Finite Element Approach is employed in this research work to solve the governing differential equations related to seepage via its foundation's dam structure. The primary focus for this reason is the discretization of domain into finite elements through the placement of imaginary nodal points and the discretization of governing equations into an equation system; An equation for each nodal point or part, and unknown variables are solved. The SEEP / W software (program) is a sub-program of the Geo-Studio software, which is used by porous soil media to compensate for the problems of seepage. To achieve the research goals, a study was carried out on Hemrin dam, which located in the Diyala River 100 km northeast of Baghdad, Iraq. Thus, one cross-section is selected for different elevations (minimum, normal and maximum or flood design elevations) to compute the seepage of water, pore water pressure and phreatic line. By theoretical analysis appeared that when the water reservoir was connected to the flood level, a problem may occur in the downstream face of the dam lead to seepage failure. A set of solutions checked by using the Geo-Studio software has been suggested in this research to solve this problem. In addition, and by analytical approach SLOPE/W (a sub-program of the Geo-Studio software) are used to assess the stability of the downstream slope and calculation factor of safety.
The current study aimed to determine the relation between the lead levels in the blood traffic men and the nature of their traffic work in Baghdad governorate. Blood samples were collected from 10 traffic men and the age about from 20-39 year from Directorate of Traffic Al Rusafa/ Baghdad and 10 samples another control from traffic men too with age 30-49 year and they livedrelatively in the clear cities or contained of Very few traffic areas. The levels of lead in blood estimated by used Atomic Absorption Spectrometry.
The result stated that there is no rising of the levels of lead in blood of traffic men Lead concentration was with more a range from 14 ppm in Traffic police are not healthy They are within the permissible limits, Ap
Diverting river flow during construction of a main dam involves the construction of cofferdams, and tunnels, channels or other temporary passages. Diversion channels are commonly used in wide valleys where the high flow makes tunnels or culverts uneconomic. The diversion works must form part of the overall project design since it will have a major impact on its cost, as well as on the design, construction program and overall cost of the permanent works. Construction costs contain of excavation, lining of the channel, and construction of upstream and downstream cofferdams. The optimization model was applied to obtain optimalchannel cross section, height of upstream cofferdam, and height of downstream cofferdamwith minimum construction cost
... Show MoreThe research explain the analysis of finance investments through analyze the finance tables for commercial banks, by using the pointers to indicate the limits of economical benefit for these investments, and fix the negative deviations and as well positive, for the purpose of diagnostic the negative (disadvantage) and develop the advantage deviation, For the importance of finance investments in the development operation and economical growth, further to that the finance investments is represent one of the most activities in the commercial banks in which aim the adequate incomes as a result of the commercial banks act to receipt the banks deposits and then make it growth and develop through commercial advantage o
... Show MorePlane cubics curves may be classified up to isomorphism or projective equivalence. In this paper, the inequivalent elliptic cubic curves which are non-singular plane cubic curves have been classified projectively over the finite field of order nineteen, and determined if they are complete or incomplete as arcs of degree three. Also, the maximum size of a complete elliptic curve that can be constructed from each incomplete elliptic curve are given.
The purpose of this study is to show the constants and variables geography in Russian
policy in light of variables geostrategic witnessed by the world, especially after the collapse
of the Soviet Union and the disintegration to fifteen Republic became the Russian Federation
and the heir to the Soviet Union, Geography particularly important because the impact of its
data in policy making less change ofothers, and explain the political choices cannot achieve
security through its relationship constants geographical (natural or human) paint forms of
economic activity and determine the points they national security. issue is the geographical
this or that country is determined by its policy also specifies the way in which
Varied uses of international rivers in the past few decades dramatically, resulting in this multiplicity of uses and all associated with it for the occurrence of freshwater scarcity activities, and thus an increase in conflicts and disputes around on the rights of each of the riparian countries to benefit from the waters of the river at various purposes, particularly the establishment of dams on some of them as is the case (Renaissance Ethiopian) big impact on downstream countries Dam (Egypt and Sudan), due to the Oukuahma at the end of the Nile Valley made them vulnerable to environmental fluctuations, political crises facing the Nile basin countries, and any reduction in the proportion of water is not only the Nile River, but for all r
... Show MoreAccurate computation of the roughness coefficient is important in the studies of open channel flow. To measure and identify the hydraulic characteristics of the flow system, the model simulation is necessary to study and get the results of the hydraulic properties to specify Manning coefficient of the Euphrates River. In this study, the reach is extended along the Euphrates River from Haditha Dam to Ramadi Barrage with a distance of 169km. The HEC-RAS model was implemented to simulate the flow within the study reach. The geometry of the river was represented by more than two hundred cross-sections surveyed in 2013 and 2021. The model was calibrated using some observed discharges at the Heet gage station for records of th
... Show MoreWellbore instability problems cause nonproductive time, especially during drilling operations in the shale formations. These problems include stuck pipe, caving, lost circulation, and the tight hole, requiring more time to treat and therefore additional costs. The extensive hole collapse problem is considered one of the main challenges experienced when drilling in the Zubair shale formation. In turn, it is caused by nonproductive time and increasing well drilling expenditure. In this study, geomechanical modeling was used to determine a suitable mud weight window to overpass these problems and improve drilling performance for well development. Three failure criteria, including Mohr–Coulomb, modifie