Preferred Language
Articles
/
LRbNT4cBVTCNdQwCaUSu
Development of Excess Pore Water Pressure around Piles Excited by Pure Vertical Vibration
...Show More Authors

Scopus Clarivate Crossref
View Publication
Publication Date
Thu May 31 2012
Journal Name
Al-khwarizmi Engineering Journal
The Stability Conditions of the Pump Structure Vibration
...Show More Authors

 The general approach of this research is to assume that the small nonlinearity can be separated from the linear part of the equation of motion. The effect of the dynamic fluid force on the pump structure system is considered vibrates at its natural frequency but the amplitude is determined by the initial conditions. If the motion of the system tends to increase the energy of the pump structure system, the vibration amplitude will increase and the pump structure system is considered to be unstable. A suitable MATLAB program was used to predict the stability conditions of the pump structure vibration. The present research focuses on fluid pump problems, namely, the role played by damping coefficient C, damping factor

... Show More
View Publication Preview PDF
Publication Date
Fri Feb 01 2019
Journal Name
Journal Of Physics: Conference Series
Vibration Properties of ZnS nanostructure Wurtzoids: ADFT Study
...Show More Authors

View Publication
Scopus (11)
Crossref (7)
Scopus Clarivate Crossref
Publication Date
Tue Sep 01 2009
Journal Name
Al-khwarizmi Engineering Journal
Removal of Sulfate from Waste Water by Activated Carbon
...Show More Authors

Activated carbon was Produced from coconut shell and was used for removing sulfate from industrial waste water in batch Processes. The influence of various parameter were studied such as pH (4.5 – 9.) , agitation time (0 – 120)min and adsorbent dose (2 – 10) gm.

The Langmuir and frandlich adsorption capacity models were been investigated where showed there are fitting with langmmuir model with squre regression value ( 0.76). The percent of removal of  sulfate (22% - 38%) at (PH=7) in the isotherm experiment increased  with adsorbent mass increasing. The maximum removal value of sulfate at  different pH experiments is (43%) at pH=7.

View Publication Preview PDF
Publication Date
Mon Jun 30 2003
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Water Treatment of Cooling Towers Blowdown by Ion Exchange
...Show More Authors

View Publication Preview PDF
Publication Date
Mon Feb 01 2021
Journal Name
Iop Conference Series: Materials Science And Engineering
Separation of oil/water emulsions by microbubble air flotation
...Show More Authors
Abstract<p>Oil/water emulsions are one of the major threats to environment nowadays, occurs at many stages in the production and treatment of crude oil. The oil recovery process adopted will depend on how the oil is present in the water stream. Oil can be found as free oil, as an unstable oil/water emulsion and also as a highly stable oil/water emulsion. The current study was dedicated to the application of microbubble air flotation process for the removal of such oily emulsions for its characters of cost-effective, simple structure, high efficiency and no secondary pollution. The influence of several key parameters on the process removal efficiency was examined, namely, initial oil concentration, pH value of t</p> ... Show More
View Publication
Crossref (19)
Crossref
Publication Date
Mon Apr 17 2023
Journal Name
Day 2 Tue, April 18, 2023
Development of a Multi-Completion Gas and Downhole Water Sink-Assisted Gravity Drainage (MC-DWS-AGD) to Improve Oil Recovery and Reduce Water Cut in Reservoirs with Strong Water Aquifers
...Show More Authors
Abstract<p>Gas and downhole water sink assisted gravity drainage (GDWS-AGD) is a promising gas-based enhanced oil recovery (EOR) process applicable for reservoirs associated with infinite aquifers. However, it can be costly to implement because it typically involves the drilling of multiple vertical gas-injection wells. The drilling and well-completion costs can be substantially reduced by using additional completions for gas injection in the oil production wells through the annulus positioned at the top of the reservoir. Multi-completion-GDWS-AGD (MC-GDWS-AGD) can be configured to include separate completions for gas injection, oil, and water production in individual wells. This study simulates</p> ... Show More
View Publication
Crossref (3)
Crossref
Publication Date
Mon Sep 30 2019
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Development of East Baghdad Oil Field By Clusters of Horizontal Wells
...Show More Authors

There are varieties of reasons lead for drilling horizontal wells rather than verticals. Increasing the recovery of oil, especially from thin or tight reservoir permeability is the most important parameter.

East Baghdad oil field considered as a giant field with approximately more than 1billion barrel of a proved reserves accompanying recently to low production rate problems in many of the existing wells.

   It is important to say that presence of of  horizontal wells in East Baghdad field especially by converting some of already drilled wells by re-entry drilling horizontal sections may provide one of best solutions for the primary development stage in East Baghdad field which may be followed by drilling n

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Mon Sep 30 2019
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Development of East Baghdad Oil Field By Clusters of Horizontal Wells
...Show More Authors

There are varieties of reasons lead for drilling horizontal wells rather than verticals. Increasing the recovery of oil, especially from thin or tight reservoir permeability is the most important parameter. East Baghdad oil field considered as a giant field with approximately more than 1billion barrel of a proved reserves accompanying recently to low production rate problems in many of the existing wells.    It is important to say that presence of of  horizontal wells in East Baghdad field especially by converting some of already drilled wells by re-entry drilling horizontal sections may provide one of best solutions for the primary development stage in East Baghdad field which may be followed by drilling new horizont

... Show More
Crossref (3)
Crossref
Publication Date
Tue Mar 01 2022
Journal Name
Journal Of Osseointegration & Oral Rehablitation
Evaluation of marginal bone loss around SLActive implants by CBCT using different implant dimensions and surgical approaches: A clinical and radiological prospective study
...Show More Authors

Aim: The reduction in the amount of marginal bone is the most important demand for the long term success of dental implants. This prospective clinical study was aimed to investigate the marginal bone loss of early loaded SLActive implants with different dimensions and surgical approaches. Materials and methods Fifteen patients aged from 18 to 60 years were divided into 2 groups (flapped and flapless approach) that underwent delayed implant placement protocol with SLActive implants. The marginal bone level was estimated by cone-beam computed tomography during three different periods: preoperatively, 8 weeks after surgery and 24 weeks after loading of the prosthesis. Results: The mean value of marginal bone level was not significantly chan

... Show More
View Publication Preview PDF
Scopus (6)
Scopus
Publication Date
Mon Oct 01 2012
Journal Name
Journal Of Engineering
Prediction of Smear Effect on the Bearing Capacity of Driven Piles
...Show More Authors

This paper deals with prediction the effect of soil re-moulding (smear) on the ultimate bearing capacity of driven piles. The proposed method based on detecting the decrease in ultimate bearing capacity of the pile shaft (excluding the share of pile tip) after sliding downward. This was done via conducting an experimental study on three installed R.C piles in a sandy clayey silt soil. The piles were installed so that a gap space is left between its tip and the base of borehole. The piles were tested for ultimate bearing capacity according to ASTM D1143 in three stages. Between each two stages the pile was jacked inside the borehole until a sliding of about 200mm is achieved to simulate the soil re-moulding due to actual pile driving. The re

... Show More