Warm mix asphalt (WMA) is relatively a new technology which enables the production and compaction of asphalt concrete mixtures at temperatures 15-40 °C lower than that of traditional hot mix asphalt HMA. In the present work, six asphalt concrete mixtures were produced in the mix plant (1 ton each) in six different batches. Half of these mixes were WMA and the other half were HMA. Three types of fillers (limestone dust, Portland cement and hydrated lime) were used for each type of mix. Samples were then taken from these patches and transferred to lab for performance testing which includes: Marshall characteristics, moisture susceptibility (indirect tension test), resilient modulus, permanent deformation (axial repeated load test) and fatigue characteristics (third point flexural beam test). The obtained results indicated that the performance of WMA is enhanced when using the hydrated lime as filler in comparison with the limestone dust and Portland cement fillers. Better fatigue life was obtained for WMA using hydrated lime filler in comparison with HMA. Regardless the filler type, the Marshall properties of WMA satisfy the requirement of local specification, other properties of WMA were relatively lower than the HMA.
Basrah crude oil Vacuum residue 773+ K with specific gravity 1.107 and 4.87wt. % sulfur, was treated with hexane commercial fraction provided from Al-Taji Gas Company for preparing deasphaltened oil(DAO)suitable for hydrotreating process. Deasphaltening was carried out with 1h mixing time, 10ml:1g solvent to oil ratio and at room temperature. Hexane deasphaltened oil was hydrotreated on presulfied commercial Co-Mo/γ-Al2O3 catalyst in a trickle bed reactor. The hydrotreating process was carried out at temperature 660 K,LHSV 1.3 h^ –1, H2/oil ratio 300 l/l and constant pressure of 4MPa. The hydrotreated product was distillated under vacuum distillation unit. It is found that the mixture of 75% of vacuum residue with 25% anthracene satisfie
... Show MorePorous asphalt paving is a modern design method that differs from the usual asphalt pavements' traditional designs. The difference is that the design structure of porous pavements allows the free passage of fluids through their layers, which controls or reduces the amount of runoff or water accumulated in the area by allowing the flow of rain and surface runoff. The cross-structure of this type of paving works as a suitable method for managing rainwater and representing groundwater recharge. The overall benefits of porous asphalt pavements include environmental services and safety features, including controlling the build-up of contaminated metals on the road surface, rainwater management, resistance to slipping ac
... Show MoreThe research of three-based financial indicators to create value for shareholders, have been identified research problem in a number of the questions revolved around the extent to which it can express its based performance metrics to create value for the essence and the reality of the surveyed enterprises performance, Can the departments surveyed companies to choose the scale or the most harmonizing index and an expression of the actual performance of the company, has the goal of research is to diagnose the strengths and weaknesses in the performance of the surveyed enterprises through the use of a number of based on the concept of creating economic value and the search for the most suitable indicator to the reality of the perfor
... Show MoreStone Matrix Asphalt (SMA) is a gap-graded asphalt concrete hot blend combining high-quality coarse aggregate with a rich asphalt cement content. This blend generates a stable paving combination with a powerful stone-on-stone skeleton that offers excellent durability and routing strength. The objectives of this work are: Studying the durability performance of stone matrix asphalt (SMA) mixture in terms of moisture damage and temperature susceptibility and Discovering the effect of stabilized additive (Fly Ash ) on the performance of stone matrix asphalt (SMA) mixture. In this investigation, the durability of stone matrix asphalt concrete was assessed in terms of temperature susceptibility, resistance to moisture damage, and sensitivity t
... Show MoreMoisture damage is one of the most significant troubles that destroy asphaltic pavement and reduces road serviceability. Recently, academics have noticed a trend to utilize fibers to enhance the efficiency of asphalt pavement. This research explores the effect of low-cost ceramic fiber, which has high tensile strength and a very high thermal insulation coefficient, on the asphalt mixture's characteristics by adding three different proportions (0.75%, 1.5%, and 2.25%). The Marshall test and the Tensile Strength Ratio Test (TSR) were utilized to describe the impact of ceramic fiber on the characteristics of Marshall and the moisture susceptibility of the hot mix asphalt mixture. The Field Emission Scanning Electron Microsc
... Show MoreThe kaizen is considered as one of the most important modern techniques which has been adopted by various economics entities especially manufacturing firms and its beginnings return to the middle of the earlier century that has been used by companies like Toshiba, Matsushita Electric, and Toyota. Which realized that these modern techniques would make a total change in the competitive environment and started qualifying and its staff in such away that enables them to go along with this unique environment. The continuous improvement (Kaizen) depends on the small continuous improvements in the product and the production operations during the production stage. Consequently, the research problem is represented in the improperly of the budg
... Show MoreThe research intent evaluates the performance of material technical department / Technical College -Baghdad.
The study depend on the descriptive analytical approach to determine and treating the variables to get data and information that related to study, the researchers depended on questionnaire designed for this purpose and contains eight main dimensions that’s are scientific reference , academy course, staff member , administrative system, physical facilities , student ,scientific research, graduate service , in addition each dimension involved (5) items contacted with mean dimensions, which translate aspects of performance evaluation, the questionnaire applied on two samples staff member
... Show MoreThe industrial production sector has an important role in the national economy of the advanced countries as well as the developing ones to get higher levels for their economy . We in Iraq , just like most of the develpoing countries , our economy still suffers of great shortage in this active sector in spite of the repeated statements about the desire of activating the contribution of this sector in the national economy . The industrial sector in Iraq suffers in general of many problems , especially the public industrial sector (manufacturing) . These problems have been existed because of the unnatural conditions that Iraq has passed during the previous decades especially in the political and security sides . which reflecte
... Show MoreContemporary management is interested in the process of performance assessment because of its significance in the field of planning and controlling the multiactiveties to attain its goals and uncovering digression of virtual performance after comparing it with the plan or equitable performance.
Digression is analyzed to enable management control centers of authority.
Assessment process significance is closely related by setting definite categories to evaluate the economic activity to know the ability to achieves aims.
This study concentrated on the most important categories that used to evaluate company understudy with ather categories suggested to complete assessment process.
This study is in
... Show MoreThe construction project is a very complicated work by its nature and requires specialized knowledge to lead it to success. The construction project is complicated socially, technically and economically in its planning, management and implementation aspects due to the fact that it has many variables and multiple stakeholders in addition to being affected by the surrounding environment. Successful projects depend on three fundamental points which are cost-time, performance and specifications. The project stakeholder's objective to achieve best specifications and the cost-time frame stipulated in the contract.
The question is, was the optimum implementation accomplished? The provision for the success of the project
... Show More