Abstract
Travel Time estimation and reliability measurement is an important issues for improving operation efficiency and safety of traffic roads networks. The aim of this research is the estimation of total travel time and distribution analysis for three selected links in Palestine Arterial Street in Baghdad city. Buffer time index results in worse reliability conditions. Link (2) from Bab Al Mutham intersection to Al-Sakara intersection produced a buffer index of about 36% and 26 % for Link (1) Al-Mawall intersection to Bab Al- Mutham intersection and finally for link (3) which presented a 24% buffer index. These illustrated that the reliability get worst for link
... Show More Thsst researcher problem of delays faced by researchers are all waiting to evaluate their standards by the experts who must take their views to extract the truth Virtual important step first step in building standards whatsoever, then the difference of opinion among experts about the paragraphs Whatever the scope of their functions, leading to confusion in maintaining these paragraphs or delete? Or ignore the views and opinion of the researcher to maintain the same? Or as agreed upon with the supervisor if he was a student? Especially if the concepts of a modern new building.
Therefore, the researcher sought to try to find a solution to her problem to conduct an experiment to test building steps
Colorectal cancer CRC is the third most commonly diagnosed cancer in males and the second in female, so it is a common and life-threatening disease serum of 48 males and 40 females suffering from CRC disease as group one (G1) without taking a chemotherapy dose, the same patients group tow (G2) after taking the first chemotherapy dose, while group three (G3) whose patients in (G1) and (G2) after second taking a chemotherapy dose. and group four (G4) consist of (30 males and 30 females) healthy Iraqi control. Results showed a significant increase in IL-17, IL-17RA and CEA in G1, while there was a significant decrease in vitamin D concentration in G1 than other groups, also there was positive (+ ve) significant correlation between IL-17 and CE
... Show MoreIn this article, a new deterministic primality test for Mersenne primes is presented. It also includes a comparative study between well-known primality tests in order to identify the best test. Moreover, new modifications are suggested in order to eliminate pseudoprimes. The study covers random primes such as Mersenne primes and Proth primes. Finally, these tests are arranged from the best to the worst according to strength, speed, and effectiveness based on the results obtained through programs prepared and operated by Mathematica, and the results are presented through tables and graphs.
In this paper, we studied the spark corona discharge in tap and distillited waters. The results show the shape of cone that generated on the tip of capillary tube is different with conductivity of liquids. The blue glow appears at the end of capillary tube and the drop extends into a cone. In addition, the conducitivity is affected on the relationship between the appearance of the blue glow discharge with the applied voltage. The size of the cone decreases with an increase in applied voltage. The cone diameter at the base of capillary tube oscillates with period approximately 1 Sec. this oscillates in the cone diameters is due to the change distance between the liquid electrode and the surface of liquid. The intensity of spark corona dis
... Show MoreThe main function of a power system is to supply the customer load demands as economically as possible. Risk criterion is the probability of not meeting the load. This paper presents a methodology to assess probabilistic risk criteria of Al-Qudus plant before and after expansion; as this plant consists of ten generating units presently and the Ministry Of Electricity (MOE) is intending to compact four units to it in order to improve the performance of Iraqi power system especially at Baghdad region. The assessment is calculated by a program using Matlab programming language; version 7.6. Results show that the planned risk is (0.003095) that is (35 times) less than that in the present plant risk; (0.1091); which represents respectable imp
... Show More