Preferred Language
Articles
/
iBc17I0BVTCNdQwC6Sns
Using modified earned value for cost control in construction projects
...Show More Authors

Scopus
Publication Date
Tue Dec 01 2009
Journal Name
Iraqi Journal Of Physics
Construction of Anisotype CdS/Si Heterojunction and Lineup Using I-V and C-V Measurements
...Show More Authors

Near-ideal p-CdS/n-Si heterojunction band edge lineup has been investigated for the first time with aid of I-V and C-V measurements. The heterojunction was manufactured by deposition of CdS films prepared by chemical spray pyrolysis technique (CSP) on monocrystalline n-type silicon. The experimental data of the conduction band offset Ec and valence band offset Ec were compared with theoretical values. The band offset Ec=530meV and Ev=770meV obtained at 300K. The energy band diagram of p-CdS/n-Si HJ was constructed. C-V measurements depict that the junction was an abrupt type and the built-in voltage was determined from C-2-V plot

View Publication Preview PDF
Publication Date
Mon Jun 01 2015
Journal Name
Conference: 8th International Conference And Exhibition On Design And Production Of Machines And Dies/molds
Design, Construction, and Controlling of A Shaped Metal Deposition Machine Using Arc Metal-Wire System
...Show More Authors

Publication Date
Fri May 01 2020
Journal Name
Journal Of Building Engineering
Technologies for safety and health management in construction: Current use, implementation benefits and limitations, and adoption barriers
...Show More Authors

View Publication
Scopus (246)
Crossref (196)
Scopus Clarivate Crossref
Publication Date
Thu Feb 28 2019
Journal Name
Journal Of Engineering
Modified W-LEACH Protocol in Wireless Sensor Network
...Show More Authors

In this paper, a Modified Weighted Low Energy Adaptive Clustering Hierarchy (MW-LEACH) protocol is implemented to improve the Quality of Service (QoS) in Wireless Sensor Network (WSN) with mobile sink node. The Quality of Service is measured in terms of Throughput Ratio (TR), Packet Loss Ratio (PLR) and Energy Consumption (EC). The protocol is implemented based on Python simulation. Simulation Results showed that the proposed protocol provides better Quality of Service in comparison with Weighted Low Energy Cluster Hierarchy (W-LEACH) protocol by 63%.

  

View Publication Preview PDF
Crossref (5)
Crossref
Publication Date
Sat Apr 04 2026
Journal Name
Engineering, Technology & Applied Science Research
Experimental Optimization of PLC-Integrated Multi-Loop PID Control for a Three-Level Electro-Hydraulic Elevator Using PSO and Cheetah Optimizer
...Show More Authors

This study presents the design, modeling, and experimental evaluation of a three-level electro-hydraulic elevator system controlled by a Delta DVP-20SX2 Programmable Logic Controller (PLC) equipped with an integrated Proportional–Integral–Derivative (PID) module. The PLC, programmed in Ladder Logic using ISPSoft 2.46, regulates cabin motion across all three levels. A detailed MATLAB/Simulink model was developed, incorporating three PID controllers: one for displacement regulation via a proportional directional control valve and two for dynamic pressure regulation using a proportional pressure relief valve. Conventional PID parameters were initially tuned using the trial-and-error method based on time-domain performance indices a

... Show More
View Publication
Scopus (1)
Crossref (1)
Scopus Crossref
Publication Date
Sat Dec 01 2012
Journal Name
Journal Of Economics And Administrative Sciences
Scheduling Critical Activities of Stochastic Projects Management
...Show More Authors

In this paper, we consider the problem of stochastic project network when some or all activities are interrupted. An approach has been built to schedule the critical activities, by constructing some expressions based on the project lateness costs due to the interruption activities. Two simple example are presented to validate our approach.

Key words: Project Management, Project scheduling, Stochastic activity duration, Stochastic PERT.    

Introduction

   Recently, Projects planning and optimal timing, under uncertainty are extremely critical for many organizations, see [19]. Having an effective mathematical model wi

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Oct 01 2017
Journal Name
Journal Of Engineering
Mismanagement Reasons of the Projects Execution Phase
...Show More Authors

The execution phase  of the project is most dangerous and the most drain on the resources during project life cycle, therefore, its need to monitor and control by specialists to exceeded obstructions and achieve the project goals. The study aims to detect the actual reasons behind mismanagement of the execution phase. The study begins with theoretical part, where it deals with the concepts of project, project selection, project management, and project processes. Field part consists of three techniques: 1- brainstorming, 2- open interviews with experts and 3- designed questionnaire (with 49 reason. These reasons result from brainstorming and interviewing with experts.), in order to find the real reasons behind misman

... Show More
View Publication Preview PDF
Publication Date
Fri Sep 30 2022
Journal Name
International Journal Of Intelligent Systems And Applications In Engineering
Optimizing Methods of Funding Residential Complexes Projects
...Show More Authors

Scopus (4)
Scopus
Publication Date
Sun May 02 2021
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Value at risk simulation in a fixed return stock portfolio using the Monte Carlo simulation model The concept of a bond portfolio
...Show More Authors

This research aims to predict the value of the maximum daily loss that the fixed-return securities portfolio may suffer in Qatar National Bank - Syria, and for this purpose data were collected for risk factors that affect the value of the portfolio represented by the time structure of interest rates in the United States of America over the extended period Between 2017 and 2018, in addition to data related to the composition of the bonds portfolio of Qatar National Bank of Syria in 2017, And then employing Monte Carlo simulation models to predict the maximum loss that may be exposed to this portfolio in the future. The results of the Monte Carlo simulation showed the possibility of decreasing the value at risk in the future due to the dec

... Show More
View Publication Preview PDF
Publication Date
Mon Jul 01 2024
Journal Name
Alexandria Engineering Journal
Comparison of some Bayesian estimation methods for type-I generalized extreme value distribution with simulation
...Show More Authors

The Weibull distribution is considered one of the Type-I Generalized Extreme Value (GEV) distribution, and it plays a crucial role in modeling extreme events in various fields, such as hydrology, finance, and environmental sciences. Bayesian methods play a strong, decisive role in estimating the parameters of the GEV distribution due to their ability to incorporate prior knowledge and handle small sample sizes effectively. In this research, we compare several shrinkage Bayesian estimation methods based on the squared error and the linear exponential loss functions. They were adopted and compared by the Monte Carlo simulation method. The performance of these methods is assessed based on their accuracy and computational efficiency in estimati

... Show More
View Publication
Scopus (11)
Crossref (9)
Scopus Clarivate Crossref