The goal of this study is to build an application that can be used in difficult cases and sudden circumstances during the pandemic and post-disaster state, which can be the development of digital risk management and mitigating the difficult impact of the epidemic through the improvement of IT and IoT that can be fine by finding initial solutions and make the world like a digital city that could be managed by the network. We provide this study to gain an overview of reasons for delayed and exceeded costs in a select of thirty Iraqi case projects by controlling the time and cost. The drivers of delay have been investigated in multiple countries/contexts. however, there is little country data available under the conditions that have characterized Iraq over the previous 10-20 years.
The main part in hydraulic system is directional control valve. Directional control valve has complex construction such as moving spool to control the direction of actuator for required speed. Magneto-rheological (MR) fluid is one of controllable fluids. Utilizing the MR fluid properties, direct interface can be realized between magnetic field and fluid power without the need for moving parts like spool in directional control valves. This study proposes the design of four ways/three position MR proportional directional control valve (4/3 MR valve). The construction of valve and the principle of work are presented. Analysis for magnetic circuit and simulation for valve performance were done. The experiment was conducted to show the principle
... Show MoreFinancial funding of a construction firm plays an important role in all aspects of the process development. It has been noted that financial crises have a direct impact on the construction industry. The Iraqi government, whether locally or globally, has faced a severe shortage of financing which has resulted in incomplete projects. Due to the financial crisis that Iraq went through which led to the suspension of many residential complex projects and the difficulty of the use of public financing methods, we researched the private financing (public-private partnership) methods instead of public financing methods in residential complex projects implementation. This study verified the financial problems and the factors that relate to th
... Show MorePublic private partnership PPP is a method to procure public projects in order to achieve additional value for money in terms of efficiency and quality of services. This thesis studies the concepts of PPP, advantages and disadvantages of PPP. In addition, current Iraq infrastructure projects situations and needs, as well as, some aspects relating to the Iraq’s construction market, legal and contract systems were discussed. A financial model was carried out and applied to a real-life case study project. Finally, a survey targeted researchers; public and private- sectors were applied.
Effective decision-making process is the basis for successfully solving any engineering problem. Many decisions taken in the construction projects differ in their nature due to the complex nature of the construction projects. One of the most crucial decisions that might result in numerous issues over the course of a construction project is the selection of the contractor. This study aims to use the ordinal priority approach (OPA) for the contractor selection process in the construction industry. The proposed model involves two computer programs; the first of these will be used to evaluate the decision-makers/experts in the construction projects, while the second will be used to formul
Water supply projects (WSP) requires high plan information, specialized capabilities, capable human resources, and high administrative capacity. However, in the developing countries, particularly in Iraq, these projects experience a lack of a large number of these necessities, which shows the need to identify the critical success factors (CSFs). Accordingly, the objectives of this research are to investigate the CSFs for WSP and their significance among the construction (public and private) and education sectors. To achieve this, first we have carried out a comprehensive literature review of the CSFs for WSP. Second, we administrated a questionnaire survey to 260 construction experts
In this research, that been focused on the most important economic benefits expected when applying the three standards of sustainability in construction projects (economic, environmental and social). Fuzzy AHP, a multi-decision decision-making technique for evaluating construction projects. Which when used we get the speed and accuracy in the results. Using this technique will reduce uncertainties decisions significantly (fuzzy environment), that found in most projects .The results of the data analysis showed that the economic standards take the greatest relative importance (60%) among the three sustainability standards. Therefore, the implementation of any standards need a cost so the economic benefit of any proje
... Show MoreResidential complexes have witnessed a great demand in most countries worldwide, as they are one of the main infrastructure elements, in addition to achieving a developed urban landscape. However, complex residential projects in developing countries face various factors that could be improved in their implementation, especially in Iraq. Sixty-two experts in residential complex projects were interviewed and surveyed to verify these projects' failure factors,. Fifty-one factors were the main failure factors, divided into four main components (leadership, management system, external forces, and project resources). The Relatively Important Index (RII) is used to determine the relative importance factors and obtain the top tw