Diagnoses of Delay Causes in Construction Projects During Disaster
...Show More Authors

Purpose: The aim of this study was to gain insight into causes of time delays and cost overruns in a selection of thirty case projects in Iraq. Delay factors have been studied in many countries/contexts, but not much data exists from countries under the conditions characterizing Iraq during the last 10-15 years.Design/methodology/approach: A case study approach was adopted, with thirty construction projects selected from the Baghdad region, of different types and sizes. For the case of the study, the participants in the projects provided data about the projects through the data collection tool distributed through the questionnaire directed to them. Statistical data analysis was used to build statistical relationships between time and cost delay ratios and delay factors.Findings: Major delay factors identified were contractor failures resulting in schedule overruns, re-designs, poor planning and frequent change orders, security issues, low bid selection, weather factors, and owner failures.Originality/value: While many studies have looked into factors causing delays and cost overruns, few have studied projects in conditions such as have dominated Iraq the last decade and a half during pandemic as external factors. As such, this study offers unique insights into factors that need to be taken into account when implementing projects in such a context

Crossref
View Publication
Publication Date
Mon Mar 08 2021
Journal Name
Baghdad Science Journal
Seasonal occurence of aquatic fungi in tigris river during 2002
...Show More Authors

Studied Seen fungi water in nine stations or selected sites along the Tigris River began from the city of Mosul in the north to Qurna in episodes were measured some chemical agents and Alvezaúah water ranged pH values ??(11p) between 7.0 to 8.3 either temperatures ranged between 10to 28 m study showed isolated 22 species of 14 genera of fungi

View Publication Preview PDF
Publication Date
Thu Jan 01 2015
Journal Name
Al–bahith Al–a'alami
Public confidence in the content of satellite channels during crises
...Show More Authors

Most studies combine that it is important to determine the extent of the public's trust TV for two reasons. First of knowing the impact of satellite TV audience ranges and the second determining public outlets for Information Find regard to the extent of the public's confidence in knowing the contents of the satellite during the occupation of Mosul crisis by organizing the Islamic state in Iraq and the Levant And the researcher developed a questionnaire to find out the public's confidence statement satellite contents provided by the questions related to exposandscale.

 

     The researcher audience chose the city of Baghdad to the suitabil

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Aug 01 2023
Journal Name
Journal Of Engineering
Risk Response in Construction Project: A Review Study
...Show More Authors

Construction projects are characterized as projects with multi phases and activities, complex, unique, and have many different parties and stakeholders. Risks could appear at one or more of the construction project stages and may affect the achievement of project objectives. Therefore, one of the key elements in the planning phase of any project is the risk management process (RMP). This study attempts to understand the terminology of risk in general, risk management, and response to risk in particular. This study is mainly a review of thirty-eight studies that have been published between 1997 and 2020 that demonstrate the importance of the crucial phase of risk response from the risk management process and its impact on

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Thu Oct 01 2020
Journal Name
Journal Of Engineering
Financing Cost Optimization in Construction Sector: A Review
...Show More Authors

The main aim of this research is to introduce financing cost optimization and different financing alternatives. There are many studies about financing cost optimization. All previous studies considering the cost of financing have many shortcomings, some considered only one source of financing as a credit line without taking into account different financing alternatives. Having only one funding alternative powers, restricts contractors and leads to a very specific financing model. Although it is beneficial for the contractor to use a long-term loan to minimize interest charges and prevent a substantial withdrawal from his credit line, none of the existing financial-based planning models have considered long-term loans in

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Dec 01 2021
Journal Name
Professional Safety
How Technology Can Improve OSH Management in Construction
...Show More Authors

Publication Date
Mon Apr 05 2021
Journal Name
Solid State Technology
Genetic Algorithms in Construction Project Management: A Review
...Show More Authors

Genetic algorithms (GA) are a helpful instrument for planning and controlling the activities of a project. It is based on the technique of survival of the fittest and natural selection. GA has been used in different sectors of construction and building however that is rarely documented. This research aimed to examine the utilisation of genetic algorithms in construction project management. For this purpose, the research focused on the benefits and challenges of genetic algorithms, and the extent to which genetic algorithms is utilised in construction project management. Results showed that GA provides an ability of generating near optimal solutions which can be adopted to reduce complexity in project management and resolve difficult problem

... Show More
View Publication Preview PDF
Publication Date
Sat Oct 01 2016
Journal Name
Journal Of Engineering
Intelligence in Construction between Contemporary and Traditional Architecture
...Show More Authors

The authentic traditional architecture proved that it is very convenient to the environmental and social regulations where it appeared and lasted for hundred of years.

This traditional architecture got the intelligence in providing thermal comfort for their occupants by the intelligent usage of the building materials and the intelligent planning and designs which took in consideration the climatic condition and the aerodynamics of the whole city as one ecological system starting from the cold breeze passing through its narrow streets till it enters the dwelling units and glides out through the wind catchers.

This architecture had been neglected and replaced by modern imported architecture which had collap

... Show More
View Publication Preview PDF
Publication Date
Tue Dec 30 2008
Journal Name
Al-kindy College Medical Journal
Myomectomy During Early Pregnancy
...Show More Authors

Myoma is a common benign uterine tumor; therefore
it is common in pregnancy. One in ten women will
have complications related to myoma in pregnancy.
Few treatment options are available during pregnancy,
conservative treatment with analgesia, reassurance and
supportive therapy is almost always adequate but in
carefully selected patients, myomectomy has been
performed successfully without jeopardizing
pregnancy outcome. The usual indications for surgery
during pregnancy include torsion of pedunculated
uterine myoma and obstructed labor, surgical
intervention during pregnancy is occasionally
necessary in uncommon cases of intractable pain.
19 years old lady presented with intractable lower
abdominal

... Show More
View Publication Preview PDF
Publication Date
Fri Jan 04 2019
Journal Name
Journal Of Planner And Development
Impact of D.B.M. Best practices on Community Rehabilitation Projects
...Show More Authors

View Publication Preview PDF
Publication Date
Mon Aug 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
The Development of the Suez Canal and Projects Competitors
...Show More Authors

The area around the Suez Canal has been chosen particularly  Sinai  to implement the new Suez Canal project parallel to the original 72-km-long channel due to the importance of the commercial site of the Arab Republic of Egypt, competing with shipping lanes, to accommodate the increasing maritime traffic  passing through the Suez canal, and to provide special services for trade world and reduce the economic cost of marine trip. The establishment of six tunnels for automobile and railway transport to Sinai The cost of the establishment of this new channel  and the establishment of the tunnels about (2.8) billion, of which 4 billion cost of the new channel. Project implementation period is one year. The new proj

... Show More
View Publication Preview PDF
Crossref