Preferred Language
Articles
/
LBdoZ5IBVTCNdQwCLK_5
Practically Robust Fixed-Time Convergent Sliding Mode Control for Underactuated Aerial Flexible JointRobots Manipulators
...Show More Authors

The control of an aerial flexible joint robot (FJR) manipulator system with underactuation is a difficult task due to unavoidable factors, including, coupling, underactuation, nonlinearities, unmodeled uncertainties, and unpredictable external disturbances. To mitigate those issues, a new robust fixed-time sliding mode control (FxTSMC) is proposed by using a fixed-time sliding mode observer (FxTSMO) for the trajectory tracking problem of the FJR attached to the drones system. First, the underactuated FJR is comprehensively modeled and converted to a canonical model by employing two state transformations for ease of the control design. Then, based on the availability of the measured states, a cascaded FxTSMO (CFxTSMO) is constructed to estimate the unmeasurable variables and lumped disturbances simultaneously in fixed-time, and to effectively reduce the estimation noise. Finally, the FxTSMC scheme for a high-order underactuated FJR system is designed to guarantee that the system tracking error approaches to zero within a fixed-time that is independent of the initial conditions. The fixed-time stability of the closed-loop system of the FJR dynamics is mathematically proven by the Lyapunov theorem. Simulation investigations and hardware tests are performed to demonstrate the efficiency of the proposed controller scheme. Furthermore, the control technique developed in this research could be implemented to the various underactuated mechanical systems (UMSs), like drones, in a promising way.

Scopus Clarivate Crossref
View Publication
Publication Date
Sat Jul 19 2025
Journal Name
Annals Of Applied Sport Science
A Comparative Study of the Average Motor Response Time for the Arms and Legs of Handball, Basketball, and Volleyball Players Aged 14-16 Years
...Show More Authors

Background. The motor response is a fundamental ability that is evident during any physical or motor activity. However, the need for this ability varies from one sport to another and depends on the specific skills required in each sport. Objectives. This study aims to compare the average motor reaction times of the arm and leg among handball, basketball, and volleyball players aged 14 to 16 years. Methods. The sample included 30 players aged 14-16 years from the sports talent care center, evenly distributed on handball, basketball, and volleyball. Standardized tests were used to measure the speed of motor response, including the Batak Micro test for hands, which records the number of responses to light stimuli in 30 seconds, and the Saqer t

... Show More
View Publication Preview PDF
Publication Date
Fri Apr 01 2016
Journal Name
Communications In Nonlinear Science And Numerical Simulation
Simultaneous determination of time and space-dependent coefficients in a parabolic equation
...Show More Authors

View Publication
Scopus (22)
Crossref (11)
Scopus Clarivate Crossref
Publication Date
Sun Sep 01 2013
Journal Name
Journal Of Economics And Administrative Sciences
The Use of Replacement Models On Determine the Optimal Time to Replacement
...Show More Authors

Abstract:-

            The approach maintenance and replacement one of techniques of operations research whom cares of the failure experienced by a lot of production lines which consist of a set of machines and equipment, which in turn exposed to the failure or work stoppages over the lifetime, which requires reducing the working time of these machines or equipment below what can or conuct  maintenance process once in a while or a replacement for one part of the machine or replace one of the machines in production lines. In this research is the study of the failure s that occur in some parts of one of the machines for the General Company for Vege

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Dec 13 2017
Journal Name
Al-khwarizmi Engineering Journal
Shot Peening Time Effect on Corrosion Behaviors of Al Alloy 2024-T3
...Show More Authors

In this study many specimen s were prepared from 2024-T3 Aluminum alloy for corrosion test by the dimensions of (15*15*3) mm according to ASTM G71-31 and then subjected to shot peening process at different time (15, 30, 45) minutes using steel ball having a diameter of 2.75 mm and Rockwell Hardness of 55RC to induce compressive residual stress which were measured using X-Ray diffraction method, surface roughness and   hardness were tested before and after peening. Electrochemical corrosion test by Tafel extrapolation method was carried out in an environment of 3 .5% NaCl solutions (sea water) where Corrosion rate calculated using Tafle equation.

The obtained results show a favorable influence of SP treatment

... Show More
View Publication Preview PDF
Publication Date
Sat Jul 01 2017
Journal Name
2017 Computing Conference
Protecting a sensitive dataset using a time based password in big data
...Show More Authors

View Publication
Crossref (1)
Crossref
Publication Date
Wed Jul 01 2020
Journal Name
2020 42nd Annual International Conference Of The Ieee Engineering In Medicine & Biology Society (embc)
Recurrent Fusion of Time-Domain Descriptors Improves EMG-based Hand Movement Recognition
...Show More Authors

View Publication
Scopus (1)
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Tue Jun 01 2021
Journal Name
Int. J. Nonlinear Anal. Appl.
Time series analysis of the number of covid-19 deaths in Iraq
...Show More Authors

Preview PDF
Scopus (2)
Scopus
Publication Date
Wed Oct 01 2025
Journal Name
Journal Of Physical Education
A Study of Actual Training Time Administration in Bedra Specialized Weightlifting Club
...Show More Authors

View Publication
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
Solving Time-Cost Tradeoff Problem with Resource Constraint Using Fuzzy Mathematical Model
...Show More Authors

Scheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Sun Oct 02 2016
Journal Name
Journal Of Educational And Psychological Researches
The relationship between Intrinsic Motivation Academy and Time Management among University students
...Show More Authors

study aimed to recognize The relationship between Intrinsic Motivation Academy and Time Management among University students and measure Intrinsic Motivation Academy And Time Management for sample and Balancing Degrees of Basic Research on the two scales According to the Variable genders and Specialization, The sample consisted (350) students by (230) female (120) male , and the sample  responded scales of Intrinsic Motivation Academy for (Alwan & Attaat2009) and Time Management (Building tool), The Results of this study show that: There are statistically significant differences according to gender variable in Intrinsic Motivation Academy and Time Management in favor of the male, and there are statistica

... Show More
View Publication Preview PDF