Criteria to be met in selecting the obtimal areas for generating alternative electric energy from wind
The phenomenon of informal building Spread recently in Iraqi residential areas, in general, and in Baghdad, in particular, due to the urgent housing need, on the one hand, and lack of commitment to building controls, on the other hand, to highlight the phenomenon of uncommitted building to controls and housing governing legislation in Iraq, leading to heterogeneity in both building densities and plot areas, and disorder in the urban fabric and urban escape of those areas. Research problem identified as the absence of a clear vision about the General aspects of the phenomenon of informal building in residential street scene, and the role of designed housing projects as a substitute for informal building in built residential areas. The des
... Show MoreOil recovery from carbonate reservoirs is one of the critical challenges in the oil industry due to the strongly oil-wet nature, natural fractures, and the heterogeneity of carbonate rocks. Subsequently, waterflooding can only displace oil from large fractures, leaving the majority of oil trapped in the rock matrix. This work suggests that nanofluid flooding, as a predesigned flooding method, is an alternative to conventional waterflooding. Various concentrations of silica nanofluid at different nanoparticle concentrations were formulated and systematically investigated for their characteristics, stability at reservoir conditions, and their influence on wettability and oil recovery. Silica nanoparticles were sustainably synthesized
... Show MoreABSTRUCT
This research aims at examining the expected gap between the fact of planning and controlling process of production at the State Company for Electric Industries and implementation of material requirements planning system in fuzzy environment. Developing solutions to bridge the gap is required to provide specific mechanisms subject to the logic of fuzzy rules that will keep pace with demand for increased accuracy and reduced waiting times depending on demand forecast, investment in inventory to reduce costs to a minimum.
The proposed solutions for overcoming the research problem has required some questions reflecting the problem with its multiple dimensions, which ar
... Show MoreIn this work, an efficient energy management (EEM) approach is proposed to merge IoT technology to enhance electric smart meters by working together to satisfy the best result of the electricity customer's consumption. This proposed system is called an integrated Internet of things for electrical smart meter (2IOT-ESM) architecture. The electric smart meter (ESM) is the first and most important technique used to measure the active power, current, and energy consumption for the house’s loads. At the same time, the effectiveness of this work includes equipping ESM with an additional storage capacity that ensures that the measurements are not lost in the event of a failure or sudden outage in WiFi network. Then then these measurement
... Show MoreIn this work, an efficient energy management (EEM) approach is proposed to merge IoT technology to enhance electric smart meters by working together to satisfy the best result of the electricity customer's consumption. This proposed system is called an integrated Internet of things for electrical smart meter (2IOT-ESM) architecture. The electric smart meter (ESM) is the first and most important technique used to measure the active power, current, and energy consumption for the house’s loads. At the same time, the effectiveness of this work includes equipping ESM with an additional storage capacity that ensures that the measurements are not lost in the event of a failure or sudden outage in WiFi network. Then then these
... Show MoreEffective decision-making process is the basis for successfully solving any engineering problem. Many decisions taken in the construction projects differ in their nature due to the complex nature of the construction projects. One of the most crucial decisions that might result in numerous issues over the course of a construction project is the selection of the contractor. This study aims to use the ordinal priority approach (OPA) for the contractor selection process in the construction industry. The proposed model involves two computer programs; the first of these will be used to evaluate the decision-makers/experts in the construction projects, while the second will be used to formul