generator the metal conductor is replaced by conducting gas plasma.
In this work semi–empirical method (PM3) calculations are carried out by (MOPAC) computational packages have been employed to calculate the molecular orbital's energies for some organic pollutants. The long– chain quaternary ammonium cations called Iraqi Clays (Bentonite – modified) are used to remove these organic pollutants from water, by adding a small cationic surfactant so as to result in floes which are agglomerates of organobentonite to remove organic pollutants. This calculation which suggests the best surface active material, can be used to modify the adsorption efficiency of aniline , phenol, phenol deriviatives, Tri methyl glycine, ester and pecticides , on Iraqi Clay (bentonite) by comparing the theoretical results w
... Show MoreThe interaction between comet Hale-Bopp tail with the solar wind is investigated in the present paper using magneto-hydrodynamic (MHD) numerical simulation, which accounts for the presence of the interplanetary magnetic field (IMF). The simulation is based on three-dimensional Lax-Wendroff explicit scheme, providing second-order accuracy in space and time. The ions produced from the nucleus of the comet will add considerable effects on the microstructure of the solar wind, thus severely altering its physical properties. The present simulation focuses on careful analysis of these properties by means of simulating the behavior of the comet Hale-Bopp’s tail at 1 AU from the sun. These properties include the changes of the plasma density,
... Show MoreA particular solution of the two and three dimensional unsteady state thermal or mass diffusion equation is obtained by introducing a combination of variables of the form,
η = (x+y) / √ct , and η = (x+y+z) / √ct, for two and three dimensional equations
respectively. And the corresponding solutions are,
θ (t,x,y) = θ0 erfc (x+y)/√8ct and θ( t,x,y,z) =θ0 erfc (x+y+z/√12ct)
A linear engine generator with a compact double-acting free piston mechanism allows for full integration of the combustion engine and generator, which provides an alternative chemical-to-electrical energy converter with a higher volumetric power density for the electrification of automobiles, trains, and ships. This paper aims to analyse the performance of the integrated engine with alternative permanent magnet linear tubular electrical machine topologies using a coupled dynamic model in Siemens Simcenter software. Two types of alternative generator configurations are compared, namely long translator-short stator and short translator-long stator linear machines. The dynamic models of the linear engine and linear generator, validated
... Show MoreThe large number of failure in electrical power plant leads to the sudden stopping of work. In some cases, the necessary reserve materials are not available for maintenance which leads to interrupt of power generation in the electrical power plant unit. The present study, deals with the determination of availability aspects of generator in unit 5 of Al-Dourra electric power plant. In order to evaluate this generator's availability performance, a wide range of studies have been conducted to gather accurate information at the level of detail considered suitable to achieve the availability analysis aim. The Weibull Distribution is used to perform the reliability analysis via Minitab 17, and Artificial Neural Networks (ANNs) by approaching o
... Show MoreAbstract We have been studied and analysis the electronic current at the interfaces of Au/PTCDA system according to simple quantum mode for the electronics transition rate due to postulate quantum theory. Calculation of electronic current were performed at interface of Au/PTCDA as well as for investigation the feature of electronic density at this devices. The transition of electronic current study under assume the electronic state of Au and PTCDA were continuum and the states of electrons must be closed to energy level for Au at Fermi state, and the potential at interface feature depended on structure of Au and PTCDA material. The electronic transition current feature was dependent on the driving force energy that results of absorption ene
... Show MoreThis paper describes a microcontroller-based function generator system. By the function generator sine wave, square wave, quasi-square wave, saw-tooth and triangular waveforms are generated over a wide frequency range according to user requirements. By utilizing processing capabilities of the microcontroller the hardware is minimized exceedingly. The output waveform shapes are digitally-controlled to achieve the required wave shape. The single chip microcomputer of waveform generation equipment offers the possibility of improvements in manufacture reliability, maintenance and servicing and increased control flexibility. The system is built and tested. The results of test were satisfactory and appreciated by test engineers at different ce
... Show MoreThis paper presents a study for the influence of magnetohydrodynamic (MHD) on the oscillating flows of fractional Burgers’ fluid. The fractional calculus approach in the constitutive relationship model is introduced and a fractional Burgers’ model is built. The exact solution of the oscillating motions of a fractional Burgers’ fluid due to cosine and sine oscillations of an infinite flat plate are established with the help of integral transforms (Fourier sine and Laplace transforms). The expressions for the velocity field and the resulting shear stress that have been obtained, presented under integral and series form in terms of the generalized Mittag-Leffler function, satisfy all imposed initial and boundary conditions. Finall
... Show MoreOne of the most important problems of Iraqi construction projects is the cost variances, so it is important to identify the problems and shortcomings that cause poor cost control. Through the utilization of questionnaires, the study evaluated how project costs were managed and reported. The questionnaire was distributed to 180 professionals working in the Iraqi construction sector, with a response rate of 91%. The results showed that a high percentage of projects are implemented with a difference between real and estimated costs, and the process of documenting cost data needs to be more secure. On the other hand, there is a weakness in providing the necessary work structure information to monitor costs and a lack of proc
... Show More