Orbital Rhabdomyosarcoma: Comprehensive Review of Epidemiology, Clinical Staging, and Treatment Outcomes
...Show More Authors
In this paper, a literature survey was introduced to study of enhancing the hazy images , because most of the images captured in outdoor images have low contrast, color distortion, and limited visual because the weather conditions such as haze and that leads to decrease the quality of images capture. This study is of great importance in many applications such as surveillance, detection, remote sensing, aerial image, recognition, radar, etc. The published researches on haze removal are divided into several divisions, some of which depend on enhancement the image, some of which depend on the physical model of deformation, and some of them depend on the number of images used and are divided into single-image and multiple images dehazing model
... Show MoreBackground: Multiple sclerosis (MS) is an inflammatory disease of the central nervous system, in which the myelin sheaths got injured. The prevalence of MS is on grow, as well as, it affects the young ages. Females are most common to have MS compared to males. Oxidative stress is the situation of imbalance between oxidants (free radicals and reactive oxygen species (ROS)) and antioxidants in a living system, in which either the oxidants are elevated or antioxidants are reduced, or sometimes both. ROS and oxidative stress have been implicated in the progression of many degenerative diseases, which is important in cracking the unrevealed mysteries of MS. In this review article, some of the proposed mechanisms that link oxidative stres
... Show Moreحضيت القيادة باهتمام كبير من قبل الباحثين ودورها الإيجابي في التأثير على الموظفين ونجاح المنظمات، في الآونة الأخير بدأت الدراسات تركز على الجانب المظلم للقيادة وتأثيرها على التابعين وبيئة العمل، وقد تم تحديد القيادة السامة بأنها أخطر الأساليب القيادية التي تتسبب بتكاليف مادية ومعنوية على المنظمات بمختلف جوانبها، ان القيادة السامة تأثر على دوافع المرؤوسين وقدرتهم على انجاز المهام، ورغبتهم في الاستمرار في
... Show MoreConstruction projects are characterized as projects with multi phases and activities, complex, unique, and have many different parties and stakeholders. Risks could appear at one or more of the construction project stages and may affect the achievement of project objectives. Therefore, one of the key elements in the planning phase of any project is the risk management process (RMP). This study attempts to understand the terminology of risk in general, risk management, and response to risk in particular. This study is mainly a review of thirty-eight studies that have been published between 1997 and 2020 that demonstrate the importance of the crucial phase of risk response from the risk management process and its impact on
... Show MoreThe seizure epilepsy is risky because it happens randomly and leads to death in some cases. The standard epileptic seizures monitoring system involves video/EEG (electro-encephalography), which bothers the patient, as EEG electrodes are attached to the patient’s head.
Seriously, helping or alerting the patient before the seizure is one of the issue that attracts the researchers and designers attention. So that there are spectrums of portable seizure detection systems available in markets which are based on non-EEG signal.
The aim of this article is to provide a literature survey for the latest articles that cover many issues in the field of designing portable real-time seizure detection that includes the use of multiple
... Show MoreGenetic algorithms (GA) are a helpful instrument for planning and controlling the activities of a project. It is based on the technique of survival of the fittest and natural selection. GA has been used in different sectors of construction and building however that is rarely documented. This research aimed to examine the utilisation of genetic algorithms in construction project management. For this purpose, the research focused on the benefits and challenges of genetic algorithms, and the extent to which genetic algorithms is utilised in construction project management. Results showed that GA provides an ability of generating near optimal solutions which can be adopted to reduce complexity in project management and resolve difficult problem
... Show MoreWorldwide, enormous amounts of waste cause major environmental issues, including scrap tires and plastic, and large waste, a consequence of the demolition of buildings, including crushed concrete, crushed clay bricks, and crushed thermo-stone. From that point, it’s possible to consider that the recycling processes for these materials and using them in the manufacturing field will reduce the adverse effects on the environment of these wastes and the consumption of natural resources. Sustainable concrete blocks can be considered as one of the products produced by using these materials as partial volume replacement of the coarse, fine aggregate, or cement content, considering their dry density, workability, absorption, compressive st
... Show More