Time and finance optimization model for multiple construction projects using genetic algorithm
...Show More Authors
Abstract<p>Construction contractors usually undertake multiple construction projects simultaneously. Such a situation involves sharing different types of resources, including monetary, equipment, and manpower, which may become a major challenge in many cases. In this study, the financial aspects of working on multiple projects at a time are addressed and investigated. The study considers dealing with financial shortages by proposing a multi-project scheduling optimization model for profit maximization, while minimizing the total project duration. Optimization genetic algorithm and finance-based scheduling are used to produce feasible schedules that balance the finance of activities at any time with the available funds. The model has been tested in multi scenarios, and the results are analyzed. The results show that negative cash flow is minimized from −693,784 to −634,514 in enterprise I and from −2,646,408 to −2,529,324 in enterprise II in the first scenario and also results show that negative cash flow is minimized to −612,768 with a profit of +200,116 in enterprise I and to −2,597,290 with a profit of +1,537,632 in enterprise II in the second scenario.</p>
Scopus Clarivate Crossref
View Publication
Publication Date
Tue Jun 21 2022
Journal Name
Peerj Computer Science
Performance evaluation of frequency division duplex (FDD) massive multiple input multiple output (MIMO) under different correlation models
...Show More Authors

Massive multiple-input multiple-output (massive-MIMO) is considered as the key technology to meet the huge demands of data rates in the future wireless communications networks. However, for massive-MIMO systems to realize their maximum potential gain, sufficiently accurate downlink (DL) channel state information (CSI) with low overhead to meet the short coherence time (CT) is required. Therefore, this article aims to overcome the technical challenge of DL CSI estimation in a frequency-division-duplex (FDD) massive-MIMO with short CT considering five different physical correlation models. To this end, the statistical structure of the massive-MIMO channel, which is captured by the physical correlation is exploited to find sufficiently

... Show More
View Publication
Scopus (5)
Crossref (5)
Scopus Clarivate Crossref
Publication Date
Mon Oct 01 2018
Journal Name
Journal Of Economics And Administrative Sciences
measure the relationship between imported inflation and foreign trade in the Iraqi economy for long 1990-2015 using model nardl
...Show More Authors

The study aims to discuss the relation between imported inflation and international trade of Iraqi economy for the period (1990-2015) by using annual data. To achieve the study aim, statistical and Econometrics methods are used through NARDL model to explain non-linear relation because it’s a model assigned to measure non-linear relations and as we know most economic relations are non-linear, beside explaining positive and negative effects of imported inflation, and to reach the research aim deductive approach was adopted through using descriptive method to describe and determine phenomenon. Beside the inductive approach by g statistical and standard tools to get the standard model explains the

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Sep 01 2011
Journal Name
Journal Of Economics And Administrative Sciences
Determination Of The Efficient Production Plans For Al-Shaheed Public Company By Using Tatget Motad Model Under Risk And Uncertainty
...Show More Authors

The research aims to derive the efficient industrial plans for Al – shaheed public company under risk by using Target MOTAD as a linear alternative  model for the quadratic programming models.

The results showed that there had been a sort of (trade- off) between risk and the expected gross margins. And if the studied company strives to get high gross margin, it should tolerate risk and vice versa. So the management  of Al- Shaheed Company to be invited to apply the suitable procedures in the production process, in order to get efficient plans that improves it's  performance .

View Publication Preview PDF
Crossref
Publication Date
Sun Dec 01 2013
Journal Name
Baghdad Science Journal
Construction of New Ion Selective Electrodes for Determination Fe(III) and Their Application in Pharmaceutical samples
...Show More Authors

Liquid membrane electrodes for the determination iron(III) were constructed based on chloramphenicol sodium succinate and iron(III) CPSS-Fe(III) as ion pair complex, with four plasticizers Di-butyl phosphate (DBP); Di-butyl phthalate (DBPH); Di-octyl phthalate (DOP); Tri-butyl phosphate (TBP); in PVC matrix . These electrodes give Nernstian and sub-Nernstian slopes (19.79, 24.60, 16.01 and 13.82mV/decade) and linear ranges from (1x10-5-1x10-2 M, 1x10-5-1x10-2 M, 1x10-6-1x10-2 M and 1x10-5-1x10-2 M) respectively. The best electrode was based on DBP plasticizer which gave a slope 19.79 mV/decade, correlation coefficient 0.9999, detection limit of 9×10-6 M, lifetime 37 day displayed good stability and reproducibility and used to determine

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Feb 25 2022
Journal Name
Heat And Mass Transfer
Optimization, equilibrium, kinetics and thermodynamic study of congo red dye adsorption from aqueous solutions using iraqi porcelanite rocks
...Show More Authors

View Publication
Scopus (13)
Crossref (11)
Scopus Clarivate Crossref
Publication Date
Wed Jul 01 2015
Journal Name
Advanced Powder Technology
Characterization of nano-silica prepared from local silica sand and its application in cement mortar using optimization technique
...Show More Authors

View Publication
Scopus (94)
Crossref (93)
Scopus Clarivate Crossref
Publication Date
Fri Sep 30 2022
Journal Name
International Journal Of Intelligent Systems And Applications In Engineering
Optimizing Methods of Funding Residential Complexes Projects
...Show More Authors

Scopus (3)
Scopus
Publication Date
Sun Oct 01 2017
Journal Name
Journal Of Engineering
Mismanagement Reasons of the Projects Execution Phase
...Show More Authors

The execution phase  of the project is most dangerous and the most drain on the resources during project life cycle, therefore, its need to monitor and control by specialists to exceeded obstructions and achieve the project goals. The study aims to detect the actual reasons behind mismanagement of the execution phase. The study begins with theoretical part, where it deals with the concepts of project, project selection, project management, and project processes. Field part consists of three techniques: 1- brainstorming, 2- open interviews with experts and 3- designed questionnaire (with 49 reason. These reasons result from brainstorming and interviewing with experts.), in order to find the real reasons behind misman

... Show More
View Publication Preview PDF
Publication Date
Sat Dec 01 2012
Journal Name
Journal Of Economics And Administrative Sciences
Scheduling Critical Activities of Stochastic Projects Management
...Show More Authors

In this paper, we consider the problem of stochastic project network when some or all activities are interrupted. An approach has been built to schedule the critical activities, by constructing some expressions based on the project lateness costs due to the interruption activities. Two simple example are presented to validate our approach.

Key words: Project Management, Project scheduling, Stochastic activity duration, Stochastic PERT.    

Introduction

   Recently, Projects planning and optimal timing, under uncertainty are extremely critical for many organizations, see [19]. Having an effective mathematical model wi

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Jan 14 2018
Journal Name
Journal Of Engineering
Efficient Cost Management in the Housing Projects
...Show More Authors

The cost management of cost indicators in housing projects, on the level of planning and design, is the most important quality indicators, for adoption of strategies of planning and design efficient in managing these indicators. So this research points out the need to highlight the most effective and influential cost indicators in housing projects, and to determine strategies in the management of these indicators in order to raise the efficiency of housing projects quality, to seemly the income level target group, taking into consideration the quality of housing standards, to achieve the basic requirements of housing. This paper highlights the importance of the cost  management, the types of housing cost, the method

... Show More
View Publication Preview PDF