Construction contractors usually undertake multiple construction projects simultaneously. Such a situation involves sharing different types of resources, including monetary, equipment, and manpower, which may become a major challenge in many cases. In this study, the financial aspects of working on multiple projects at a time are addressed and investigated. The study considers dealing with financial shortages by proposing a multi-project scheduling optimization model for profit maximization, while minimizing the total project duration. Optimization genetic algorithm and finance-based scheduling are used to produce feasible schedules that balance the finance of activities at any time with the available funds. The model has been tested in multi scenarios, and the results are analyzed. The results show that negative cash flow is minimized from −693,784 to −634,514 in enterprise I and from −2,646,408 to −2,529,324 in enterprise II in the first scenario and also results show that negative cash flow is minimized to −612,768 with a profit of +200,116 in enterprise I and to −2,597,290 with a profit of +1,537,632 in enterprise II in the second scenario.
The specialist researcher fined the relations between economic ideas with economic facts in his theory which called humanity building it is appeared clearly ( in Ibn Khalduons’ Muqaddimah) in a clothe of economic social phenomenon's as a systematical analysis in all fifty chapters of al Muqaddimah ,therefore this paper deal with Ibn Khalduon economic thoughts as important says which describe the society building in its economic subjective and examine the relationship between The dissert and the city within economic says which are cover the social analysis ,and determinate the analysis objects which clearly in this dualism model ,between the state and economic bas
... Show MoreProject management are still depending on manual exchange of information based on paper documents. Where design drawings drafting by computer-aided design (CAD), but the data needed by project management software can not be extracted directly from CAD, and must be manually entered by the user. The process of calculation and collection of information from drawings and enter in the project management software needs effort and time with the possibility of errors in the transfer and enter of information. This research presents an integrated computer system for building projects where the extraction and import quantities, through the interpretation of AutoCAD drawing with MS Access database of unit costs and productivities for the pricing and
... Show MoreThe aim of advancements in technologies is to increase scientific development and get the overall human satisfaction and comfortability. One of the active research area in recent years that addresses the above mentioned issues, is the integration of radio frequency identification (RFID) technology into network-based systems. Even though, RFID is considered as a promising technology, it has some bleeding points. This paper identifies seven intertwined deficiencies, namely: remote setting, scalability, power saving, remote and concurrent tracking, reusability, automation, and continuity in work. This paper proposes the construction of a general purpose infrastructure for RFID-based applications (IRFID) to tackle these deficiencies. Finally
... Show MoreThe area around the Suez Canal has been chosen particularly Sinai to implement the new Suez Canal project parallel to the original 72-km-long channel due to the importance of the commercial site of the Arab Republic of Egypt, competing with shipping lanes, to accommodate the increasing maritime traffic passing through the Suez canal, and to provide special services for trade world and reduce the economic cost of marine trip. The establishment of six tunnels for automobile and railway transport to Sinai The cost of the establishment of this new channel and the establishment of the tunnels about (2.8) billion, of which 4 billion cost of the new channel. Project implementation period is one year. The new proj
... Show MoreVariation order plays an important role in calculating the final cost and time. The paper aims to determine the causes of variation orders in projects performed between 2007-2014 in Erbil governorate projects. Data was collected from contract documents. Performed in the Erbil governorate projects from 2007-2014. The study seeks to identify the most significant causes of delays by assessing the common causes of delays in terms of frequency, severity and
important indices of owners, consultants and contractors related to&n
... Show MoreResearch is a study conducted by a researcher or a group of researchers to uncover ambiguity, complete a knowledge, or define a relationship, Solve a problem, or answer a question by carefully investigating the comprehensive and in-depth examination of the evidence and evidence related to this knowledge, revealing a relationship, or solving a problem, or answering a question, to be a systematic, In evidence and evidence that reveal facts and general rules, relationships or solutions, in addition to providing knowledge Human rights are verifiable, tested and confirmed. The university research (graduate research, master's thesis, doctoral dissertation) is the most important type of research, and it is supposed to be the best one, since it
... Show MoreThis study looks into the many methods that are used in the risk assessment procedure that is used in the construction industry nowadays. As a result of the slow adoption of novel assessment methods, professionals frequently resort to strategies that have previously been validated as being successful. When it comes to risk assessment, having a precise analytical tool that uses the cost of risk as a measurement and draws on the knowledge of professionals could potentially assist bridge the gap between theory and practice. This step will examine relevant literature, sort articles according to their published year, and identify domains and qualities. Consequently, the most significant findings have been presented in a manne