Among the undesirable effects of soil compaction is a measurable reduction in plant growth and crop yield. The prevailing belief is that compacted tillage pans are caused by repetitive farming practices, heavy tractors, tillage tools, and field traffic. This experiment was conducted to determine and map the hardpan layers across an agricultural field through advanced technologies of precision agriculture. These valuable techniques such as data logger, yield map, and data analysis of performance indicators were linked with accurate global positioning systems (GPS) datasets. These important technologies provided the farmers and helped them to identify and manage areas of the fields with higher compacted layers. Three ground speeds 4.3, 5.2, and 6.4 km h-1 were performed with two tillage depths 25 and 40 cm of a chisel plow. The effects of these two factors were studied to determine slippage percentage, field productivity, traction power, and fuel consumption. For the first shallow 25 cm depth, the results showed that increasing the speed from 4.3 to 5.2 and then to 6.4 km h-1 led to a significant increase in slippage percentage from 7.22 to 10.35 and then to 12.63%, respectively. Increasing the speed increases field productivity from 0.547 to 0.663 then to 0. 749 ha hour-1, and tractive power increases from 9.44 to 11.74, then to 13.24 hp. As a result, there was a significant increase in the fuel consumption rate from 18.44 to 20.15, then to 22.27 L hour-1, respectively. Changing the depth from 25 to 40 cm and increasing the practical speed from 4.3 to 5.2 and then to 6.4 km h-1 led to a significant increase in slippage percentage from 10.14 to 12.77 and then to 15.27%, and a significant increase in field productivity from 0.446 to 0.568 and then to 0.640 ha hour-1, respectively. This led to a significant increase in traction power from 12.72 to 13.36, then to 15.87 hp. Increasing the speed also brought a significant increase in fuel rate from 22.14 to 23.54 and then to 26.14 L ha-1, respectively. Based on this study, it was concluded that the use of this powerful approach was a useful methodology to reflect, determine, specify, and manage the regions of induced and hardpan zones by means of dataset analyses provided by the GPS for the desired field.
A new method for the determination of the drug cefalexin in some Pharmaceuticals using (UV-Vis) and indirect Flame Atomic Absorption Spectrophotometer (FAAS) , Fe III should forms a chelating complex with cefalexin (CEX –Fe III) at pH (1-8) and the best pH for the formation of (CEX –Fe III) chelating complex was (2) .The complex extracted with Methanol and Dimethy-Sulphoxide .The mole-ratio method has been used to determine the structure of chelate (CEX - Fe III) and found to be 2:1 LM ( Ligand : Metal.) .
Keywords : Cefalexin , chelating complex.
Abstract
Although the rapid development in reverse engineering techniques, 3D laser scanners can be considered the modern technology used to digitize the 3D objects, but some troubles may be associate this process due to the environmental noises and limitation of the used scanners. So, in the present paper a data pre-processing algorithm has been proposed to obtain the necessary geometric features and mathematical representation of scanned object from its point cloud which obtained using 3D laser scanner (Matter and Form) through isolating the noised points. The proposed algorithm based on continuous calculations of chord angle between each adjacent pair of points in point cloud. A MATLAB program has been built t
... Show MoreFor the first time Iron tungstate semiconductor oxides films (FeWO4) was successfully synthesized simply by advanced controlled chemical spray pyrolysis technique, via employed double nozzle instead of single nozzle using tungstic acid and iron nitrate solutions at three different compositions and spray separately at same time on heated silicone (n-type) substrate at 600 °C, followed by annealing treatment for one hour at 500 °C. The crystal structure, microstructure and morphology properties of prepared films were studied by X-ray diffraction analysis (XRD), electron Scanning Electron Microscopy (SEM) and Atomic Force Microscopy (AFM) respectively. According to characterization techniques, a material of well-crystallized monoclinic ph
... Show MoreThe analysis of the root cause techniques is a reasonable option to be made to assess the root causes of the funding of construction projects. There are a variety of issues related to financing in construction industries in Iraq. The root,cause analysis is the impact of security and social conditions on financial funding. Variety tools of root cause analysis have originated from literature, as common methods for the detection of root causes. The purpose of this study was to identify and diagnose causes that lead to obstruction of financial funding in the construction projects in the republic of Iraq from the contractors' point of view and their interaction with a number of variables. The study diagnosed nine causes of fi
... Show MoreSoftware cost management is a significant feature of project management. As such, it needs to be employed in a project or line of work. Software cost management is integral to software development failures, which, in turn, cause software failure. Thus, it is imperative that software development professionals develop their cost management skills to deliver successful software projects. The aim of this study is to examine the impact of cost management success factors with project management factors and three agile methodologies – Extreme Programming (XP), Scrum and Kanban methodologies which are used in the Pakistani software industry. To determine the results, the researchers applied quantitative approach through an extensive survey on
... Show MoreThe avoidance of failure in construction projects is not an easy task, which makes the failure of the construction project to achieve its objectives a major problem experienced by all countries in the world, especially Iraq. Where nearly two-thirds of the construction projects in the world have been suffered by significant problems as an increase in the cost of the project, delay in the specified duration for execution, and stopping the project. Therefore it is required to study and apply new methods for managing the construction project to ensure its success and achieve its objectives. The aim of this study is to study the Agile project management method and its impact on the construction project. In addition, to identi
... Show More