives sought by the project through planning, implementation and monitoring to maintain the budget assessed
... Show More