This paper is concerned with pre-test single and double stage shrunken estimators for the mean (?) of normal distribution when a prior estimate (?0) of the actule value (?) is available, using specifying shrinkage weight factors ?(?) as well as pre-test region (R). Expressions for the Bias [B(?)], mean squared error [MSE(?)], Efficiency [EFF(?)] and Expected sample size [E(n/?)] of proposed estimators are derived. Numerical results and conclusions are drawn about selection different constants included in these expressions. Comparisons between suggested estimators, with respect to classical estimators in the sense of Bias and Relative Efficiency, are given. Furthermore, comparisons with the earlier existing works are drawn.
ناقش البحث في طياته عدداً من القضايا الرئيسة المتعلقة بالتقييم الاستراتيجي والإطار العام للخطة الاستراتيجية المقترحة لشركة نفط ميسان للسنوات الخمس المقبلة (2020_2024)، وهدف هذا البحث يتمحور في تقييم عملية صياغة استراتيجية شركة نفط ميسان لتحديد نقاط القوة وتعضيدها ومواطن الضعف ومحاولة معالجتها لتجنب الوقوع بها عند وضع استراتيجية للسنوات القادمة، وعلى هذا الاساس فان مشكلة البحث تكمن في مدى نجاح الاستراتي
... Show MoreThe research aims to analyze and evaluate the urban land use according to the needs of the current and future population by adopting the planning criteria for the holy city of Karbala. In the theoretical side, we discussed the most important concepts of urban land use planning. In the practical aspect of the study, field surveys were conducted to obtain the required information. Using the GIS program, the land uses were planned and executed, Analysis By comparing the per capita use of urban land with criteria and the production of maps.
The main findings of the study are that there is a large deficit in meeting some of the needs of the urban land uses and the basic services of the city. The research recommended that the needs of
... Show MoreIn this paper an estimator of reliability function for the pareto dist. Of the first kind has been derived and then a simulation approach by Monte-Calro method was made to compare the Bayers estimator of reliability function and the maximum likelihood estimator for this function. It has been found that the Bayes. estimator was better than maximum likelihood estimator for all sample sizes using Integral mean square error(IMSE).
Priority of road maintenance can be viewed as a process influenced by decision-makers with varying decision-making power. Each decision-maker may have their view and judgment depending on their function and responsibilities. Therefore, determining the priority of road maintenance can be thought of as a process of MCDM. Regarding the priority of road maintenance, this is a difficult MCDM problem involving uncertainty, qualitative criteria, and possible causal relationships between choice criteria. This paper aims to examine the applicability of multiple MCDM techniques, which are used for assessing the priority of road maintenance, by adapting them to this sector. Priority of road maintenance problems subject to internal
... Show MoreAbstract
A surface fitting model is developed based on calorimeter data for two famous brands of household compressors. Correlation equations of ten coefficient polynomials were found as a function of refrigerant saturating and evaporating temperatures in range of (-35℃ to -10℃) using Matlab software for cooling capacity, power consumption, and refrigerant mass flow rate.
Additional correlations equations for these variables as a quick choice selection for a proper compressor use at ASHRAE standard that cover a range of swept volume range (2.24-11.15) cm3.
The result indicated that these surface fitting models are accurate with in ± 15% for 72 compressors model of cooling cap
... Show MoreEngineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public a
... Show MoreThe reaction of 2, 4, 6-trihydroxyactophenonemonohydrate with hydrazine monohydrate was realized under reflux in methanol and a few drops of glacial acetic acid were added to give the (intermediate) 2-(1-hydrazono-ethyl)-benzene-1, 3, 5-triol, which reacted with salicylaldehyde in methanol to give a new type (NO) ligand [HL][(2-1-[(2-hydroxy-benzyliidene)-hydrazono]-ethyl) benzene-1, 3, 5-triol. The ligand was reacted with Mcl.(where M-Co, Ni, Cu, and Zn) under reflux in methanol with (l: 1) ratio to give complexes of the general formula [M (HL)]. All compounds have been characterized by spectroscopic methods I" H NMR, IR. UV-Vis, HPLC, atomic absorption] microanalysis along with conductivity measurement. From the above data the proposed mo
... Show MoreObjective(s): The present study aims at studying the relationship between immunoglobulin IgG, IgA,
IgM , as well as to C-3 and C-4 in brain tumours patients immunity (meningioms and gliomas).
Methodology: Forty sera of brain tumour patients were included 20 glioma and 20 meningioma was
tested to determine the levels of IgM, IgG IgA, C-3 and C-4 by using single radial immune-diffusion
technique and compared with 20 apparently healthy blood donors.
Results: The study revealed a significant decreasing in IgG levels in glioma as compare to meningioma
and control. The concentration of two other serum immunoglobulins and complement in both
meningioma and glioma show no significant differences with those in control group.
KE Sharquie, AA Noaimi, BO Saleh, ZN Anbar…, Saudi Med J, 2009 - Cited by 13