Each project management system aims to complete the project within its identified objectives: budget, time, and quality. It is achieving the project within the defined deadline that required careful scheduling, that be attained early. Due to the nature of unique repetitive construction projects, time contingency and project uncertainty are necessary for accurate scheduling. It should be integrated and flexible to accommodate the changes without adversely affecting the construction project’s total completion time. Repetitive planning and scheduling methods are more effective and essential. However, they need continuous development because of the evolution of execution methods, essentially based on the repetitive construction projects’ composition of identical production units. This study develops a mathematical model to forecast repetitive construction projects using the Support Vector Machine (SVM) technique. The software (WEKA 3.9.1©2016) has been used in the process of developing the mathematical model. The number of factors affecting the planning and scheduling of the repetitive projects has been identified through a questionnaire that analyzed its results using SPSS V22 software. Three accuracy measurements, correlation coefficient (R), Root Mean Square Error (RMSE) and Mean Absolute Error (MAE), were used to check the mathematical model and to compare the actual values with predicted values. The results showed that the SVM technique was more precise than those calculated by the conventional methods and was found the best generalization with R 97 %, MAE 3.6 %, and RMSE 7 %.
This research deals with unusual approach for analyzing the Simple Linear Regression via Linear Programming by Two - phase method, which is known in Operations Research: “O.R.”. The estimation here is found by solving optimization problem when adding artificial variables: Ri. Another method to analyze the Simple Linear Regression is introduced in this research, where the conditional Median of (y) was taken under consideration by minimizing the Sum of Absolute Residuals instead of finding the conditional Mean of (y) which depends on minimizing the Sum of Squared Residuals, that is called: “Median Regression”. Also, an Iterative Reweighted Least Squared based on the Absolute Residuals as weights is performed here as another method to
... Show MoreThe geometric morphometric technique was used to study the variables in the shape and size wings of different populations of mosquitoes Culex quinquefasciatus from different Iraqi provinces Babylon, Baghdad and Wasit. The results showed that the average of centroid size were 366, 387.5 and 407.4 Micron in Babylon, Baghdad and Kut, respectively. The statistical analysis showed that there were no significant differences in the average of centroid size of all specimens and they belong to the same species.
This study aim to identify the concept of web based information systems since its one of the important topics that is usually omitted by our organizations, in addition to, designing a web based information system in order to manage the customers data of Al- Rasheed bank, as a unified information system that is specialized to the banking deals of the customers with the bank, and providing a suggested model to apply the virtual private network as a tool that is to protect the transmitted data through the web based information system.
This study is considered important because it deals with one of the vital topics nowadays, namely: how to make it possible to use a distributed informat
... Show MoreMany industrial systems involve multiple criteria and objectives, and they are very complex problems in computational science, such as task scheduling. We propose bi-criteria and bi-objective scheduling problems, which are solved by two nature-inspired evolutionary algorithms, such as Simulated Annealing (SA) and Bee Algorithm (BA). This problem is characterized by scheduling a batch of tasks on multiple machines, and it is fundamental because the solution should focus on the simultaneous optimization of two conflicting objectives: the makespan minimization and the total tardiness minimization. This problem is NP-Hard, and therefore, two evolutionary methods were used to search for solutions intelligently in this huge, very complex
... Show MoreThis paper aims to explain the effect of the taxes policy including direct & indirect taxes on supporting the domestic Investment in Iraq. This could help the official planners for drawing the future policies that help provoking (istumlating) the domestic investment in Iraq the quantitative analysis approach was adopted using regression model. The results showed the significance of the effects of both direct & indirect taxes policies on domestic as a simple correlation coefficient ( r ) of ( 0.6 ) , ( 0.64 ) respectively.
The main aim of this research is to introduce financing cost optimization and different financing alternatives. There are many studies about financing cost optimization. All previous studies considering the cost of financing have many shortcomings, some considered only one source of financing as a credit line without taking into account different financing alternatives. Having only one funding alternative powers, restricts contractors and leads to a very specific financing model. Although it is beneficial for the contractor to use a long-term loan to minimize interest charges and prevent a substantial withdrawal from his credit line, none of the existing financial-based planning models have considered long-term loans in
... Show MoreIn this paper the analysis of the corrosion basic types destructions on an example of buildings constructions is carried out and the basic requirements to materials for designs in construction are defined. A classification of corrosion damage is proposed, which became a prerequisite for selecting the main indicators of materials that maximally affect the quality and durability. The main methods for determining the main indicators of corrosion damage are identified.
Genetic algorithms (GA) are a helpful instrument for planning and controlling the activities of a project. It is based on the technique of survival of the fittest and natural selection. GA has been used in different sectors of construction and building however that is rarely documented. This research aimed to examine the utilisation of genetic algorithms in construction project management. For this purpose, the research focused on the benefits and challenges of genetic algorithms, and the extent to which genetic algorithms is utilised in construction project management. Results showed that GA provides an ability of generating near optimal solutions which can be adopted to reduce complexity in project management and resolve difficult problem
... Show More