Currently and under the COVID-19 which is considered as a kind of disaster or even any other natural or manmade disasters, this study was confirmed to be important especially when the society is proceeding to recover and reduce the risks of as possible as injuries. These disasters are leading somehow to paralyze the activities of society as what happened in the period of COVID-19, therefore, more efforts were to be focused for the management of disasters in different ways to reduce their risks such as working from distance or planning solutions digitally and send them to the source of control and hence how most countries overcame this stage of disaster (COVID-19) and collapse. Artificial intelligence should be used when there is no practical solution for a problem occurring in a projects starting from individual self-development ending to the adaptation to information technology sector with a continuous posting in this world of information industry where as metaphor “needs is a cause of creativity”. This study focuses on the use of artificial neural networks ANN to find a solution to issues in projects delays and furthermore when there is no physical or mathematical solution found so far. ANN’s were used to build a model that helps in finding a solution for delays in some selected projects in Baghdad (as case study), and discussing the strategies of rebuilding plus delays in time and cost due to delay factors. 35 construction projects were chosen in Baghdad greater area, vary in sizes and types. Crew and laborers were targeted in sampling collection methodology basically throughout questionnaire forms of field survey as they were filled by them. ANN’s helped in modelling delays factors to help decision makers in an appropriate management of projects. External factors which includes disasters mentioning COVID-19 as the most important disaster ever happened in the last decades, were the most important factor that caused delay in time and cost of projects implementation processes where this factor was controlling the other major factors such as contractor failure, redesigning, changing orders, security issues, low prices, besides weather issues and owner failure.
Background and Aim. Coronary artery disease (CAD) is a major risk factor for the progression to heart failure (HF), which is associated with an increase in left ventricular volume (LVV). This study aims to measure ventricular function and myocardial perfusion imaging markers of the left side of the heart, which can be performed with injection of a 99mTc at stress and rest by using single-photonemission-computed-tomography (SPECT). Subject and methods. The study included 121 patients with CAD, comprising 53 females and 68 males with ages between 25 to 88 years and 265 healthy subjects comprising 84 males and 181 females. All patients and healthy subjects volunteered to participate in this study. They were classified according to
... Show MoreThe largest use of x-ray in medical by dentists, employers or persons that needed by patients with specific conditions, lead to higher exposure of x-ray that may cause many diseases. In the present work radiography films have been used in evaluating the efficiency of using unsaturated polyester polymer reinforced with lead oxide (PbO) as shield material for medical x-ray devices, many parameters studied like concentration and thickness that they are increasing the attenuation of x-ray in them. The results show that the attenuation of X-ray increasing with concentration of reinforced material and with thickness, and the optical density decreases with increasing concentration from 0% to 50%, we chose 30% as suitable concentration to increase
... Show MoreSteel-concrete-steel (SCS) structural element solutions are rising due to their advantages over conventional reinforced concrete in terms of cost and strength. The impact of SCS sections with various core materials on the structural performance of composites has not yet been fully explored experimentally, and in this work, both slag and polypropylene fibers were incorporated in producing eco-friendly steel-concrete-steel composite sections. This study examined the ductility, ultimate strength, failure modes, and energy absorption capacities of steel-concrete-steel filled with eco-friendly concrete, enhanced by polypropylene fiber (PPF) to understand its impact on modern structural projects. Eco-friendly concrete was produced by the partial
... Show MorePurpose Heavy metals are toxic pollutants released into the environment as a result of different industrial activities. Biosorption of heavy metals from aqueous solutions is a new technology for the treatment of industrial wastewater. The aim of the present research is to highlight the basic biosorption theory to heavy metal removal. Materials and methods Heterogeneous cultures mostly dried anaerobic bacteria, yeast (fungi), and protozoa were used as low-cost material to remove metallic cations Pb(II), Cr(III), and Cd(II) from synthetic wastewater. Competitive biosorption of these metals was studied. Results The main biosorption mechanisms were complexation and physical adsorption onto natural active functional groups. It is observed that
... Show MoreA hybrid Gas-Enhanced and Downhole Water Sink-Assisted Gravity Drainage (GDWS-AGD) process has been suggested to enhance oil recovery by placing vertical injectors for CO2 at the top of the reservoir with a series of horizontal oil-producing and water-drainage wells located above and below the oil-water contact, respectively. The injected gas builds a gas cap that drives the oil to the (upper) oil-producing wells while the bottom water-drainage wells control water cresting. The hybrid process of GDWS-AGD process has been first developed and tested in vertical wells to minimize water cut in reservoirs with bottom water drive and strong water coning tendencies. The wells were dual-compl