Time and finance optimization model for multiple construction projects using genetic algorithm
...Show More Authors
Abstract<p>Construction contractors usually undertake multiple construction projects simultaneously. Such a situation involves sharing different types of resources, including monetary, equipment, and manpower, which may become a major challenge in many cases. In this study, the financial aspects of working on multiple projects at a time are addressed and investigated. The study considers dealing with financial shortages by proposing a multi-project scheduling optimization model for profit maximization, while minimizing the total project duration. Optimization genetic algorithm and finance-based scheduling are used to produce feasible schedules that balance the finance of activities at any time with the available funds. The model has been tested in multi scenarios, and the results are analyzed. The results show that negative cash flow is minimized from −693,784 to −634,514 in enterprise I and from −2,646,408 to −2,529,324 in enterprise II in the first scenario and also results show that negative cash flow is minimized to −612,768 with a profit of +200,116 in enterprise I and to −2,597,290 with a profit of +1,537,632 in enterprise II in the second scenario.</p>
Scopus Clarivate Crossref
View Publication
Publication Date
Sun Jan 01 2023
Journal Name
Journal Of Engineering
Evaluation of the Current Status of the Cost Control Processes in Iraqi Construction Projects
...Show More Authors

One of the most important problems of Iraqi construction projects is the cost variances, so it is important to identify the problems and shortcomings that cause poor cost control. Through the utilization of questionnaires, the study evaluated how project costs were managed and reported. The questionnaire was distributed to 180 professionals working in the Iraqi construction sector, with a response rate of 91%. The results showed that a high percentage of projects are implemented with a difference between real and estimated costs, and the process of documenting cost data needs to be more secure. On the other hand, there is a weakness in providing the necessary work structure information to monitor costs and a lack of proc

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Sun Jan 01 2017
Journal Name
Dissertation/thesis
A Model To Evaluate the Online Training for Global Virtual Teams in Global Software Projects
...Show More Authors

Publication Date
Sat Dec 02 2023
Journal Name
Journal Of Engineering
Reducing Maintenance Costs for Government Projects in Iraq Using Performance Indicators
...Show More Authors

Institutions and companies are looking to reduce spending on buildings and services according to scientific methods, provided they reach the same purpose but at a lower cost. On this basis, this paper proposes a model to measure and reduce maintenance costs in one of the public sector institutions in Iraq by using performance indicators that fit the nature of the work of this institution and the available data. The paper relied on studying the nature of the institution’s work in the maintenance field and looking at the type of data available to know the type and number of appropriate indicators to create the model. Maintenance data were collected for the previous six years by reviewing the maintenance and financial dep

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Oct 27 2024
Journal Name
Journal Of Economics And Administrative Sciences
An Integrated Approach to Constraints Theory and Fuzzy Analytical Hierarchy Process (FAHP) in Construction Projects (Case Study)
...Show More Authors

The research endeavors to harness the benefits stemming from the integration of constraint theory into construction project management, with the primary goal of mitigating project completion delays. Additionally, it employs fuzzy analysis to determine the relative significance of fundamental constraints within projects by assigning them appropriate weights. The research problem primarily revolves around two key issues. Firstly, the persistent utilization of outdated methodologies and a heavy reliance on workforce experience without embracing modern computerized technologies. Secondly, the recurring problem of project delivery delays. Construction projects typically encompass five fundamental constraint types: cost restrictions, tim

... Show More
Preview PDF
Crossref
Publication Date
Tue Sep 01 2020
Journal Name
Journal Of Engineering
Optimization and Modeling the Performance of a Mediator-less Microbial Fuel Cell using Butler-Volmer-Monod Model
...Show More Authors

In this study, a one-dimensional model represented by Butler-Volmer-Monod (BVM) model was proposed to compute the anode overpotential and current density in a mediator-less MFC system. The system was fueled with various organic loadings of real field petroleum refinery oily sludge to optimize the favorable organic loading for biomass to operate the suggested system. The increase in each organic loading showed higher resistance to electrons transport to the anode represented by ohmic loss. On the contrary, both activation and mass transfer losses exhibited a noticeable decrement upon the increased organic loadings. However, current density was improved throughout all increased loads achieving a maximum current density of 5.2 A/m3

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Sat Feb 01 2020
Journal Name
Meta Gene
Interleukin-2 serum level, genetic polymorphism (rs2069763), anti-rubella antibody and risk of multiple sclerosis among Iraqi patients
...Show More Authors

Background: Multiple sclerosis (MS) is a chronic neurodegenerative autoimmune disease mediated by autoreactive T cells against myelin-basic proteins. Cytokines are suggested to play a role in the etiopathogenesis of the disease. Among these cytokines is interleukin-2 (IL-2). Aim of the study: To investigate the association between IL2+166 G/T single nucleotide polymorphism (SNP: rs2069763) and MS in Iraqi patients. Serum level of IL-2 was also detected. Anti-rubella IgG antibody was further determined in the sera of patients. Patients and methods: Eighty MS patients (28 males and 52 females; age mean ± SD: 39.2 ± 16.1 years) and 80 healthy control matched patients for age (32.15 ± 16.13 years) and gender (28 males and 52 females) were en

... Show More
View Publication
Scopus (5)
Crossref (2)
Scopus Clarivate Crossref
Publication Date
Wed May 10 2023
Journal Name
Journal Of Engineering
A Proposal Algorithm to Solve Delay Constraint Least Cost Optimization Problem
...Show More Authors

Traditionally, path selection within routing is formulated as a shortest path optimization problem. The objective function for optimization could be any one variety of parameters such as number of hops, delay, cost...etc. The problem of least cost delay constraint routing is studied in this paper since delay constraint is very common requirement of many multimedia applications and cost minimization captures the need to
distribute the network. So an iterative algorithm is proposed in this paper to solve this problem. It is appeared from the results of applying this algorithm that it gave the optimal path (optimal solution) from among multiple feasible paths (feasible solutions).

View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Wed Oct 17 2018
Journal Name
Journal Of Economics And Administrative Sciences
comparison between the methods estimate nonparametric and semiparametric transfer function model in time series the Using simulation
...Show More Authors

 The transfer function model the basic concepts in the time series. This model is used in the case of multivariate time series. As for the design of this model, it depends on the available data in the time series and other information in the series so when the representation of the transfer function model depends on the representation of the data In this research, the transfer function has been estimated using the style nonparametric represented in two method  local linear regression and cubic smoothing spline method The method of semi-parametric represented use semiparametric single index model, With four proposals, , That the goal of this research is comparing the capabilities of the above mentioned m

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Aug 28 2018
Journal Name
Mechanical Sciences
Mechatronic design and genetic-algorithm-based MIMO fuzzy control of adjustable-stiffness tendon-driven robot finger
...Show More Authors

Abstract. This work presents a detailed design of a three-jointed tendon-driven robot finger with a cam/pulleys transmission and joint Variable Stiffness Actuator (VSA). The finger motion configuration is obtained by deriving the cam/pulleys transmission profile as a mathematical solution that is then implemented to achieve contact force isotropy on the phalanges. A VSA is proposed, in which three VSAs are designed to act as a muscle in joint space to provide firm grasping. As a mechatronic approach, a suitable type and number of force sensors and actuators are designed to sense the touch, actuate the finger, and tune the VSAs. The torque of the VSAs is controlled utilizing a designed Multi Input Multi Output (MIMO) fuzzy controll

... Show More
View Publication
Scopus (7)
Crossref (7)
Scopus Clarivate Crossref
Publication Date
Mon Feb 08 2021
Journal Name
Public Works Management &amp; Policy
Causes of Problems in Post-Disaster Emergency Re-Construction Projects—Iraq as a Case Study
...Show More Authors

This study examines the causes of time delays and cost overruns in a selection of thirty post-disaster reconstruction projects in Iraq. Although delay factors have been studied in many countries and contexts, little data exists from countries under the conditions characterizing Iraq during the last 10-15 years. A case study approach was used, with thirty construction projects of different types and sizes selected from the Baghdad region. Project data was gathered from a survey which was used to build statistical relationships between time and cost delay ratios and delay factors in post disaster projects. The most important delay factors identified were contractor failure, redesigning of designs/plans and change orders, security is

... Show More
View Publication
Scopus (20)
Crossref (28)
Scopus Clarivate Crossref