Preferred Language
Articles
/
WxZnR4gBVTCNdQwCwXY5
Identifying Causes of Variation in Construction Industry Based on Questionnaire
...Show More Authors

Publication Date
Sun Feb 01 2026
Journal Name
Journal Of Structural Design And Construction Practice
Strategies to Achieve Professional Workforce Maturity in Construction
...Show More Authors

View Publication
Scopus Crossref
Publication Date
Tue Aug 01 2023
Journal Name
Journal Of Engineering
Risk Response in Construction Project: A Review Study
...Show More Authors

Construction projects are characterized as projects with multi phases and activities, complex, unique, and have many different parties and stakeholders. Risks could appear at one or more of the construction project stages and may affect the achievement of project objectives. Therefore, one of the key elements in the planning phase of any project is the risk management process (RMP). This study attempts to understand the terminology of risk in general, risk management, and response to risk in particular. This study is mainly a review of thirty-eight studies that have been published between 1997 and 2020 that demonstrate the importance of the crucial phase of risk response from the risk management process and its impact on

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Thu Oct 01 2020
Journal Name
Journal Of Engineering
Financing Cost Optimization in Construction Sector: A Review
...Show More Authors

The main aim of this research is to introduce financing cost optimization and different financing alternatives. There are many studies about financing cost optimization. All previous studies considering the cost of financing have many shortcomings, some considered only one source of financing as a credit line without taking into account different financing alternatives. Having only one funding alternative powers, restricts contractors and leads to a very specific financing model. Although it is beneficial for the contractor to use a long-term loan to minimize interest charges and prevent a substantial withdrawal from his credit line, none of the existing financial-based planning models have considered long-term loans in

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Aug 01 2023
Journal Name
Iop Conference Series: Earth And Environmental Science
Prediction of Biodegradability Possibility for Sewage of the Dairy Industry
...Show More Authors

he dairy industry is one of the industrial activities classified within the food industries in all phases of the dairy industry, which leads to an increase in the amount of wastewater discharged from this industry. The study was conducted in the Abu Ghraib dairy factory, classified as one of the central factories in Iraq, located in the west of Baghdad governorate, with a design capacity of 22,815 tons of dairy products. The characteristics of the liquid waste generated from the factory were determined for the following parameters biological oxygen demand (BOD5), Chemical oxygen demand (COD), total suspended solids (TSS), pH, nitrate, phosphate, chloride, and sulfate with an average value of (1079, 1945, 323, 9.2, 24, 2

... Show More
View Publication
Scopus (1)
Crossref (1)
Scopus Crossref
Publication Date
Sun May 02 2021
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
The role of the auditor in allocating common costs in the gas industry and its reflection on the company's performance: Applied Research in North Gas Company
...Show More Authors

The auditor has a role in allocating joint costs in the gas industry, and the auditor's procedures are considered as systematic critical examination, analysis and evaluation of everything related to costs in general and joint costs in the gas industry in particular, with the aim of controlling the joint costs of gas industry products, and knowing the share of the cost of each product from the total industry costs Gas products reflect the reality of the company's performance by discovering weaknesses, defects and any errors, to ensure increased effectiveness and efficiency of the parties concerned with auditing them and imposing control and control over the company's resources, as well as

... Show More
View Publication Preview PDF
Publication Date
Fri Apr 22 2022
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
Developing models to predicting the effect of crises on construction projects using MLR technique
...Show More Authors

View Publication
Scopus (1)
Crossref (1)
Scopus Crossref
Publication Date
Thu Jul 07 2022
Journal Name
Public Works Management & Policy
Impact of Pandemic SARS COVID-19 on Different Construction Project Management: Problems and Solutions
...Show More Authors

This study discusses risk management strategies caused by pandemic-related (Covid-19) suspensions in thirty-six engineering projects of different types and sizes selected from countries in the middle east and especially Iraq. The primary data collection method was a survey and questionnaire completed by selected project crew and laborers. Data were processed using Microsoft Excel to construct models to help decision-makers find solutions to the scheduling problems that may be expected to occur during a pandemic. A theoretical and practical concept for project risk management that addresses a range of global and local issues that affect schedule and cost is presented and results indicate that the most significant delays are due to a

... Show More
Scopus (8)
Crossref (10)
Scopus Clarivate Crossref
Publication Date
Thu Jul 07 2022
Journal Name
Public Works Management & Policy
Impact of Pandemic SARS COVID-19 on Different Construction Project Management: Problems and Solutions
...Show More Authors

This study discusses risk management strategies caused by pandemic-related (Covid-19) suspensions in thirty-six engineering projects of different types and sizes selected from countries in the middle east and especially Iraq. The primary data collection method was a survey and questionnaire completed by selected project crew and laborers. Data were processed using Microsoft Excel to construct models to help decision-makers find solutions to the scheduling problems that may be expected to occur during a pandemic. A theoretical and practical concept for project risk management that addresses a range of global and local issues that affect schedule and cost is presented and results indicate that the most significant delays are due to a

... Show More
View Publication
Scopus (8)
Crossref (10)
Scopus Clarivate Crossref
Publication Date
Wed Feb 03 2016
Journal Name
Iraqi Journal Of Physics
Study the variation of synodic month for the moon through 2000-2100
...Show More Authors

In this research study the synodic month for the moon and theirrelationship with the mean anomaly for the moon orbit and date A.Dand for long periods of time (100 years), we was design a computerprogram that calculates the period of synodic months, and thecoordinates of the moon at the moment of the new moon with highaccuracy. During the 100 year, there are 1236 period of synodicmonths.We found that the when New Moon occurs near perigee (meananomaly = 0°), the length of the synodic month at a minimum.Similarly, when New Moon occurs near apogee (mean anomaly =180°), the length of the synodic month reaches a maximum. Theshortest synodic month on 2053 /1/ 16 and lasted (29.27436) days.The longest synodic month began on 2008 /11/ 27 a

... Show More
View Publication
Crossref
Publication Date
Sun Feb 03 2019
Journal Name
Iraqi Journal Of Physics
Study the variation of synodic month for the moon through 2000-2100
...Show More Authors

In this research study the synodic month for the moon and their
relationship with the mean anomaly for the moon orbit and date A.D
and for long periods of time (100 years), we was design a computer
program that calculates the period of synodic months, and the
coordinates of the moon at the moment of the new moon with high
accuracy. During the 100 year, there are 1236 period of synodic
months.
We found that the when New Moon occurs near perigee (mean
anomaly = 0°), the length of the synodic month at a minimum.
Similarly, when New Moon occurs near apogee (mean anomaly =
180°), the length of the synodic month reaches a maximum. The
shortest synodic month on 2053 /1/ 16 and lasted (29.27436) days.
The lo

... Show More
View Publication Preview PDF
Crossref