Low incoming discharge upstream of Samarra-Al Tharthar System leads to sediment accumulation and forming islands, especially an island upstream of Al Tharthar Regulator. This island and the sedimentation threaten the stability of the structure and reduce the efficiency of the system. This study aims to hydraulically identify the sedimentation problem mentioned above, to find solutions of how to control the sediment problems, and to develop the capacity of
the system for 500 years return period flood of 15060 m3/s. Surface Water Modeling System (SMS10.1) with two dimensional depth average models (RMA-2) software were used to simulate and analyze the system. The results of analysis showed that the maximum permissible discharge through t
The main risks arising from the WTO Agreement are the inequality and lack of competitiveness of most pharmaceutical goods, as well as the fact that Iraq is a net importer of medicines that are at the core of consumer needs, The subject matter of the Convention on the Protection of Intellectual Property Rights and its implications for the pharmaceutical industry, in particular, coinciding with the situation of financial and administrative corruption, all of which has resulted in drug fraud in the Iraqi market and its impact on public health. The control of medical technology, the persistence of the technological gap and its effects on high price levels, and the fact that domestic drug producers are obliged to obtain production licenses from
... Show MoreThe main risks arising from the WTO Agreement are the inequality and lack of competitiveness of most pharmaceutical goods, as well as the fact that Iraq is a net importer of medicines that are at the core of consumer needs, The subject matter of the Convention on the Protection of Intellectual Property Rights and its implications for the pharmaceutical industry, in particular, coinciding with the situation of financial and administrative corruption, all of which has resulted in drug fraud in the Iraqi market and its impact on public health. The control of medical technology, the persistence of the technological gap and its effects on high price levels, and the fact that domestic drug producers are obliged to obtain production licens
... Show MoreThe performa of evaluation process is a process that should be carried out by all industrial management in order to stand on aspects of development or underdevelopment of the various departments and activities in its industrial project for the purpose of identifying obstacles and find out the causes and then avoid them quickly. And intended to rectify the performance evaluation of the activities of industrial project or economic union by measuring the results achieved within a specific operational process and compare it to what is already targeted, and often the time for comparison of one year.
The process of performance evaluation depends upon several criteria and indicators within the
... Show MoreA study in the treatment and reuse of oily wastewater generated from the process of fuel oil treatment of gas turbine power plant was performed. The feasibility of using hollow fiber ultrafiltration (UF) membrane and nanofiltration (NF) membrane type polyamide thin-film composite in a pilot plant was investigated. Three different variables: pressure (0.5, 1, 1.5 and 2 bars), oil content (10, 20, 30 and 40 ppm), and temperature (15, 20, 30 and 40 ᵒC) were employed in the UF process while TDS was kept constant at 150 ppm. Four different variables: pressure (2, 3, 4 and 5 bar), oil content (2.5, 5, 7.5 and 10 ppm), total dissolved solids (TDS) (100, 200,300 and 400 ppm), and temperature (15, 20, 30 and 40 ᵒC) were manipulated with the h
... Show MoreThis paper proposes a completion that can allow fracturing four zones in a single trip in the well called “Y” (for confidential reasons) of the field named “X” (for confidential reasons). The steps to design a well completion for multiple fracturing are first to select the best completion method then the required equipment and the materials that it is made of. After that, the completion schematic must be drawn by using Power Draw in this case, and the summary installation procedures explained. The data used to design the completion are the well trajectory, the reservoir data (including temperature, pressure and fluid properties), the production and injection strategy. The results suggest that multi-stage hydraulic fracturing can
... Show MoreGas lift is one of the artificial lift techniques which it is frequently implemented to raise oil production. Conventionally, the oil wells produce depending on the energy of reservoir pressure and solution gas which declines due to continuous production. Therefore, many oil wells after a certain production time become unable to lift oil to the surface. Thus, the continuity of production requires implementation of gas lift which works to decrease the average fluid density in the tubing by injection gas through the annulus into the tubing. This paper aims to get maximum oil production of an Iraqi giant oil field at optimum injected gas rate. The field is located in south of Iraq and in
The study focused on the treatment of real oilfield produced water from the East Baghdad field affiliated to the Midland Oil Company (Iraq) using an oil skimming process followed by a coagulation/flocculation process for zero liquid discharge system applications. Belt type oil skimmer was utilized for evaluating the process efficiency with various operating conditions such as temperature (17-40 °C) and time (0.5-2.5 hr.). Polyaluminum chloride (PAC) coagulant and polyacrylamide (PAM) flocculant was used to investigate the performance of the coagulation/flocculation process with PAC dosage (5-90 ppm) and pH (5-10) as operating conditions. In the skimming process, the oil content, COD, turbidity, and TSS decreased with an increase in tempera
... Show More