Find interested in the harmonization of variables and determinants of supply chain planning needs of the material, leading to the results start effective supply chain management, and end up quickly modify the sizes to suit the demand and turnover in the market. As well as identifying relationships between variables, and type of relationship used by the company with the processors and their feasibility, and indicate the level of interest and willingness to redesign the supply chain Company for Electrical Industries and build an integrated model for supply chain with the MRP system can be applied in the company.
Research depend on quantitative and descriptive method, It
... Show MoreA hybrid Gas-Enhanced and Downhole Water Sink-Assisted Gravity Drainage (GDWS-AGD) process has been suggested to enhance oil recovery by placing vertical injectors for CO2 at the top of the reservoir with a series of horizontal oil-producing and water-drainage wells located above and below the oil-water contact, respectively. The injected gas builds a gas cap that drives the oil to the (upper) oil-producing wells while the bottom water-drainage wells control water cresting. The hybrid process of GDWS-AGD process has been first developed and tested in vertical wells to minimize water cut in reservoirs with bottom water drive and strong water coning tendencies. The wells were dual-compl
Mature oil reservoirs surrounded with strong edge and bottom water drive aquifers experience pressure depletion and water coning/cresting. This laboratory research investigated the effects of bottom water drive and gas breakthrough on immiscible CO2-Assisted Gravity Drainage (CO2-AGD), focusing on substantial bottom water drive. The CO2-AGD method vertically separates the injected CO2 to formulate a gas cap and Oil. Visual experimental evaluation of CO2-AGD process performance was performed using a Hele-Shaw model. Water-wet sand was used for the experiments. The gas used for injection was pure CO2, and the “oleic” phase was n-decane with a negative spreading coefficient. The aqueous phase was deionized water. To evaluate the feasibilit
... Show MoreA low speed open circuit wind tunnel has been designed, manufactured and constructed at the
Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of
the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the
first part of the work; that is the design calculations, simulation and construction. It will be followed by a
second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test
section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70
m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow
distu
A low speed open circuit wind tunnel has been designed, manufactured and constructed at the Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the first part of the work; that is the design calculations, simulation and construction. It will be followed by a second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70 m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow disturbances in the test section.
... Show MoreA low speed open circuit wind tunnel has been designed, manufactured and constructed at theMechanical Engineering Department at Baghdad University - College of Engineering. The work is one ofthe pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes thefirst part of the work; that is the design calculations, simulation and construction. It will be followed by asecond part that describes testing and calibration of the tunnel. The proposed wind tunnel has a testsection with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flowdisturbances in the test sec
... Show MorePatient safety is the main issue in health care organization, the Agency for Healthcare Research and Quality defines it as, “freedom from accidental or preventable injuries produced by medical care. Thus, practices or interventions that improve patient safety are those that reduce the occurrence of preventable adverse events”. The purpose of this study was to evaluate Iraqi pharmacist perception about the culture of patient safety. As well as estimate whether safety is a principal issue in their pharmaceutical practice this study was carried out on 435 pharmacists who are working in community pharmacies in various Iraqi provinces. A survey was distributed via the internet during the period from May to June 2020. A community pharmacy
... Show MoreBackground Many countries recommend the use of long-acting reversible contraceptive intrauterine device immediately after cesarean delivery. The cesarean delivery rate in Iraqi public hospitals is 32.2% and may reach 85.8% in private hospitals. Immediate post-partum intrauterine device insertion at cesarean is rarely done in Iraq. Objectives To assess the safety and practicality of immediate post-partum intrauterine device insertion during cesarean delivery for family planning and pregnancy spacing in Iraqi women. Subjects and Methods A single arm clinical trial included 150 eligible women who attended Al-Elwiyah Maternity Teaching Hospital or Al Hayat Rahibat Hospital for term delivery. A copper intrauterine device was placed in the ute
... Show More