Preferred Language
Articles
/
ihhViJQBVTCNdQwCmRze
Incivility among nursing faculty: A multi-country study
...Show More Authors

Scopus Clarivate Crossref
View Publication
Publication Date
Sun Dec 03 2017
Journal Name
Baghdad Science Journal
Network Self-Fault Management Based on Multi-Intelligent Agents and Windows Management Instrumentation (WMI)
...Show More Authors

This paper proposed a new method for network self-fault management (NSFM) based on two technologies: intelligent agent to automate fault management tasks, and Windows Management Instrumentations (WMI) to identify the fault faster when resources are independent (different type of devices). The proposed network self-fault management reduced the load of network traffic by reducing the request and response between the server and client, which achieves less downtime for each node in state of fault occurring in the client. The performance of the proposed system is measured by three measures: efficiency, availability, and reliability. A high efficiency average is obtained depending on the faults occurred in the system which reaches to

... Show More
View Publication Preview PDF
Scopus Crossref
Publication Date
Sat Jan 23 2021
Journal Name
Neural Computing And Applications
Multi-objectives TLBO hybrid method to select the related risk features with rheumatism disease
...Show More Authors

View Publication
Scopus (11)
Crossref (9)
Scopus Clarivate Crossref
Publication Date
Thu Apr 01 2021
Journal Name
Applied Soft Computing
Evolutionary multi-objective set cover problem for task allocation in the Internet of Things
...Show More Authors

Scopus (8)
Crossref (7)
Scopus Clarivate Crossref
Publication Date
Thu Apr 01 2021
Journal Name
Applied Soft Computing
Evolutionary multi-objective set cover problem for task allocation in the Internet of Things
...Show More Authors

View Publication
Scopus (8)
Crossref (7)
Scopus Clarivate Crossref
Publication Date
Mon May 01 2023
Journal Name
Periodicals Of Engineering And Natural Sciences
Solving the multi-criteria: total completion time, total late work, and maximum earliness problem
...Show More Authors

Within this research, The problem of scheduling jobs on a single machine is the subject of study to minimize the multi-criteria and multi-objective functions. The first problem, minimizing the multi-criteria, which include Total Completion Time, Total Late Work, and Maximum Earliness Time (∑𝐶𝑗, ∑𝑉𝑗, 𝐸𝑚𝑎𝑥), and the second problem, minimizing the multi-objective functions ∑𝐶𝑗 + ∑𝑉𝑗 +𝐸𝑚𝑎𝑥 are the problems at hand in this paper. In this study, a mathematical model is created to address the research problems, and some rules provide efficient (optimal) solutions to these problems. It has also been proven that each optimal solution for ∑𝐶𝑗 + ∑𝑉𝑗 + 𝐸𝑚𝑎𝑥 is an effic

... Show More
View Publication
Scopus (7)
Crossref (1)
Scopus Crossref
Publication Date
Tue Aug 01 2023
Journal Name
Journal Of Engineering
3D- ABAQUS Modelling of Prestressed Concrete Hunched Beams with Multi-Openings of Different Shapes
...Show More Authors

A long-span Prestressed Concrete Hunched Beam with Multi-Opening has been developed as an alternative to steel structural elements. The commercial finite element package ABAQUS/CAE version 2019 has been utilized. This article has presented the results of three-dimensional numerical simulations investigating the flexural behaviour of existing experimental work of supported Prestressed Concrete Hunched Beams with multiple openings of varying shapes under static monotonic loads. Insertion openings in such a beam lead to concentrate stresses at the corners of these openings; as a result, extensive cracking would appear. Correlation between numerical models and empirical work has also been discussed regarding load displacemen

... Show More
View Publication Preview PDF
Scopus (5)
Crossref (4)
Scopus Crossref
Publication Date
Sun Dec 01 2013
Journal Name
Journal Of Economics And Administrative Sciences
Applied probability model of inventory multi- period in stores of cement factory in Samawah
...Show More Authors

In this paper will be applied to a probability model of inventories periods of multiple stores of raw materials used in the cement industry, cement factory in Samawah and basic materials are limestone, soil normal, iron soil, fuel oil and gypsum. It was built of this model after the test and determine the distribution of demand during the supply period (waiting period) for each subject and independently of the rest of the material as it is not affected by any of the materials above interrelated in the process of supply, this test has been using the Statistical Package of (SPSS) and then was determining the amount of request optimum seeking in each batch and each substance known volume of economic optimization of

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Wed Apr 01 2015
Journal Name
Journal Of Economics And Administrative Sciences
Multi-level model of the factors that affect the escalation of dust in Iraq
...Show More Authors

In this research The study of Multi-level  model (partial pooling model) we consider The partial pooling model which is one Multi-level  models and one of  the Most important models and extensive use and application in the analysis of the data .This Model characterized by the fact that the treatments take hierarchical or structural Form, in this partial pooling models, Full Maximum likelihood FML was used to estimated parameters of partial pooling models (fixed and random ), comparison between the preference of these Models, The application was on the Suspended Dust data in Iraq, The data were for four and a half years .Eight stations were selected randomly  among the stations in Iraq. We use Akaik′s Informa

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Nov 01 2017
Journal Name
Journal Of Computational And Theoretical Nanoscience
Solution for Multi-Objective Optimisation Master Production Scheduling Problems Based on Swarm Intelligence Algorithms
...Show More Authors

The emphasis of Master Production Scheduling (MPS) or tactic planning is on time and spatial disintegration of the cumulative planning targets and forecasts, along with the provision and forecast of the required resources. This procedure eventually becomes considerably difficult and slow as the number of resources, products and periods considered increases. A number of studies have been carried out to understand these impediments and formulate algorithms to optimise the production planning problem, or more specifically the master production scheduling (MPS) problem. These algorithms include an Evolutionary Algorithm called Genetic Algorithm, a Swarm Intelligence methodology called Gravitational Search Algorithm (GSA), Bat Algorithm (BAT), T

... Show More
View Publication Preview PDF
Scopus (18)
Crossref (14)
Scopus Crossref
Publication Date
Sun Jul 26 2026
Journal Name
Discover Artificial Intelligence
Multi-classification of autism spectrum disorder behavior for children using explainable artificial intelligence techniques
...Show More Authors

Precise and interpretable classification of autism-related behaviors is important for initial diagnosis, personalized intervention, and support arrangements. This study proposes an interpretable machine learning (ML) model using Light Gradient Boosting Machine (LightGBM) and Categorical Boosting (CatBoost) to classify behavioral patterns into four categories (normal, mild, moderate, and severe) associated with Autism Spectrum Disorder (ASD) based on a custom 377-instance survey dataset from Iraqi parents and teachers of children aged 6-12. The model observes 16 key features across communication and social interaction, repetitive behaviors, language, and adaptive skills, preprocessed via interquartile range (IQR) outlier removal, me

... Show More
View Publication Preview PDF
Crossref