In this research work, a simulator with time-domain visualizers and configurable parameters using a continuous time simulation approach with Matlab R2019a is presented for modeling and investigating the performance of optical fiber and free-space quantum channels as a part of a generic quantum key distribution system simulator. The modeled optical fiber quantum channel is characterized with a maximum allowable distance of 150 km with 0.2 dB/km at =1550nm. While, at =900nm and =830nm the attenuation values are 2 dB/km and 3 dB/km respectively. The modeled free space quantum channel is characterized at 0.1 dB/km at =860 nm with maximum allowable distance of 150 km also. The simulator was investigated in terms of the execution of the BB84 protocol based on polarizing encoding with consideration of the optical fiber and free-space quantum channel imperfections and losses by estimating the quantum bit error rate and final secure key. This work shows a general repeatable modeling process for significant performance evaluation. The most remarkable result that emerged from the simulated data generated and detected is that the modeling process provides guidance for optical quantum channels design and characterization for other quantum key distribution protocols.
This research aims to determine the role of employee performance evaluation of the achievement of the quality of human resources in the Office of the Inspector General / Martyrs Foundation requirements by employing comparison steps reference with the Office of the Inspector General / Ministry of Higher Education and Scientific Research, has been touching the researchers need the Office of the Inspector General / Martyrs Foundation to apply assess the performance is good for workers and the employment of its outputs to achieve the requirements of the above-mentioned system, and in order to stand on this role we raised the following question President: (is the quality of human resources requirements are achieved through the employm
... Show MoreThe aim of this study is to achieve the best distinguishing function of the variables which have common characteristics to distinguish between the groups in order to identify the situation of the governorates that suffer from the problem of deprivation. This allows the parties concerned and the regulatory authorities to intervene to take corrective measures. The main indicators of the deprivation index included (education, health, infrastructure, housing, protection) were based on 2010 data available in the Central Bureau of Statistics
The experiment was conducted to evaluate and performance comparison for moldboard and disk plows in central of Iraq in 2011. Three factor were used in this study included Two types of plows included moldboard and disk plows which represented main plot , three forward speeds of the tillage was second factor included 1.85, 3.75 and 5.62 km / h which represented sup plot , and three levels of soil moisture was third factor included 21 , 18 and 14 % to determined data actual plow depth , Practical productivity, Volume of disturbed soil, Field efficiency , Slippage percentage in silt clay loam soil with depth 22 cm were studied in the experiment Split – split plot design under randomized complete block design with three replications using
... Show MoreA new mathematical model describing the motion of manned maneuvering targets is presented. This model is simple to be implemented and closely represents the motion of maneuvering targets. The target maneuver or acceleration is correlated in time. Optimal Kalman filter is used as a tracking filter which results in effective tracker that prevents the loss of track or filter divergency that often occurs with conventional tracking filter when the target performs a moderate or heavy maneuver. Computer simulation studies show that the proposed tracker provides sufficient accuracy.
The performa of evaluation process is a process that should be carried out by all industrial management in order to stand on aspects of development or underdevelopment of the various departments and activities in its industrial project for the purpose of identifying obstacles and find out the causes and then avoid them quickly. And intended to rectify the performance evaluation of the activities of industrial project or economic union by measuring the results achieved within a specific operational process and compare it to what is already targeted, and often the time for comparison of one year.
The process of performance evaluation depends upon several criteria and indicators within the
... Show MoreThis study dealt with the management strategy as an independent variable and the integrated industrial distribution as a variable. The study aimed at finding the integrated industrial distribution that fits with the management strategy in providing the needs of the firm on the one hand and reducing the cost of management that is reflected in increasing its profits.
The researcher selected the data from (130) decision makers in the corporation and used the questionnaire as a tool for collecting data and used a set of statistical tools and tools suitable for the nature of information and were processed using the data analysis system (SPSS version 24) Based on the analysis of the responses of the sample and the test of correlation and