Preferred Language
Articles
/
bsj-873
Design and construction of Video extractor
...Show More Authors

Design and construction of video extractor circuit require an understanding of several parameters, which include: Selector circuit, extracting circuit which contains sampling signal and multiplexing. At each radar pulse, the video signal is fed to one of the selector. The fast filter has a pass –band from 190 Hz to 1800 Hz. These frequencies correspond to targets having radial velocities laying between and 10 Kph and 200 Kph.Slow filter: 60 Hz to 230 Hz for radial velocities laying between 3.5 and 13 Kph.The video- extractor is organized in four PCB CG (A-B-C-D) each one having 16 selector. The sampling signal (ADS) (1-2-3-4) control the 4-line-to-16-line decoders. 8 multiplexers of 8 inputs each, are required for the multiplexing of the 64 selectors.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sun Nov 12 2023
Journal Name
Migration Letters
Piezoelectric Energy Harvesting from Vortex-Induced Vibrations: Design and Correlations
...Show More Authors

This study delves into the design optimization of a hydropower harvesting system, exploring various parameters and their influence on system performance. By modifying the variables within the model to suit different flow conditions, a judiciously optimized design is attainable. Notably, the lift force generated is found to be intricately linked to the strategic interplay of the bluff body's location, cylinder dimensions, and flow velocity. The findings culminate in the establishment of empirical equations, one for lift force and another for displacement, based on the force equation. Many energy harvesting approaches hinge on the reciprocating motion inherent to the structural system. The methodology developed in this study emerges as a pot

... Show More
View Publication Preview PDF
Publication Date
Mon Dec 11 2017
Journal Name
Al-khwarizmi Engineering Journal
Design and Implementation for 3-DoF SCARA Robot based PLC
...Show More Authors

Abstract 

This paper presents mechanical and electrical design, and implementation  process of industrial robot, 3-DoF type SCARA (selective compliment assembly robot arm),with two rotations and one translation used for welding applications.The design process also included the controller design which was based on PLC(programmable logic controller) as well as selection of mechanical and electrical components.The challenge was to use the available components in Iraq with reasonable costs. The robot mentioned is fully automated using programmable logic controller PLC(Zelio type SR3-B261BD),with 16inputs and 10 outputs. The PLC was implemented in FBD logic to obtain three different automatic motions with hi

... Show More
View Publication Preview PDF
Crossref (5)
Crossref
Publication Date
Sat May 05 2012
Journal Name
Journal Of Planner And Development
planning and design of a tourist village in the marshes of southern Iraq
...Show More Authors

This study analyzes how to make use of the resources in the marshlands of Iraq and how to utilize them, especially after the water returns to these areas and they are revitalized. We take an example of AL- Saheen Marsh and plan an ideal tourist resort there. This example can further expand to include other parts of the marshlands. The resort will utilize the local environment and tourist characteristics as it will have a feel and architectural resemblance to the houses and buildings that are currently built there. In addition the transportation methods will be the same as those used by the locals. Yet the resort will still posses all the facilities required by a modern tourist resort that includes all the services that will make

... Show More
View Publication
Publication Date
Fri Feb 01 2019
Journal Name
Indian Journal Of Natural Sciences
Design and Test of Electrochemistry of Electrodes Catalysis for an Alkaline Fuel Cell
...Show More Authors

Preview PDF
Publication Date
Wed Dec 13 2017
Journal Name
Al-khwarizmi Engineering Journal
Design and Simulation of L1-Adaptive Controller for Position Control of DC Servomotor
...Show More Authors

This paper presents L1-adaptive controller for controlling uncertain parameters and time-varying unknown parameters to control the position of a DC servomotor. For the purpose of comparison, the effectiveness of L1-adaptive controller for position control of studied servomotor has been examined and compared with another adaptive controller; Model Reference Adaptive Controller (MRAC). Robustness of both L1-adaptive controller and model reference adaptive controller to different input reference signals and different structures of uncertainty were studied. Three different types of input signals are taken into account; ramp, step and sinusoidal. The L1-adaptive controller ensured uniformly bounded

... Show More
View Publication Preview PDF
Publication Date
Wed Jan 01 2020
Journal Name
Construction Research Congress
Exploratory Study of Potential Negative Safety Outcomes Associated with UAV-Assisted Construction Management
...Show More Authors

Scopus (13)
Scopus
Publication Date
Thu Oct 01 2020
Journal Name
Journal Of Taibah University Medical Sciences
Preparing polycaprolactone scaffolds using electrospinning technique for construction of artificial periodontal ligament tissue
...Show More Authors

Objectives The strategies of tissue-engineering led to the development of living cell-based therapies to repair lost or damaged tissues, including periodontal ligament and to construct biohybrid implant. This work aimed to isolate human periodontal ligament stem cells (hPDLSCs) and implant them on fabricated polycaprolactone (PCL) for the regeneration of natural periodontal ligament (PDL) tissues. Methods hPDLSCs were harvested from extracted human premolars, cultured, and expanded to obtain PDL cells. A PDL-specific marker (periostin) was detected using an immunofluorescent assay. Electrospinning was applied to fabricate PCL at three concentrations (13%, 16%, and 20% weight/volume) in two forms, which were examined through field emission

... Show More
View Publication
Scopus (26)
Crossref (8)
Scopus Clarivate Crossref
Publication Date
Wed Dec 01 2021
Journal Name
Civil And Environmental Engineering
Prediction of the Delay in the Portfolio Construction Using Naïve Bayesian Classification Algorithms
...Show More Authors
Abstract<p>Projects suspensions are between the most insistent tasks confronted by the construction field accredited to the sector’s difficulty and its essential delay risk foundations’ interdependence. Machine learning provides a perfect group of techniques, which can attack those complex systems. The study aimed to recognize and progress a wellorganized predictive data tool to examine and learn from delay sources depend on preceding data of construction projects by using decision trees and naïve Bayesian classification algorithms. An intensive review of available data has been conducted to explore the real reasons and causes of construction project delays. The results show that the postpo</p> ... Show More
Scopus (11)
Crossref (12)
Scopus Clarivate Crossref
Publication Date
Fri Jan 01 2021
Journal Name
E3s Web Of Conferences
Investigation the Opportunity of BIM with Agile Management Approach in Iraqi Construction Projects
...Show More Authors

The construction industry in Iraq suffers from many problems, perhaps the most important of which is the delay in time and the increase in costs. Therefore, it was necessary to try to adopt a new methodology that would help in overcoming these problems. It was suggested to combine building information modeling with the agile management approach because this technique and methodology is modern and helps in reducing time and cost and improving quality. This paper aims to know the status of using Building Information Modeling (BIM) and Agile Project management (APM) in Iraq and to shed light on the merging of this integration, explaining the benefits, difficulties, and workflow practices, finding the most influencing factors on the tim

... Show More
View Publication
Crossref (7)
Crossref
Publication Date
Tue Mar 01 2016
Journal Name
Al-academy
Employing the elements of film construction in embodying the style cinematically: عامر الحديثي
...Show More Authors

The researcher concluded that it consists of several types of structures, where the intellectual structure related to the choice of the idea, its treatment, its effect, the choice of the topic, the way ideas are addressed and presented in the film, and then the dramatic structure of the film's characters, the formulation of its events, its dramatic composition, its temporal arrangement, the identification of the parties to the conflict and their management, then these are formulated. Visions and ideas through the visual and audio signal systems, which work to highlight the stylistic features in the character of the film director.

View Publication Preview PDF
Crossref