Preferred Language
Articles
/
b0IHNJsBMeyNPGM3I9jJ
Improving the Hydraulic Performance of Bani-Hassan Canal by Using Submerged Weir
...Show More Authors
Abstract<p> A submerged weir is a hydraulic structure utilized to control flow in canals and rivers. Water scarcity is a persistent issue in Iraq, especially during the dry season when irrigation withdrawals reduce downstream water levels in canals (Water is lost from irrigation canals due to seepage, evaporation, and vegetation growth). The final section of the Bani Hassan Canal experiences significant drops in water surface (WS) levels, negatively impacting irrigation efficiency. This study addresses that gap by investigating the use of submerged weirs to enhance water distribution and raise WS in the final 6 km segment of the canal. A one-dimensional (1D) hydraulic model was developed using HEC-RAS 6.6 under steady-state conditions to simulate flow behavior. Simulations were performed for two scenarios: a dry season discharge of 20 m <sup>3</sup> /s and a design discharge of 39 m <sup>3</sup> /s. The comparison of simulated water surface profiles under these two scenarios allowed the validation of the model and assessment of hydraulic performance. Submerged weirs of varying heights (0.5 m to 2.0 m) were introduced at station 63.5 to evaluate their effect on raising the water surface level. Results showed that a 2.0 m submerged weir increased the water level at station 62 by 0.82 m during low-flow conditions-effectively restoring it to the design level. These findings confirm that submerged weirs are an effective and practical solution for improving water distribution and sustaining irrigation during periods of water scarcity. </p>
Scopus Crossref
View Publication
Publication Date
Thu Dec 31 2020
Journal Name
Pollution Research Journal
ANALYSIS OF THE HYDRAULIC CHARACTERISTICS OF AL MAHAWIL STREAM USING HECRAS: A FIELD STUDY
...Show More Authors

A water resources management for earthen canal/stream is introduced through creating a combination procedure between a field study and the scientific analytical concepts that distinguish the hydraulic problems on this type of stream with using the facilities that are available in HECRAS software; aiming to point the solutions of these problems. Al Mahawil stream is an earthen canal which is subjected to periodic changes in cross sections due to scour, deposition, and incorrect periodic dredging processes due to growth of the Ceratophyllum plants and weeds on the bed and banks of the stream; which affect the characteristics of the flow. This research aims to present a strategy of water resources management through a field study that conducte

... Show More
View Publication Preview PDF
Publication Date
Wed Mar 20 2019
Journal Name
Al-khwarizmi Engineering Journal
Enhancement of Heat Exchanger Performance by Using Dimpled Tube
...Show More Authors

The enhancement of heat exchanger performance was investigated using dimpled tubes tested at different Reynolds numbers, in the present work four types of dimpled tubes with a specified configuration manufactured, tested and then compared performance with the smooth tube and other passive techniques performance. Two dimpled arrangements along the tube were investigated, these are inline and staggered at constant pitch ratio X/d=4, the test results showed that Nusselts number (heat transfer) of the staggered array is higher than the inline array by 13%.  The effect of different depths of the dimple (14.5 mm and 18.5 mm) has been also investigated; a tube with large dimple diameter enhanced the Nusselts number by about 25% for the ran

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Thu Feb 28 2019
Journal Name
Journal Of Engineering
Hydraulic Analysis and Performance Evaluation of Combined Trunk Sewers: A Case Study of Baghdad City.
...Show More Authors

Sewer system plays an indispensable task in urban cities by protecting public health and the environment. The operation, maintenance, and rehabilitation of this network have to be in a sustainable and scientific manner. For this purpose, it is important to support operators, decision makers and municipalities with performance evaluation procedure that is based on operational factors. In this paper, serviceability and performance indicator (PI) principles are employed to propose methodology comprising two enhanced PI curves that can be used to evaluate the individual sewers depending on operational factors such as flowing velocity and wastewater level in the sewers. In order to test this methodology; a case study of al-Ru

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Oct 01 2019
Journal Name
Journal Of Engineering
Hydraulic Analysis and Performance Evaluation of Combined Trunk Sewers: a Case Study of Baghdad City.
...Show More Authors

Sewer system plays an essential task in urban cities by protecting public health and the environment. The operation, maintenance, and rehabilitation of this network have to be sustainable and scientifically. For this purpose, it is crucial to support operators, decision makers and municipalities with performance evaluation procedure that is based on operational factors. In this paper, serviceability and performance indicator (PI) principles are employed to propose methodology comprising two enhanced PI curves that can be used to evaluate the individual sewers depending on operational factors such as flowing velocity and wastewater level in the sewers. To test this methodology; a case study of al-Rusafa in Baghdad city is

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Jun 01 2021
Journal Name
Journal Of Optical Communications
Improving the optical link for UVLC using MIMO technique
...Show More Authors
Abstract<p>This paper proposed a theoretical treatment to study underwater wireless optical communications (UWOC) system with different modulation schemes by multiple input-multiple output (MIMO) technology in coastal water. MIMO technology provides high-speed data rates with longer distance link. This technique employed to assess the system by BER, Q. factor and data rate under coastal water types. The reliability of the system is examined by the techniques of 1Tx/1Rx, 2Tx/2Rx, 3Tx/3Rx and 4Tx/4Rx. The results shows the proposed technique by MIMO can get the better performance compared with the other techniques in terms of BER. Theoretical results were obtained to compare between PIN and APD </p> ... Show More
View Publication
Scopus (20)
Crossref (21)
Scopus Crossref
Publication Date
Mon Feb 02 2015
Journal Name
Al-khwarizmi Engineering Journal
Stabilizing Gap of Pole Electric Arc Furnace Using Smart Hydraulic System
...Show More Authors

Preview PDF
Publication Date
Sat Feb 28 2015
Journal Name
Al-khwarizmi Engineering Journal
Stabilizing Gap of Pole Electric Arc Furnace Using Smart Hydraulic System
...Show More Authors

Abstract

Electric arc furnace applications in industry are related to position system of its pole, up and down of pole. The pole should be set the certain gap. These setting are needed to calibrate. It is done manually. In this research will proposed smart hydraulic to make this pole works as intelligent using proportional directional control valve. The output of this research will develop and improve the working of the electric arc furnace. This research requires study and design of the system to achieve the purpose and representation using Automation Studio software (AS), in addition to mathematically analyzed and where they were building a laboratory device similar to the design and conduct experiments to stud

... Show More
View Publication Preview PDF
Publication Date
Sat May 30 2026
Journal Name
Journal Of Baghdad College Of Dentistry
Evaluation of the push-out bond strength of root canal obturation materials filled by four different obturation techniques
...Show More Authors

Background: The aim of this study was to comparatively evaluate the push out bond strength (PBS) of root canal fillings using four different obturation techniques (single cone (SC), cold lateral compaction (CLC), continuous wave (CW), and carrier based gutta percha (CBG)). Materials and Methods: Forty mandibular premolar decoronated and instrumented with rotary ProTaper to F3 then teeth were divided randomly into 4 groups of 10 teeth for each as follow: group (I) single- cone obturation with matched-taper gutta-percha, group (II) cold lateral compaction technique, group (III) continuous wave of obturation technique, and group( IV) carrier based gutta-percha technique. Zinc oxide eugenol (ZOE) sealer was used as a root canal sealer for the

... Show More
View Publication Preview PDF
Publication Date
Mon Aug 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
The Development of the Suez Canal and Projects Competitors
...Show More Authors

The area around the Suez Canal has been chosen particularly  Sinai  to implement the new Suez Canal project parallel to the original 72-km-long channel due to the importance of the commercial site of the Arab Republic of Egypt, competing with shipping lanes, to accommodate the increasing maritime traffic  passing through the Suez canal, and to provide special services for trade world and reduce the economic cost of marine trip. The establishment of six tunnels for automobile and railway transport to Sinai The cost of the establishment of this new channel  and the establishment of the tunnels about (2.8) billion, of which 4 billion cost of the new channel. Project implementation period is one year. The new proj

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat May 01 2021
Journal Name
Journal Of Engineering
Impact of the Weir Slit Location, the Flow Intensity and the Bed Sand on the Scouring Area and Depth at the Dam Upstream
...Show More Authors

A total of 48 experiments were conducted to investigate the impact of slit weir dimensions and locations on the maximum scour depth and scour area created upstream. The slit weir model was a 110 mm slit opening, and it was installed at the end of the working section in a laboratory flume. The flume was 10.0 m long, 30 cm wide, 30 cm deep, and almost middle. It includes a 2 m working section with a mobile bed with 110 mm in thickness. In the mobile bed, two types of nonuniform sand (with a geometric standard deviation of 1.58 and 1.6) were tested separately. The weir dimensions and location were changed with flow rates. Then dimensions of the slit weir were changed from 60 x 110 mm to 60 x 70 mm (width x height), while th

... Show More
View Publication Preview PDF
Crossref (1)
Crossref