Dam operation and management have become more complex recently because of the need for considering hydraulic structure sustainability and environmental protect on. An Earthfill dam that includes a powerhouse system is considered as a significant multipurpose hydraulic structure. Understanding the effects of running hydropower plant turbines on the dam body is one of the major safety concerns for earthfill dams. In this research, dynamic analysis of earthfill dam, integrated with a hydropower plant system containing six vertical Kaplan turbines (i.e., Haditha dam), is investigated. In the first stage of the study, ANSYS-CFX was used to represent one vertical Kaplan turbine unit by designing a three-dimensional (3-D) finite element (FE) model. This model was used to differentiate between the effect of turbine units’ operation on dam stability in accordance to maximum and minimum reservoir upstream water levels, and the varying flowrates in a fully open gate condition. In the second stage of the analysis, an ANSYS-static modeling approach was used to develop a 3-D FE earthfill dam model. The water pressure pattern determined on the boundary of the running turbine model is transformed into the pressure at the common area of the dam body with turbines. The model is inspected for maximum and minimum upstream water levels. Findings indicate that the water stress fluctuations on the dam body are proportional to the inverse distance from the turbine region. Also, it was found that the cone and outlet of the hydropower turbine system are the most affected regions when turbine is running. Based on the attained results, a systematic operation program was proposed in order to control the running hydropower plant with minimized principal stress at selected nodes on the dam model and the six turbines.
Objective: To determine the effectiveness of a dietary educational program upon the hypertensive client’s
information.
Methodology: The sample of the study consists of (60) hypertensive clients who attended Al Anbar Health Office –Al
Andalus Health Center during the period of the study from the14th of March 2010 to the 30th of September 2010. The
sample is divided into two groups; study group (30) hypertensive clients who received dietary educational program
and control group (30) hypertensive clients who received a routine care from the center. Three major instruments
were used; these instruments included (1) knowledge test which was applied on both groups pretest and eight weeks
post-test (2) questions to know
The idea of carrying out research on incomplete data came from the circumstances of our dear country and the horrors of war, which resulted in the missing of many important data and in all aspects of economic, natural, health, scientific life, etc.,. The reasons for the missing are different, including what is outside the will of the concerned or be the will of the concerned, which is planned for that because of the cost or risk or because of the lack of possibilities for inspection. The missing data in this study were processed using Principal Component Analysis and self-organizing map methods using simulation. The variables of child health and variables affecting children's health were taken into account: breastfeed
... Show MoreRainwater harvesting could be a possible solution to decrease the consequences of water scarcity and energy deficiency in Iraq and the Kurdistan Region of Iraq (KRI). This study aims to calculate the water and energy (electricity) saved by rainwater harvesting for rooftops and green areas in Sulaimani city, KR, Iraq. Various data were acquired from different formal entities in Sulaimani city. Moreover, Google Earth and ArcMap 10.4 software were used for digitizing and calculating the total rooftop and green areas. The results showed that for the used runoff coefficients (0.8 and 0.95), the harvested rainwater volumes were 2901563 and 12197131 m³ during the study period (2005 – 2006) and (2019-2020). Moreover, by compa
... Show MoreThe research has designed for studying the relationship between manufacturing strategy and its flexibility under the flexible manufacturing system with their reflection on the competitive environmental performance of the firm. To interpret and tackle the problem, a hypothesis has formulated stating that “ the competitive performance of a firm is interpreted by the manufacturing strategy and flexibility which are derived from the firm and its business strategies under the flexible manufacturing system”. Related literatures with their theoretical dissertations, which enhanced the thoughtful content, have analyzed. An illustrative case study on the flexible manufacturing system at Toyota Motors Corporation working at the g
... Show MoreThis study examines the causes of time delays and cost overruns in a selection of thirty post-disaster reconstruction projects in Iraq. Although delay factors have been studied in many countries and contexts, little data exists from countries under the conditions characterizing Iraq during the last 10-15 years. A case study approach was used, with thirty construction projects of different types and sizes selected from the Baghdad region. Project data was gathered from a survey which was used to build statistical relationships between time and cost delay ratios and delay factors in post disaster projects. The most important delay factors identified were contractor failure, redesigning of designs/plans and change orders, security is
... Show More