Effect of Construction Joints on Performance of Reinforced Concrete Beams
...Show More Authors

Construction joints are stopping places in the process of placing concrete, and they are required because in many structures it is impractical to place concrete in one continuous operation. The amount of concrete that can be placed at one time is governed by the batching and mixing capacity and by the strength of the formwork. A good construction joint should provide adequate flexural and shear continuity through the interface.

In this study, the effect of location of construction joints on the performance of reinforced concrete structural elements is experimentally investigated.

Nineteen beam specimens with dimensions of 200×200×950 mm were tested. The variables investigated are the location of the construction joints (at midspan or at third point of the specimens), type of construction joints (vertical, inclined, and key construction joints), and presence of stirrups at these joints. The specimens were tested using 1000 kN computer controlled versatile electronic testing machine. The specimens were positioned in the machine so that the deflection at center and\or at the location of construction joint was measured at each load step.

The results of the experimental program indicated that the best location of the construction joint is at the point of minimum shear. It was found that the use of vertical construction joint has little effect on the overall behavior of beam specimens (the percentage of reduction in ultimate load capacity is in the range of 0% - 5%).

While inclined construction joints results in a noticeable reduction in strength of beams relative to the strength of beam without construction joint the percentage of reduction in ultimate load capacity is in range of 8% - 20%.The presence of stirrups at the construction joints is an important variable, which affect the type of failure and load carrying capacity. It is found that adding of stirrups across the joint results in an increase in capacity in the range of (7%- 15%) and a decrease in deflection in the range of (20%- 48%).

View Publication Preview PDF
Quick Preview PDF
Publication Date
Sat Apr 01 2023
Journal Name
Journal Of Engineering
Manufacture of Load Bearing Concrete Masonry Units Using Waste Demolishing Material
...Show More Authors

The presence of construction wastes such as clay bricks, glass, wood, plastic, and others in large quantities causes serious environmental problems in the world. Where these wastes can be used to preserve the natural resources used in construction and reduce the impact of this problem on the environment, it also works to reduce the problem of high loads of concrete blocks. Clay bricks aggregate (AB) can be recycled as coarse aggregate and replaced with volumetric proportions of coarse aggregate by ( 5% and 10%), as well as the use of clay brick powder (PB) by replacing its weight of cement (5% and 10%) and reduced in the manufacture of concrete blocks (blocks). Four mixtures will be prepared and tested to learn how to re

... Show More
View Publication Preview PDF
Crossref (4)
Crossref
Publication Date
Sat Feb 12 2022
Journal Name
Engineering, Technology & Applied Science Research
The Possibility of Minimizing Rutting Distress in Asphalt Concrete Wearing Course
...Show More Authors

The excessive permanent deformation (rutting) in asphalt-concrete pavements resulting from frequent repetitions of heavy axle loads is studied in this paper. Rutting gradually develops with additional load applications and appears as longitudinal depressions in the wheel path. There are many causes of the rutting of asphalt roads, such as poor asphalt mixing and poor continuous aggregate gradation. All factors affecting the mixture resistance to permanent deformation must be discussed, and all must be properly considered to reduce the rutting propensity of asphalt-aggregate mixtures. In this study, several mixtures were produced with the most common techniques in rutting resistance (using the most effective additives for each mixture), and

... Show More
View Publication Preview PDF
Crossref (20)
Crossref
Publication Date
Mon Jan 01 2024
Journal Name
Journal Of Engineering
Improvement Marshall Properties of Hot Mix Asphalt Concrete Using Polyphosphoric Acid
...Show More Authors

Modified asphalt is considered one of the alternatives to address the problems of deficiencies in traditional asphalt concrete, as modified asphalt addresses many of the issues that appear on the pavement layers in asphalt concrete, resulting from heavy traffic and vehicles loaded with loads that exceed the design loads and the large fluctuations in the daily and seasonal temperatures of asphalt concrete. The current study examined the role of polyphosphoric acid (PPA) as a modified material for virgin asphalt when it was added in different proportions (1%, 2%, 3%, 4%) of the asphalt weight. The experimental program includes the volumetric characteristics associated with the Marshall test, the physical properties, and th

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Nov 01 2019
Journal Name
International Journal Of Engineering
Structural Behavior of Axially Loaded Composite Concrete-steel Plate Shear Walls
...Show More Authors

Scopus (5)
Crossref (2)
Scopus Clarivate Crossref
Publication Date
Tue Jun 30 2015
Journal Name
College Of Islamic Sciences
From the responses of Imam Abi Zakaria al-Nawawi 676 AH on the grammarians in his commentary on Sahel Muslim
...Show More Authors

From the responses of Imam Abi Zakaria al-Nawawi 676 AH on the grammarians in his commentary on Sahel Muslim

View Publication Preview PDF
Publication Date
Thu Feb 28 2019
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Evaluation of the Construction, Build, Operate and Transfer (B.O.T): Applied Research in Southern Cement State Company
...Show More Authors

   Form of investment in infrastructure important factor to drive economic growth in any country, with the dwindling ability of governments to provide the necessary funds for such investments, emerged as a rising trend for private sector involvement in public projects and infrastructure, and one of these trends is the build-operate-transfer system (BOT), which commonly used in various developed and developing countries as one of the tools used in the implementation of these investments, as the private sector under this system design, finance, build and operate the project, and are re-administration of the state after a certain period under a contractual agreement between the parties of the contract. As this system provides majo

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Dec 01 2013
Journal Name
Baghdad Science Journal
Construction of New Ion Selective Electrodes for Determination Fe(III) and Their Application in Pharmaceutical samples
...Show More Authors

Liquid membrane electrodes for the determination iron(III) were constructed based on chloramphenicol sodium succinate and iron(III) CPSS-Fe(III) as ion pair complex, with four plasticizers Di-butyl phosphate (DBP); Di-butyl phthalate (DBPH); Di-octyl phthalate (DOP); Tri-butyl phosphate (TBP); in PVC matrix . These electrodes give Nernstian and sub-Nernstian slopes (19.79, 24.60, 16.01 and 13.82mV/decade) and linear ranges from (1x10-5-1x10-2 M, 1x10-5-1x10-2 M, 1x10-6-1x10-2 M and 1x10-5-1x10-2 M) respectively. The best electrode was based on DBP plasticizer which gave a slope 19.79 mV/decade, correlation coefficient 0.9999, detection limit of 9×10-6 M, lifetime 37 day displayed good stability and reproducibility and used to determine

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Mar 01 2013
Journal Name
Journal Of Economics And Administrative Sciences
The construction of Investment Portfolios in the Iraq Stock Exchange: Market Timing Vs. an Efficient Selection
...Show More Authors

Abstract

         Uncertainty, the deeply-rooted fact that surrounding the investment environment, especially the stock market which just prices have taken a specific trend until they moved to another one for its up or down. This means that the volatility characteristic of financial market requires the rational investor an argument led towards the adoption of planned acts to gain greater benefit in the goal of wealth maximizing. There is no possibility to achieve this goal without the burden of uncertainty and the risk of systematic fluctuations of investment returns in the financial market after the facts of  efficient diversification have pro

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Jan 01 2019
Journal Name
Energy Procedia
Design and Construction of Nanostructure TiO2 Thin Film Gas Sensor Prepared by R.F Magnetron Sputtering Technique
...Show More Authors

In this research, Mn-doped TiO2 thin films were grown on glass, Si and OIT/glass substrates by R.F magnetron sputtering technique with thicknesses (250 nm) using TiO2:Mn target under Ar gas pressure and power of 100 Watt. Through the results of X-ray diffraction, the prepared thin films are of the polycrystallization type after the process of annealing at 600°C for two hour The average crystalline size were 145.32, 280.97 and 261.23 nm for (TiO2:Mn) thin film on glass, Si and OIT/glass substrates respectively, while the measured surface roughness is between 0.981nm and 1.14 nm. The fabricated (TiO2:Mn) thin film on glass sensors have high sensitivity for hydrogen( H2 reducing gas) compared to the sensitivity for hydrogen gas on Si and OIT/

... Show More
View Publication
Crossref (27)
Crossref
Publication Date
Sun Feb 01 2015
Journal Name
Journal Of Engineering
Unit Price and Cost Estimation Equations through Items Percentage of Construction Works in a Desert Area
...Show More Authors

This research will cover different aspects of estimating process of construction work in a desert area. The inherent difficulties which accompany the cost estimating of the construction works in desert environment in a developing country, will stem from the limited information available, resources scarcity, low level of skilled workers, the prevailing severe weather conditions and many others, which definitely don't provide a fair, reliable and accurate estimation. This study tries to present unit price to estimate the cost in preliminary phase of a project.  Estimations are supported by developing mathematical equations based on the historical data of maintenance, new construction of managerial and school projects.

... Show More