Linear motor offers several features in many applications that require linear motion. Nevertheless, the presence of cogging force can deteriorate the thrust of a permanent magnet linear motor. Using several methodologies, a design of synchronous single sided linear iron-core motor was proposed. According to exact formulas with surface-mounted magnets and concentrated winding specification, which are relying on geometrical parameters. Two-dimensional performance analysis of the designed model and its multi-objective optimization were accomplished as a method to reduce the motor cogging force using MAXWELL ANSYS. The optimum model design results showed that the maximum force ripple was approximatrly reduced by 81.24%compared to the original model with a smaller ripple coefficient of 0.22. Likewise, the model was redesigned taking into consideration two cases; laminated core and solid core. It was found that the error between the analytical and numerical results of the output force did not exceed 0.0967%.
The current study aimed at identifying the impact of each of the full and part time summer enrichment programs on the performance of gifted students. Moreover, it aimed to study the difference between the full and part time programs on the performance of gifted students. The study sample consisted of (115) students from the full time programs and (137) students from the part time programs, they have been randomly selected from the gifted students participating in the full and part time summer enrichment programs. The researcher used the scale of student performance. The results indicated that there were statistically significant differences between the averages of the pre and post applications of the
... Show MoreBrainstorming has been a common approach in many industries where the result is not always accurate, especially when procuring automobile spare parts. This approach was replaced with a scientific and optimized method that is highly reliable, hence the decision to optimize the inventory inflation budget based on spare parts and miscellaneous costs of the typical automobile industry. Some factors required to achieve this goal were investigated. Through this investigation, spare parts (consumables and non-consumables) were found to be mostly used in Innoson Vehicle Manufacturing (IVM), Nigeria but incorporated miscellaneous costs to augment the cost of spare parts. The inflation rate was considered first due to the market's
... Show MoreThis paper deals with the subjective reflections of consumer values on fashion design. The consumer self is determined by the consumer's idea of himself, according to the intellectual, spiritual and social values, and these values take their intellectual reflection in the form of material values that the consumer finds in fashion design. These values are based on considerations between what is intellectual represented by the values of the consumer, and what is material determined by the fashion design, which also proceed from values that are visible or implied in costume design, such as the function, beauty and symbol. The consumer self gets its material image represented in the
... Show MoreThis study analyzes how to make use of the resources in the marshlands of Iraq and how to utilize them, especially after the water returns to these areas and they are revitalized. We take an example of AL- Saheen Marsh and plan an ideal tourist resort there. This example can further expand to include other parts of the marshlands. The resort will utilize the local environment and tourist characteristics as it will have a feel and architectural resemblance to the houses and buildings that are currently built there. In addition the transportation methods will be the same as those used by the locals. Yet the resort will still posses all the facilities required by a modern tourist resort that includes all the services that will make
... Show MoreThis study deals with the field of acieving the manuscripts of Islamic sciences by the great Imam ibn Kamal Pasha, but the mentioned book requires a great effort to explain what it contains of sciences, and to appear what it has contained
In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc