Paul Auster's City of Glass is here singled out as representative of the writer's The New
York Trilogy. All throughout his novelistic career, Auster has been working on a pseudothesis
that adheres to a certain aesthetic of disappearance. The study engages this Austerian
aesthetic apropos of certain theoretical stretches such as the Emersonian "Not Me", the
Thoreauvian "interval" or "nowhere", the Deleuzian "nomadic trajectory", the Derridian
"grammè" or "specter", and the Baudrillardian "disappearance". The city of the novel's titling
is here seen as the trope of all that which has already disappeared, and hence it is seen as the
space (mise en scène) where the perfect crime of the murder of the real is to be thoro
The major climate changes that have affected the planet in addition to wave the big drought plaguing the study area, including the lack of water for imports Badra River fatigue because of the Iran constructing dams on this river and make use of the waters for the benefitof its territory. The subject of finding sources of water has become available with the possibility of exploiting them in an exemplary manner is one of the key things in order to be exploited somewhere.
The study area was chosen within the eastern border of the province of Wasit within the district of Badra border, an area of (1557.5 km2) almost "to study the characteristics of hydrological and identify possibilities for water harvesting them. In this study was conduct
In this paper, variable gain nonlinear PD and PI fuzzy logic controllers are designed and the effect of the variable gain characteristic of these controllers is analyzed to show its contribution in enhancing the performance of the closed loop system over a conventional linear PID controller. Simulation results and time domain performance characteristics show how these fuzzy controllers outperform the conventional PID controller when used to control a nonlinear plant and a plant that has time delay.
In this paper, variable gain nonlinear PD and PI fuzzy logic controllers are designed and the effect of the variable gain characteristic of these controllers is analyzed to show its contribution in enhancing the performance of the closed loop system over a conventional linear PID controller. Simulation results and time domain performance characteristics show how these fuzzy controllers outperform the conventional PID controller when used to control a nonlinear plant and a plant that has time delay.
Diyala Governorate was exposed recently to high flood waves discharged from Hemrin Dam to Diyala River when the dam reached its full capacity. The recently recorded discharge capacity of Diyala River was reduced to just 750m3/s. This exposes cities and villages along the Diyala River to flood risk when discharging the flood waves, which may reach 3000 m3/s. It is important to manage, suggest, and design flood escapes to discharge the flood waves from Hemrin Dam away from Diyala River. This escape branches from Hemrin Lake towards Ashweicha Marsh. One dimensional hydraulic model was developed to simulate the flow within the escape by using HEC-RAS software. Eighty-two cross-sections were ext
... Show MoreThis research represents a practical attempt applied to calibrate and verify a hydraulic model for the Blue Nile River. The calibration procedures are performed using the observed data for a previous period and comparing them with the calibration results while verification requirements are achieved with the application of the observed data for another future period and comparing them with the verification results. The study objective covered a relationship of the river terrain with the distance between the assumed points of the dam failures along the river length. The computed model values and the observed data should conform to the theoretical analysis and the overall verification performance of the model by comparing it with anothe
... Show MoreThis research represents a practical attempt applied to calibrate and verify a hydraulic model for the Blue Nile River. The calibration procedures are performed using the observed data for a previous period and comparing them with the calibration results while verification requirements are achieved with the application of the observed data for another future period and comparing them with the verification results. The study objective covered a relationship of the river terrain with the distance between the assumed points of the dam failures along the river length. The computed model values and the observed data should conform to the theoretical analysis and the overall verification performance of the model by comparing i
... Show More