Building a geological model is an essential and primary step for studying the reservoir’s hydrocarbon content and future performance. A three-dimensional geological model of the Asmari reservoir in Abu- Ghirab oil field including structure, stratigraphy, and reservoir petrophysical properties, has been constructed in the present work. As to underlying Formations, striking slip faults developed at the flank and interlayer normal. Abu Ghirab oilfields are located on the eastern anticlinal band, which has steadily plunged southward. 3D seismic interpretation results are utilized to build the fault model for 43 faults of the Asmari Formation in Abu Ghirab Oilfield. A geographic facies model with six different rock facies types are developed. This new modelling system should be capable of more clearly reflecting the connectivity of the oil body and the heterogeneity of the reservoir. To represent the vertical and horizontal heterogeneity and create a framework for the Asmari reservoir in the Abu Ghirab oil field, the Petrel software has been used to create a reservoir in a 3D model. This model was constructed using data from 55 wells located across the Asmari formation. The model demonstrates accurate estimations (porosity, saturation, and net to gross). These reservoir models directly impact the facies model’s computation of each layer of the net pay thickness of the reservoir. The final goal of the present work is to determine the initial oil in place (IOIP), which is found to be 269*106 sm3.
The purpose of this article is to introduce reverse engineering procedure (REP). It can achieved by developing an industrial mechanical product that had no design schemes throughout the 3D-Scanners. The aim of getting a geometric CAD model from 3D scanner is to present physical model. Generally, this used in specific applications, like commercial plan and manufacturing tasks. Having a digital data as stereolithography (STL) format. Converting the point cloud be can developed as a work in programming by producing triangles between focuses, a procedure known as triangulation. Then it could be easy to manufacture parts unknown documentation and transferred the information to CNC-machines. In this work, modification was proposed and used in RE
... Show MoreKnowledge of permeability, which is the ability of rocks to transmit the fluid, is important for understanding the flow mechanisms in oil and gas reservoirs.
Permeability is best measured in the laboratory on cored rock taken from the reservoir. Coring is expensive and time-consuming in comparison to the electronic survey techniques most commonly used to gain information about permeability.
Yamama formation was chosen, to predict the permeability by using FZI method. Yamama Formation is the main lower cretaceous carbonate reservoir in southern of Iraq. This formation is made up mainly of limestone. Yamama formation was deposited on a gradually rising basin floor. The digenesis of Yamama sediments is very important due to its direct
Praise be to God, prayer and peace be upon the Messenger of Allah and after:
The science of interpretation is related to the book of God Almighty; it is considered one of the most honorable sciences. It started with a long time ago. In the early days of Islam, the area of the Islamic state expanded. The people entered the religion of Allah in groups. In the language, and people do not know more than the meanings of the Koran was the need to write in this scie234nce is strong, and perhaps the first of the thousand in the (meanings of the Koran) Abu Ubaida in his book (metaphor of the Koran), Abu Ubaida was affected by his specialization in Arabic science, Prominent on his book.
The second section wa
... Show More
Building Information Modeling (BIM) is becoming a great known established collaboration process in Architecture, Engineering, and Construction (AEC) industry. In various cases in many countries, potential benefits and competitive advantages have been reported. However, despite the potentials and benefits of BIM technologies, it is not applied in the construction sector in Iraq just like many other countries of the world. The purpose of this research is to understand the uses and benefits of BIM for construction projects in Iraq. This purpose has been done by establishing a fr |
In the present study, radon gas concentration in the shallow groundwater samples of the Abu-Jir region in Anbar governorate was measured by using Rad-7 detector. The highest radon gas level in the samples is up to 9.3 Bq/L, while the lowest level is 2.1 Bq/L, with an average of 6.44±1.8 Bq/L. The annual effective dose is varied from 33.945 μSv/y to 7.66 μSv/y, with an average of 0.145±0.06 μSv/y. Consequently, the radon level in the groundwater studied is lower than the standard recommended value (11 Bq/L) reported by the United States Environmental Protection Agency (USEPA). The potential source of radon is uranium-rich hydrocarbons that are leakage to the surface along the Abu-Jir Fault. This research did not indicate any ris
... Show MoreBackground: The skull offers a high resistance of adverse environmental conditions over time, resulting in the greater stability of the dimorphic features as compared to other skeletal bony pieces. Sex determination of human skeletal considered an initial step in its identification. The present study is undertaken to evaluate the validity of 3D reconstructed computed tomographic images in sex differentiation by using craniometrical measurements at various parts of the skull. Materials and Method: 3D reconstructed computed tomographic scanning of 100 Iraqi subject, (50 males and 50 females) were analyzed with their age range from20-70 years old. Craniometrical linear measurements were located and marked on both side of the 3D skull images.
... Show MoreThe main parameter that drives oil industry contract investment and set up economic feasibility study for approving field development plan is hydrocarbon reservoir potential. So a qualified experience should be deeply afforded to correctly evaluate hydrocarbons reserve by applying different techniques at each phase of field management, through collecting and using valid and representative data sources, starting from exploration phase and tune-up by development phase. Commonly, volumetric calculation is the main technique for estimate reservoir potential using available information at exploration stage which is quite few data; in most cases, this technique estimate big figure of reserve. In this study
This study included the extraction properties of spatial and morphological basins studied using the Soil and Water Assessment Tool (SWAT) model linked to (GIS) to find the amount of sediment and rates of flow that flows into the Haditha reservoir . The aim of this study is determine the amount of sediment coming from the valleys and flowing into the Haditha Dam reservoir for 25 years ago for the period (1985-2010) and its impact on design lifetime of the Haditha Dam reservoir and to determine the best ways to reduce the sediment transport. The result indicated that total amount of sediment coming from all valleys about (2.56 * 106 ton). The maximum annual total sediment load was about (488.22 * 103 ton) in year 1988
... Show More