Preferred Language
Articles
/
Uheuoo4BVTCNdQwC51b6
The Prospective of Artificial Neural Network (ANN’s) Model Application to Ameliorate Management of Post Disaster Engineering Projects
...Show More Authors

Currently and under the COVID-19 which is considered as a kind of disaster or even any other natural or manmade disasters, this study was confirmed to be important especially when the society is proceeding to recover and reduce the risks of as possible as injuries. These disasters are leading somehow to paralyze the activities of society as what happened in the period of COVID-19, therefore, more efforts were to be focused for the management of disasters in different ways to reduce their risks such as working from distance or planning solutions digitally and send them to the source of control and hence how most countries overcame this stage of disaster (COVID-19) and collapse. Artificial intelligence should be used when there is no practical solution for a problem occurring in a projects starting from individual self-development ending to the adaptation to information technology sector with a continuous posting in this world of information industry where as metaphor “needs is a cause of creativity”. This study focuses on the use of artificial neural networks ANN to find a solution to issues in projects delays and furthermore when there is no physical or mathematical solution found so far. ANN’s were used to build a model that helps in finding a solution for delays in some selected projects in Baghdad (as case study), and discussing the strategies of rebuilding plus delays in time and cost due to delay factors. 35 construction projects were chosen in Baghdad greater area, vary in sizes and types. Crew and laborers were targeted in sampling collection methodology basically throughout questionnaire forms of field survey as they were filled by them. ANN’s helped in modelling delays factors to help decision makers in an appropriate management of projects. External factors which includes disasters mentioning COVID-19 as the most important disaster ever happened in the last decades, were the most important factor that caused delay in time and cost of projects implementation processes where this factor was controlling the other major factors such as contractor failure, redesigning, changing orders, security issues, low prices, besides weather issues and owner failure.

Crossref
View Publication
Publication Date
Sun Jan 01 2017
Journal Name
Rsc Advances
Investigation of the post-annealing electromagnetic response of Cu–Co oxide coatings via optical measurement and computational modelling
...Show More Authors

The annealing temperature (200–500 °C) effects of optical frequency response on the dielectric functions of sol–gel derived CuCoOx thin film coatings: experimental and modelling.

View Publication
Scopus (37)
Crossref (38)
Scopus Clarivate Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Structures
Reliability analysis of deteriorated post-tensioned concrete bridges: The case study of Ynys-y-Gwas bridge in UK
...Show More Authors

Concrete structures are exposed to aggressive environmental conditions that lead to corrosion of the embedded reinforcement and pre-stressing steel. Consequently, the safety of concrete structures may be compromised, and this requires a significant budgets to repair and maintain critical infrastructure. Prediction of structural safety can lead to significant reductions in maintenance costs by maximizing the impact of investments. The aim of this paper is to establish a framework to assess the reliability of existing post-tensioned concrete bridges. A time-dependent reliability analysis of an existing post-tensioned involving the assessment of Ynys-y-Gwas bridge has been presented in this study. The main cause of failure of this bridge was c

... Show More
View Publication
Scopus (28)
Crossref (24)
Scopus Clarivate Crossref
Publication Date
Wed Sep 01 2021
Journal Name
Iop Conference Series: Earth And Environmental Science
Post Fire Residual Concrete and Steel Reinforcement Properties
...Show More Authors

he paper presents the results of exposure of normal concrete to high temperatures (400 and 700°C). In addition to the exposure of steel reinforcement bar Ø 12 mm, where two types of steel reinforcement burning situations were performed. Directly exposed to high temperatures (400 and 700°C) and others were covered by concrete layer (15 mm). From the experimental results of fire exposure for 1 hour of 400 and 700°C and gradually cooled, it was found that the residual average percentage of compressive strength of concrete was 85.3 and 41.4%, while the residual average percentage of modulus of elasticity of concrete was 75 and 48%, respectively. The residual average percentage of yielding tensile stress (Ø 12 mm) after burning and cooling

... Show More
View Publication Preview PDF
Scopus (5)
Crossref (4)
Scopus Crossref
Publication Date
Sat Oct 05 2019
Journal Name
Pediatric Cardiology
Personalised Warfarin Dosing in Children Post-cardiac Surgery
...Show More Authors
Abstract<p>Warfarin dosing is challenging due to a multitude of factors affecting its pharmacokinetics (PK) and pharmacodynamics (PD). A novel personalised dosing algorithm predicated on a warfarin PK/PD model and incorporating CYP2C9 and VKORC1 genotype information has been developed for children. The present prospective, observational study aimed to compare the model with conventional weight-based dosing. The study involved two groups of children post-cardiac surgery: Group 1 were warfarin naïve, in whom loading and maintenance doses were estimated using the model over a 6-month duration and compared to historical case-matched controls. Group 2 were already established on maintenance therapy a</p> ... Show More
View Publication
Scopus (11)
Crossref (8)
Scopus Clarivate Crossref
Publication Date
Mon Jan 01 2024
Journal Name
Journal Of Stomatology
The effect of Winter’s red line, angle of impaction, and radio-morphometric indices on surgical difficulty of impacted mandibular third molar: a prospective observational study
...Show More Authors

View Publication
Scopus Crossref
Publication Date
Thu Jan 30 2020
Journal Name
Al-kindy College Medical Journal
Role of Loop Ileostomy in the Management of Ulcerative Colitis Patients
...Show More Authors

Background: Ulcerative colitis is a chronic inflammatory condition characterized by relapsing and remitting episodes of inflammation limited to the mucosal layer of the colon.Loop ileostomy might be helpful in the management of the disease.

Objective: To evaluate the role of loop ileostomy in the management of ulcerative colitis.

 Methods: Between Januarys 2008 and January 2018, patients with fulminant ulcerative colitis resistant to medical therapy had been referred to our surgical unit and were included in our study. Assessment of the patients’ medical status (serum electrolytes, total serum protein, complete blood count, erythrocyte sedimentation rate, general stool exam,and abdominal ultrasound

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Mon Jul 19 2021
Journal Name
Surgical Neurology International
Efficacy of Gamma Knife radiosurgery in the management of pituitary prolactinoma
...Show More Authors
Background:

Gamma Knife radiosurgery (GKR) has been widely used in the management of a variety of intracranial tumors, including pituitary adenomas. Pituitary prolactinoma (Prs) is one of the most common types of these adenomas.

Methods:

This prospective study included 50 patients with pituitary Prs over a period from June 2017 to June 2018 at the Neurosciences Hospital, Baghdad/Iraq. The GKR procedure was performed using the Leksell Gamma Knife® Perfexion™, 192 beams of Cobalt 60 radiation were delivered through the intact skull to the pituitary Prs.

... Show More
View Publication
Scopus Crossref
Publication Date
Sat Jun 01 2019
Journal Name
The Iraqi Postgraduate Medical Journal
Results of Minimal Dosage Propranolol in the Management of Infantile Haemangioma
...Show More Authors

ABSTRACT: BACKGROUND: Infantile haemangioma one of the most common tumour of new borns , a safe and effective treatment options are under ongoing research . OBJECTIVE: The authors show the effectiveness and safety of low dose propranolol as a method for infantile haemangioma treatment . METHOD: In this study twenty- four patients with infantile haemangioma in different anatomical locations were treated with oral propranolol and the result were assessed in a retrospective analysis of the results patients were kept on 0.25 mg/kg/day for one month , then on 0.5mg/kg/day in 2 divided doses for another one month , in the third month the dose will be increased to 1 mg/kg/day in 2 divided doses , then the propranolol were given in a maintenance do

... Show More
Preview PDF
Publication Date
Fri Apr 01 2016
Journal Name
Journal Of Engineering
A Program Applying Professional Safety Basics in Construction Projects
...Show More Authors

When industrial and  constructional renaissance started in the world, the great interest was going on towards the equipment’s,  which was the first mean for production. After industry was settled the interest was going on towards the men ship which manpower on which the production depends. It was approved that it represents the basic part in all of the processes and the protection of those individuals against dangers of these equipment’s, industry and its accidents was the basic things which was studied in many researches until it crystallized in general principles for all industries and other take care in each industry.

     The professional safety is concerned as restrict which

... Show More
View Publication Preview PDF
Publication Date
Sat Oct 01 2016
Journal Name
Journal Of Theoretical And Applied Information Technology
Factors affecting global virtual teams’ performance in software projects
...Show More Authors

Scopus (23)
Scopus