Risk identification and assessment can be analysed using many risk management tools. Fishbone diagram is one of these techniques which can be employed, for the identification of the causes behind the construction failure, which has become a phenomenon that often gets repeated in several projects. If these failures are not understood and handled scientifically, it may lead to disputes between the project parties. Additionally, the construction failure also leads to an increase in the project budget, which in turn causes a delay in the completion of the projects. Punching shear in reinforcement slab may be one of the reasons for construction failures. However, there are many doubts about other causes that lead to this failure as well as the role of these causes in the construction failure. Also, there are many causes linked to this failure of which some fall on the designer and the others fall on the contractor. Thus, this research aims to determine the causes of punching shear failure in the concrete slab and its role in the failure using a logic managerial analysis. For this purpose, the applicability of the Fishbone diagram has been extended, for the analysis of probability as well as the impact of the risk of punching shear, thus elucidating the risk score of each category without ignoring the global risk. In this direction, interviews and questionnaires are conducted with numerous experts specialize in both the design and execution field of construction projects for identifying the most important causes that lead to the occurrence of punching shear failure. Further, the Fishbone diagram for punching shear’s risk illuminated that impact of some of the primary and secondary causes such as planning, designing, and maintenance is more than the expectation. Therefore, the concentration in these areas should be carried out by taking into consideration the adapt risk response plan to prevent or mitigate these risks.
Current design codes and specifications allow for part of the bonded flexure tension reinforcement to be distributed over an effective flange width when the T-beams' flanges are in tension. This study presents an experimental and numerical investigation on the reinforced concrete flanged section's flexural behavior when reinforcement in the tension flange is laterally distributed. To achieve the goals of the study, numerical analysis using the finite element method was conducted on discretized flanged beam models validated via experimentally tested T-beam specimen. Parametric study was performed to investigate the effect of different parameters on the T-beams flexural behavior. The study revealed that a significant reduction in the
... Show MoreBuried pipeline systems are commonly used to transport water, sewage, natural oil/gas and other materials. The beneficial of using geogrid reinforcement is to increase the bearing capacity of the soil and decrease the load transfer to the underground structures.
This paper deals with simulation of the buried pipe problem numerically by finite elements method using the newest version of PLAXIS-3D software. Rajkumar and Ilamaruthi's study, 2008 has been selected to be reanalyzed as 3D problem because it is containing all the properties needed by the program such as the modulus of elasticity, Poisson's ratio, angle of internal friction. It was found that the results
... Show MoreInformation pollution is regarded as a big problem facing journalists working in the editing section, whereby journalistic materials face such pollution through their way across the editing pyramid. This research is an attempt to define the concept of journalistic information pollution, and what are the causes and sources of this pollution. The research applied the descriptive research method to achieve its objectives. A questionnaire was used to collect data. The findings indicate that journalists are aware of the existence of information pollution in journalism, and this pollution has its causes and resources.
orphological changes, represented by erosion and sedimentation, are a natural phenomenon that occurs in most river estuaries, causing changes in waterways and affecting offshore structures. One of these estuaries is the Shatt Al-Arab River estuary, which is the main waterway for trade and a major outlet for oil exports, is suffering from these changes. Moreover, the Thalweg Line, which is the deepest point within the estuary, forms the international border between Iraq and Iran. This line is moving at some rate towards the Iraqi land. To understand the process of erosion and sedimentation within the Shatt Al-Arab River estuary, a hydraulic mathematical simulation by using both HEC RAS and ANSYS Software. The HEC RAS was used to simulate the
... Show MoreIn the present investigation two different types of fiber reinforced polymer composites were prepared by hand lay-up method using three different parameters (curing temperature, pressing load and fiber volume fraction). These composites were prepared from the polyester resin as the matrix material reinforced with glass fibers as first group of samples and mat Kevlar fibers as the second group, both with different volume fractions (4%, 8%, and 12%) of fibers. They were then tested by tensile strength and impact strength. The main objective in this study is to use Taguchi method for predicting the better parameters that give the better tensile and impact strength to the composites, and then preparing composites at
... Show MoreThe Financial authority is considered as one of the most of benefited parts from financial statements which depends on it in process of accounting in taxes as basis to determine The Tax Base , but no confidence from financial authority part in objectivity of income financial information in them for many of limited companies led to no dependence on them to specify taxation contain & dependence on yearly regulations that issued them. To enhance the confidence of financial authority to these lists must meet its requirements, because the menus Fulfill the requirements of the financial authority increases the confidence in these statements and therefore reliable in determining the tax base. So this research aims to speci
... Show Moreosion and deposition are natural phenomena in rivers that can be identified by using velocity profiles and shear stress as indicators. The Shatt Al-Arab River located south of Iraq suffers from these phenomena. Based upon the basic principles of hydraulics, it is reasonably easy to identify shear stress distributions within the river reach of the Shatt Al-Arab; and that will allow us to know the locations of the erosion and deposition. For this purpose, a 2D model using HEC-RAS software was developed to simulate the flow within the lower reach of Shatt Al-Arab. The results showed that the maximum shear stress at the right bank of Shatt Al- Arab reached 0.1N/m2 at 12 km upstream of Ras- Al-Bisha. This value of shear stress was recorded durin
... Show MoreThis study evaluates the flexural behavior of ultra-thin (50 mm) one‑way reinforced‑concrete (RC) slabs retrofitted with near‑surface mounted (NSM) carbon‑fiber‑reinforced polymer (CFRP) rods under quasi‑static loading. T300‑grade CFRP rods (≈4 mm diameter) were bonded in pre‑cut 7 mm × 7 mm grooves using a two‑part epoxy. As a proof-of-concept experimental baseline, three simply‑supported specimens (1000 mm × 500 mm × 50 mm) were tested in a six‑point bending configuration (four applied loads + two reactions): two conventional controls and one strengthened slab. A load‑control rate of ~15 kN/min was applied; the controls were cycled twice and the strengthened slab four times. Relative to the average of
... Show More