Concrete structures are exposed to aggressive environmental conditions that lead to corrosion of the embedded reinforcement and pre-stressing steel. Consequently, the safety of concrete structures may be compromised, and this requires a significant budgets to repair and maintain critical infrastructure. Prediction of structural safety can lead to significant reductions in maintenance costs by maximizing the impact of investments. The aim of this paper is to establish a framework to assess the reliability of existing post-tensioned concrete bridges. A time-dependent reliability analysis of an existing post-tensioned involving the assessment of Ynys-y-Gwas bridge has been presented in this study. The main cause of failure of this bridge was corrosion of tendons, making it a relevant case study to evaluate the effect of corrosion on bridge safety. Uncertainties associated with material properties, geometry, loads and corrosion parameters are taken into account. The probabilistic models of the uncertainties are combined with a non-linear finite element analysis to study the effect of tendons pitting corrosion on the post-tensioned concrete bridge. The limit state function considered is flexural strength. The Monte-Carlo simulation (MCS) method is used to compute the statistical parameters of the resisting bending moment through a MATLAB code running ABAQUS. It was found that the reliability index for the first year of bridge service life is below the minimum value acceptable for structures. The study confirmed that this bridge was a high risk structure due to its design and location. The proposed framework can be used by engineers and researchers as a tool to support decision for segmental post-tensioned (PT) bridges maintenance since they need for a regular inspection due to their risk to corrosion.
The aim of this research is to identify the level of health services provided in the health centers operating in the family medicine system in Baghdad, and to determine the extent to which these health centers are applied to the internationally recognized standards , "Defining the quality of service gap between health care centers operating in the family medicine system and the standards adopted by the corresponding international centers (Al-Shabab Model Family Medicine Center, Al-Jahad Family Health Center, Al-Adhamiya Family Health Center, Al-Zawiya Family Health Center), and in view of what our health institutions are facing. The family of primary health care centers has difficulties, obstacles and challenges such as the diffi
... Show MoreThe m-consecutive-k-out-of-n: F linear and circular system consists of n sequentially connected components; the components are ordered on a line or a circle; it fails if there are at least m non-overlapping runs of consecutive-k failed components. This paper proposes the reliability and failure probability functions for both linearly and circularly m-consecutive-k-out-of-n: F systems. More precisely, the failure states of the system components are separated into two collections (the working and the failure collections); where each one is defined as a collection of finite mutual disjoint classes of the system states. Illustrative example is provided.
To decrease the impact on the environment of building waste, the recycled aggregate may be used in various sustainable engineering applications, such as roller compacted concrete pavement (RCCP). This research examined how using recycled aggregate as a partial replacement for natural aggregate as coarse or fine affected the mechanical properties of roller-compacted concrete pavement. The recycled aggregate was crushed and sieved to coarse and fine aggregate before being used in the roller-compacted concrete pavement. Compressive strength, splitting tensile strength, and flexural strength were all evaluated after the samples were prepared at 28 and 90 days of curing. According to the study's findings, the partial replacem
... Show MoreKE Sharquie, GA Ibrahim, AA Noaimi, HK Hamudy, J Saudi Soc Dermatol Dermatol Surg, 2010 - Cited by 2
Abstract A descriptive (retrospective) (a case-control) study was carried out at Al-Karama Teaching Hospital, Baghdad Teaching Hospital and Surgical Specialties Hospital, and Gastro-Intestinal Tract and Liver (GIT) Hospital for the period of December 1st, 2001 To March 15th 2002. To identify aspects of life-style that may contribute to the occurrence of peptic ulcer (P.U)as risk factors. And to find out the relationship between the demographic characteristic of the group. Non-probability (Purposive) sample of (100) cases who were admitted to the endoscopy department who were later on diagnosed as having
Research aims to develop a novel technique for segmental beam fabrication using plain concrete blocks and externally bonded Carbon Fiber Reinforced Polymers Laminates (CFRP) as a main flexural reinforcement. Six beams designed an experimentally tested under two-point loadings. Several parameters included in the fabrication of segmental beam studied such as; bonding length of carbon fiber reinforced polymers, the surface-to-surface condition of concrete segments, interface condition of the bonding surface, and thickness of epoxy resin layers. Test results of the segmental beams specimens compared with that gained from testing reinforced concrete beam have similar dimensions for validations. The results show the effectiven
... Show MoreWarfarin dosing is challenging due to a multitude of factors affecting its pharmacokinetics (PK) and pharmacodynamics (PD). A novel personalised dosing algorithm predicated on a warfarin PK/PD model and incorporating CYP2C9 and VKORC1 genotype information has been developed for children. The present prospective, observational study aimed to compare the model with conventional weight-based dosing. The study involved two groups of children post-cardiac surgery: Group 1 were warfarin naïve, in whom loading and maintenance doses were estimated using the model over a 6-month duration and compared to historical case-matched controls. Group 2 were already established on maintenance therapy a
The purpose of this study is to avoid delays and cost changes that occur in emergency reconstruction projects especially in post disaster circumstances. This study is aimed to identify the factors that affect the real construction period and the real cost of a project against the estimated period of construction and the estimated cost of the project. The case study is related to the construction projects in Iraq. Thirty projects in different areas of construction in Iraq were selected as a sample for this study. Project participants from the projects authorities provided data about the projects through a data collection distributed survey made by the authors. Mathematical data analysis was used to construct a model to predict change
... Show More