Background: The study's objective was to estimate the effects of radiation on testosterone-related hormones and blood components in prostate cancer patients. N Materials and Method: This study aims to investigate the effects of radiation on 20 male prostate cancer patients at the Middle Euphrates Oncology Centre. Blood samples were collected before and after radiation treatment, with a total dose of 60- 70 Gy, The blood parameters were analyzed. The hospital laboratory conducted the blood analysis using an analyzer (Diagon D-cell5D) to test blood components before and after radiation. Hormonal examinations included testosterone levels, using the VIDASR 30 for Multiparametric immunoassay system Results: The study assessed the socio-demography of prostate cancer male patients, revealing that the majority were aged 69.55 t 10.76 years, with a weight of 75.3 t 10.84 Kg and height of 170.50 t 8.70 cm. The stage of cancer was assessed, with 25% of patients being IV and IIV, followed by II, IB, and V. Only one patient was at stage III. The Gleason Score (GS) was used to classify patients, with 40% being given a score of 7, followed by 6, 8, and 9 equally (20%). Total Prostate-specific Antigen (PSA) had a mean value of 12.87 t 2.78. Hematological analysis showed a significant decrease in random blood sugar levels, white blood cells, lymphocytes platelets, and hemoglobin levels after radiotherapy. Testosterone levels also declined after radiotherapy fractions. However, kidney functions like urea and creatinine levels increased after pelvic irradiation Conclusion: The study found that radiation treatment for prostate cancer significantly impacted blood components and hormones associated with testosterone. It led to reduced levels of random blood sugar, white blood cells, lymphocytes, platelets, haemoglobin, and testosterone. Additionally, high-energy therapeutic x-rays increased_ levels of urea and creatinine, indicating the need for strict monitoring and management of adverse effects.
Lead-acid batteries have been used increasingly in recent years in solar power systems, especially in homes and small businesses, due to their cheapness and advanced development in manufacturing them. However, these batteries have low voltages and low capacities, to increase voltage and capacities, they need to be connected in series and parallel. Whether they are connected in series or parallel, their voltages and capacities must be equal otherwise the quality of service will be degraded. The fact that these different voltages are inherent in their manufacturing, but these unbalanced voltages can be controlled. Using a switched capacitor is a method that was used in many methods for balancing voltages, but their respons
... Show MoreActivated carbon prepared from date stones by chemical activation with ferric chloride (FAC) was used an adsorbent to remove phenolic compounds such as phenol (Ph) and p-nitro phenol (PNPh) from aqueous solutions. The influence of process variables represented by solution pH value (2-12), adsorbent to adsorbate weight ratio (0.2-1.8), and contact time (30-150 min) on removal percentage and adsorbed amount of Ph and PNPh onto FAC was studied. For PNPh adsorption,( 97.43 %) maximum removal percentage and (48.71 mg/g) adsorbed amount was achieved at (5) solution pH,( 1) adsorbent to adsorbate weight ratio, and (90 min) contact time. While for Ph adsorption, at (4) solution pH, (1.4) absorbent to adsorbate weight ratio, and (120 min) contact
... Show MoreAbstract
The Purpose of This Research is The Main Factors In out Comes Phenomena From Primary School Which in Creased in Lost Period in Iraq And to Find Solutions to The This Problem.
In Order to Achieve Al The Aim The Research Choose a Systematic Random Sample of School Records For Students in Some Primary Schools in Karkh and Rusafa and Year of Study (2010-2015) and Size (40) Samples, included (16) Variable , Collected in Form Prepared by The Research As a Way to Analyze The Data.
Remember to Summarize The (6) Main components Pay a Student to Drop out of Primary Schools in The Province of Baghdad are Arranged As Follows:
... Show MoreAbstract
This research aims to analyze the reality of the production process in an assembly line Cars (RUNNA) in the public company for the automotive industry / Alexandria through the use of some Lean production tools, and data were collected through permanence in the company to identify the problems of the line in order to find appropriate to adopt some Lean production tools solutions, and results showed the presence of Lead time in some stations, which is reflected on the customer's waiting time to get the car, as well as some of the problems existing in the car produced such as high temperature of the car, as the company does not take into account customer preferences,
... Show MoreThe research studied and analyzed the hybrid parallel-series systems of asymmetrical components by applying different experiments of simulations used to estimate the reliability function of those systems through the use of the maximum likelihood method as well as the Bayes standard method via both symmetrical and asymmetrical loss functions following Rayleigh distribution and Informative Prior distribution. The simulation experiments included different sizes of samples and default parameters which were then compared with one another depending on Square Error averages. Following that was the application of Bayes standard method by the Entropy Loss function that proved successful throughout the experimental side in finding the reliability fun
... Show MoreSocial Aspects in the Kingdom of Mali Through Ibn Battuta's book Tuhfat Alnuddar in Garaeb Al Amsar Wa Ajaeb Al Asfar
Material Requirements Planning System (MRP) is considered as one of the planning and controlling of production and inventory systems which is used to prepare plan of the final production requirements and its parts of subcomponents raw materials and the time at which it was needed for the purpose of preparing orders of production and purchase.
The problem of the present work is represented in the general company of electrical industrialization adoption of traditional methods and personal experience of the process of the products and\or purchase quantity and inventory quantities and limiting the required time for acquiring the required quantities of the materials and parts used in the finish product of the
... Show More