The objective of this work is to study the influence of end milling cutting process parameters, tool material and geometry on multi-response outputs for 4032 Al-alloy. This can be done by proposing an approach that combines Taguchi method with grey relational analysis. Three cutting parameters have been selected (spindle speed, feed rate and cut depth) with three levels for each parameter. Three tools with different materials and geometry have been also used to design the experimental tests and runs based on matrix L9. The end milling process with several output characteristics is solved using a grey relational analysis. The results of analysis of variance (ANOVA) showed that the major influencing parameters on multi-objective response were spindle speed and cutting tool with contribution percentage (52.75%, 24%), respectively. In addition, the optimum combination of end milling process parameters was then validated by performing confirmation tests to determine the improvement in multi-response outputs. The confirmation tests obtained a minimum (surface roughness and micro-hardness) and maximum metal removal rate with grey relational grade of 0.784 and improvement percentage of 2.3%.
In this paper, we will illustrate a gamma regression model assuming that the dependent variable (Y) is a gamma distribution and that it's mean ( ) is related through a linear predictor with link function which is identity link function g(μ) = μ. It also contains the shape parameter which is not constant and depends on the linear predictor and with link function which is the log link and we will estimate the parameters of gamma regression by using two estimation methods which are The Maximum Likelihood and the Bayesian and a comparison between these methods by using the standard comparison of average squares of error (MSE), where the two methods were applied to real da
... Show MoreTraditional tree management is laborious and costly, thus this work aimed to study the performance of two different types of frond cutting saws (reciprocating saw and vibrating saw) and examine the two saws on five date palm varieties. Four parameters were examined, including cutting time for a single frond, the power needed for cutting a single frond, frond cutting productivity expressed as tree/h, and vibration conveyed to the worker’s hand. A field experiment was designed according to the nested randomized complete block design, including five date palm varieties as the main plot and the type of saw as a sub-plot. Means were compared using the least significant differences (LSD 0
The process of evaluating business processes, complex, repetition of procurement processes, need for raw materials and frequency of demand, which makes dealing with suppliers in the evaluation process, making the need for a process intervention in the process. Lighter on the other hand.
Many Iraqi companies suffer from problems related to suppliers, and cases of administrative and financial corruption are often raised regarding this type of contract and from this reality the necessity of researching this problem and trying to develop some solutions to reduce its impact on the companies' work, by using a method that works according to the standards adopted in Evaluation and selection of the supplier in the
... Show MoreIn this research two algorithms are applied, the first is Fuzzy C Means (FCM) algorithm and the second is hard K means (HKM) algorithm to know which of them is better than the others these two algorithms are applied on a set of data collected from the Ministry of Planning on the water turbidity of five areas in Baghdad to know which of these areas are less turbid in clear water to see which months during the year are less turbid in clear water in the specified area.
Construction contractors usually undertake multiple construction projects simultaneously. Such a situation involves sharing different types of resources, including monetary, equipment, and manpower, which may become a major challenge in many cases. In this study, the financial aspects of working on multiple projects at a time are addressed and investigated. The study considers dealing with financial shortages by proposing a multi-project scheduling optimization model for profit maximization, while minimizing the total project duration. Optimization genetic algorithm and finance-based scheduling are used to produce feasible schedules that balance the finance of activities at any time w
The thermal and electrical performance of different designs of air based hybrid photovoltaic/thermal collectors is investigated experimentally and theoretically. The circulating air is used to cool PV panels and to collect the absorbed energy to improve their performance. Four different collectors have been designed, manufactured and instrumented namely; double PV panels without cooling (model I), single duct double pass collector (model II), double duct single pass (model III), and single duct single pass (model IV) . Each collector consists of: channel duct, glass cover, axial fan to circulate air and two PV panel in parallel connection. The temperature of the upper and
... Show MoreThe thermal and electrical performance of different designs of air based hybrid photovoltaic/thermal collectors is investigated experimentally and theoretically. The circulating air is used to cool PV panels and to collect the absorbed energy to improve their performance. Four different collectors have been designed, manufactured and instrumented namely; double PV panels without cooling (model I), single duct double pass collector (model II), double duct single pass (model III), and single duct single pass (model IV) . Each collector consists of: channel duct, glass cover, axial fan to circulate air and two PV panel in parallel connection. The temperature of the upper and lower surfaces of PV panels, air temper
... Show More