The regular job of a reservoir engineer is to put a development plan to increase hydrocarbon production as possible and within economic and technical considerations. The development strategy for the giant reservoir is a complex and challenging task through the decision-making analysis process. Due to the limited surface water treatment facility, the reservoir management team focuses on minimizing water cut as low as possible by check the flow of formation and injected water movement through the Mishrif reservoir. In this research, a representative sector was used to make the review of water injection configuration, which is considered an efficient tool to make study in a particular area of the entire field when compared with the full-field model on the basis of time-consuming and computational analysis. The sector model was neighboring by extra grid blocks and three pseudo wells as injector wells to realize the pressure on the sector boundary, which attained an acceptable history matching. The fluid model and physics model were introduced by using Pressure Volume Temperature data of well involved in the study area and two relative permeability curves. Fourteen wells were utilized in this work, four wells are injectors, and the rest are producer. The development scenarios were implemented by setting various targets of oil production and different water injection rates required for pressure maintenance operations. Optimization of water cut has been applied by adjustment of production and injection rates and shut off the high water cut intervals. The results obtained from this study showed that the inverted 9-spot has a good recovery which is illustrated in the case_2C, the production rate was (49,000 STB/D) with minimum water cut (27.5%) as compared with a five-spot pattern.
Formation of emulsions during oil production is a costly problem, and decreased water content in emulsions leads to increases productivity and reduces the potential for pipeline corrosion and equipment used. The chemical demulsification process of crude oil emulsions is one of the methods used for reducing water content. The demulsifier presence causes the film layer between water droplets and the crude oil emulsion that to become unstable, leading to the accelerated of water coalescence. This research was performed to study the performance of a chemical demulsifier Chimec2439 (commercial) a blend of non-ionic oil-soluble surfactants. The crude oils used in these experiments were Basrah and Kirkuk Iraqi crude oil. These
... Show MoreThe aim of the research is to determine the impact of the Iraqi public budget on IPSASs by conducting the questionnaire; the research was based on the hypothesis that "there is an impact of the adoption of the International Accounting Standards in the general budget of Iraq”. The research concluded that the government accounting system closely interferes with the general budget at all stages. The shifting towards the accrual basis is the first element of the reform package towards reaching the reform of the state budget. Without reforming government accounting, it is almost impossible to develop the budget. IPSASs are a recognized reference to the assessment and development of governmen
... Show MoreUnconfined Compressive Strength is considered the most important parameter of rock strength properties affecting the rock failure criteria. Various research have developed rock strength for specific lithology to estimate high-accuracy value without a core. Previous analyses did not account for the formation's numerous lithologies and interbedded layers. The main aim of the present study is to select the suitable correlation to predict the UCS for hole depth of formation without separating the lithology. Furthermore, the second aim is to detect an adequate input parameter among set wireline to determine the UCS by using data of three wells along ten formations (Tanuma, Khasib, Mishrif, Rumaila, Ahmady, Maudud, Nahr Um
... Show MoreMultiple drilling problems are being faced continuously while drilling wells in the southern Iraqi oil fields. Many of which are handled poorly and inefficiently which yields longer non-productive time due to the lack of knowledge about the source of these problems. This study aims to investigate the Basra oil fields formations from Faris to Mishrif, diagnose the potential problems, and present the optimum treatment for each problem.
Gathering of field data and previous studies on the subject, in addition to the field experience of drilling supervisors were all the information bases of this study. Southern Iraqi oil fields were studied and analyzed care
In this study, a one-dimensional model represented by Butler-Volmer-Monod (BVM) model was proposed to compute the anode overpotential and current density in a mediator-less MFC system. The system was fueled with various organic loadings of real field petroleum refinery oily sludge to optimize the favorable organic loading for biomass to operate the suggested system. The increase in each organic loading showed higher resistance to electrons transport to the anode represented by ohmic loss. On the contrary, both activation and mass transfer losses exhibited a noticeable decrement upon the increased organic loadings. However, current density was improved throughout all increased loads achieving a maximum current density of 5.2 A/m3
... Show MoreIraq suffers from lack of water resources supply because the headwaters of the rivers located outside its borders and the influence of upstream countries on the quantities of flowing water, in addition to the increase of pressure on available water as a result of population increase and not adopting the principle of rationalization where misuse and wastage and lack of strategic vision to treat and manage water use in accordance with the economic implications fall. This is reflected fallout on water security and subsequently on national and food security, while the issue of using water resources is development top priority in different countries in the world because of the importance of water effect on the security of indivi
... Show MoreWere studied some bacteria evidence of pollution as well as the total number of live bacteria in the waters of the Diyala river and selected five stations within the 17 km final Diyala River before its mouth in the Tigris River was the first before the new bridge of the Diyala River about 4 km and the second after the mouth of the water purification plant Rustumiya suit inverselywith temperatures
The research aims to determine the role of green human resource management dimensions of (employment Green, training and development, green, performance evaluation Green, compensation and green bonuses) in the performance leadership of the organization dimensions of (advance planning, efficiency, effectiveness, index pioneering, renovation and modernization), Search of paramount importance because it addresses an important and modern issue in performance leadership, namely green management of human resources, aware of the importance of the subject and expected results of the company under study, an analysis of the data obtained through field visits in
... Show MoreIntegrated project delivery is collaboratively applying the skills and knowledge of all participants to optimize the project's results, increase owner value, decrease waste, and maximize efficiency during the design, fabrication, and construction processes. This study aims to determine IPD criteria positively impacting value engineering. To do this, the study has considered 9 main criteria according to PMP classification that already covers all project phases and 183 sub-criteria obtained from theoretical study and expert interviews (fieldwork). In this study, the SPSS (V26) program was used to analyze the main criteria and sub-criteria priorities from top to bottom according to their values of the Relative Importance In
... Show More