The Gullfaks field was discovered in 1978 in the Tampen area of the North Sea and it is one of the largest Norwegian oil fields located in Block 34/10 along the western flank of the Viking Graben in the northern North Sea. The Gullfaks field came on stream in 1986 and reached a peak of production in 2001. After some years, a decrease in production was noticed due to the decrease in pressure in the well. The goal of this paper is to improve the production of a well located in Gullfaks field by injecting CO2 through coiled tubing. The use of the CO2 injection method is due to the fact that it is a greenhouse gas, and its production in the atmosphere contributes to global warming. It is important to reduce its emission into the atmosphere and to boost the production of oil in the well. The CO2 is injected through the coil tubing to lighten the hydrostatic column and allow the fluid to move from the tubing to the surface. The completion and PVT data are processed in Pipesim and Prosper softwares. By integrating a number of calculations by using the nodal analysis methods and gas injection methods, the results obtained show that the well is not producing and by injecting sequestrated CO2 at the flow rate of 1.482 MMScft/d with an injection pressure of 2500 psig, the oil flow rate provided by the coiled tubing gas injection is 900 Stb/d. The profitability of the project is achieved over a period of 20 years with a net present value (NPV) of $11948858.5 and a return on investment after 5 years 2 weeks.
Cost is the essence of any production process for it is one of the requirements for the continuity of activities so as to increase the profitability of the economic unit and to support the competitive situation in the market. Therefore, there should be an overall control to reduce the cost without compromising the product quality; to achieve this, the management should have detailed credible and reliable information about the cost to be measured, collected, understood and to analyze the causes for the spread of deviations and obstacles the management faces, and to search for the factors that trigger the emergence of these deviations and obstacles
The objective of this research is to determine the relationship between the performance evaluation process and the training programs for the employees, to identify the extent of the organization's commitment to perform the performance evaluation process for its employees and to use the results of this process in determining the appropriate training programs. Performance evaluation, functional analysis, evaluation method used, dependent variable (training programs) and its dimensions, type of programs, program objectives, program curriculum, And the application of the field research methodology and the questionnaire, which included 146 individuals to know their views and analyz
... Show MoreThe aim of this study is to detect the level of psychological stress among unemployed individuals and the level of their wellbeing by finding the correlation between these two variables.
The research sample consisted of (99) people who are currently unemployed and registered at the Ministry of Labor Affairs.
Schafer (1996) scale for psychological stress was used and alongside Ziout's (2012) scale for wellbeing.
The results of the research showed an inverse relation between being unemployed and having wellbeing.
&nb
... Show MoreThe importance of kick tolerance in well operations has recently increased due to its implications in well design, in drilling and well control. To study a simple method for the application of kick tolerance concept in an effective way on the basis of field data, this research purpose is to improve knowledge about Kick Tolerance and represents a technical basis for the discussion on revision of standard procedure.
The objective of this work is to review and to present a methodology of determination the kick tolerance parameters using the circulation kicks tolerance concepts.
The proposed method allows to know, to evaluate and to analyze the kick tolerance problem in order to make the drilling exe
... Show MoreThe importance of kick tolerance in well operations has recently increased due to its implications in well design, in drilling and well control. To study a simple method for the application of kick tolerance concept in an effective way on the basis of field data, this research purpose is to improve knowledge about Kick Tolerance and represents a technical basis for the discussion on revision of standard procedure. The objective of this work is to review and to present a methodology of determination the kick tolerance parameters using the circulation kicks tolerance concepts. The proposed method allows to know, to evaluate and to analyze the kick tolerance problem in order to make the drilling execution safer and more economical by reducin
... Show MoreThe corrosion behavior of Titanium in a simulated saliva solution was improved by Nanotubular Oxide via electrochemical anodizing treatment using three electrodes cell potentiostat at 37°C. The anodization treatment was achieved in a non-aqueous electrolyte with the following composition: 200mL ethylene glycol containing 0.6g NH4F and 10 ml of deionized water and using different applied directed voltage at 10°C and constant time of anodizing (15 min.). The anodized titanium layer was examined using SEM, and AFM technique.
The results showed that increasing applied voltage resulted in formation titanium oxide nanotubes with higher corrosion resistance
Drilling with casing (DWC) can be considered as a modern drilling technique in which both of drilling and casing operations done in the same time by using the casing to transfer the hydraulic and mechanical power to the bit instead of traditional drilling string. To overcome oil well control, minimizing the total cost through enhancing drilling efficiency, drilling with casing was proposed as an enabling technology.
Two surface sections (17 1/2 - and 12 1/4- inch) were drilled successfully in Rumaila oil field with casing strings which reached 655m and 1524m measured depths respectively.
By using DWC technique, the total drill/case phase time was reduced up to 20% comparing to conventional
... Show MoreThe research included the introduction to the research and its importance as knee joint is an important joint in the human body that is prone to injury. One such injury is knee roughness injury that occurs as a result of the stress of the knee joint and age. The importance of examining the need for the use of rehabilitation exercises, especially in the watercourse system, is highlighted by the fact that the aquatic environment is one of the most important factors helping to alleviate pain and rehabilitate the knee joint and thereby improve the mobility of those with knee roughness. The problem of research is that rehabilitation exercises have been developed in the watercourse system on the basis of scientific bases with a repetitive and sys
... Show MorePermeability is one of the essential petrophysical properties of rocks, reflecting the rock's ability to pass fluids. It is considered the basis for building any model to predict well deliverability. Yamama formation carbonate rocks are distinguished by sedimentary cycles that separate formation into reservoir units and insulating layers, a very complex porous system caused by secondary porosity due to substitute and dissolution processes. Those factors create permeability variables and vary significantly. Three ways used for permeability calculation, the firstly was the classical method, which only related the permeability to the porosity, resulting in a weak relationship. Secondly, the flow zone indicator (FZI) was divided reservoir into
... Show MoreIn recent years the interest in fractured reservoirs has grown. The awareness has increased analysis of the role played by fractures in petroleum reservoir production and recovery. Since most Iraqi reservoirs are fractured carbonate rocks. Much effort was devoted to well modeling of fractured reservoirs and the impacts on production. However, turning that modeling into field development decisions goes through reservoir simulation. Therefore accurate modeling is required for more viable economic decision. Iraqi mature field being used as our case study. The key point for developing the mature field is approving the reservoir model that going to be used for future predictions. This can