Preferred Language
Articles
/
LBYARocBVTCNdQwClUD0
Time and finance optimization model for multiple construction projects using genetic algorithm
...Show More Authors
Abstract<p>Construction contractors usually undertake multiple construction projects simultaneously. Such a situation involves sharing different types of resources, including monetary, equipment, and manpower, which may become a major challenge in many cases. In this study, the financial aspects of working on multiple projects at a time are addressed and investigated. The study considers dealing with financial shortages by proposing a multi-project scheduling optimization model for profit maximization, while minimizing the total project duration. Optimization genetic algorithm and finance-based scheduling are used to produce feasible schedules that balance the finance of activities at any time with the available funds. The model has been tested in multi scenarios, and the results are analyzed. The results show that negative cash flow is minimized from −693,784 to −634,514 in enterprise I and from −2,646,408 to −2,529,324 in enterprise II in the first scenario and also results show that negative cash flow is minimized to −612,768 with a profit of +200,116 in enterprise I and to −2,597,290 with a profit of +1,537,632 in enterprise II in the second scenario.</p>
Scopus Clarivate Crossref
View Publication
Publication Date
Thu Sep 19 2019
Journal Name
Engineering, Construction And Architectural Management
Influential safety technology adoption predictors in construction
...Show More Authors
Purpose

Existing literature suggests that construction worker safety could be optimized using emerging technologies. However, the application of safety technologies in the construction industry is limited. One reason for the constrained adoption of safety technologies is the lack of empirical information for mitigating the risk of a failed adoption. The purpose of this paper is to fill the research gap through identifying key factors that predict successful adoption of safety technologies.

Design/methodology/approach

In total, 26 key technology adoption predictors

... Show More
View Publication
Scopus (70)
Crossref (71)
Scopus Clarivate Crossref
Publication Date
Sat Nov 01 2014
Journal Name
International Journal Of Basic And Applied Sciences
A reliable iterative method for solving the epidemic model and the prey and predator problems
...Show More Authors

In the present article, we implement the new iterative method proposed by Daftardar-Gejji and Jafari (NIM) [V. Daftardar-Gejji, H. Jafari, An iterative method for solving nonlinear functional equations, J. Math. Anal. Appl. 316 (2006) 753-763] to solve two problems; the first one is the problem of spread of a non-fatal disease in a population which is assumed to have constant size over the period of the epidemic, and the other one is the problem of the prey and predator. The results demonstrate that the method has many merits such as being derivative-free, overcome the difficulty arising in calculating Adomian polynomials to handle the nonlinear terms in Adomian Decomposition Method (ADM), does not require to calculate Lagrange multiplier a

... Show More
View Publication
Crossref (4)
Crossref
Publication Date
Sat Dec 01 2018
Journal Name
Journal Of Energy Storage
Multiple-segment metal foam application in the shell-and-tube PCM thermal energy storage system
...Show More Authors

View Publication
Scopus (171)
Crossref (143)
Scopus Clarivate Crossref
Publication Date
Thu Dec 18 2025
Journal Name
Mathematical Methods In The Applied Sciences
Time‐Dependent Term Identification in the Time–Space Fractional Derivative Diffusion Equation From Integral Over Specified Condition
...Show More Authors
ABSTRACT<p> In this paper, a time–space fractional order inverse source problem to determine the temperature solution and the time‐dependent source term from heat moment to the time–space fractional heat equation with an initial condition, homogeneous Dirichlet boundary conditions, and integral overdetermination condition is investigated. Two unconditionally stable finite difference schemes are proposed to find a numerical solution of the direct problem. Namely, method I is based on the approximation of the time‐fractional derivative via Laplace transformation, whereas method II is based on finite difference approximation. The inverse problem is solved iteratively </p> ... Show More
View Publication
Scopus (1)
Scopus Crossref
Publication Date
Wed Apr 01 2020
Journal Name
Isa Transactions
Design of a Complex fractional Order PID controller for a First Order Plus Time Delay system
...Show More Authors

View Publication
Scopus (52)
Crossref (45)
Scopus Clarivate Crossref
Publication Date
Thu Dec 21 2023
Journal Name
Mathematical Modelling Of Engineering Problems
Recovering Time-Dependent Coefficients in a Two-Dimensional Parabolic Equation Using Nonlocal Overspecified Conditions via ADE Finite Difference Schemes
...Show More Authors

View Publication Preview PDF
Scopus (1)
Scopus Crossref
Publication Date
Tue Jun 30 2020
Journal Name
Journal Of Economics And Administrative Sciences
Using the Critical Path Method (CPM) for scheduling the project (paving the Amil Sayid Al-Ayyam Street with a length of 1.25 km) In terms of Decresing the time
...Show More Authors

The implementation of the concept of project scheduling in the organizations generally requires a set of procedures and requirements, So, most important of all is the understanding and knowledge of the tools and techniques which are called the methods of scheduling projects. Consequently, the projects of the municipality administration in the holy governorate of Karbala suffer from the problem of delaying their projects and chaos in the ways of implementation. To provide assistance to this directorate and to demonstrate how to schedule projects using one of the advanced scientific methods that proved their ability to schedule any project and its potential to accelerate the time of completion, as well as ease of use and effectiven

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Mar 01 2023
Journal Name
Shift
Construction Safety Personnel Qualifications: The Impact of Education, Experience, and Certificate Programs
...Show More Authors

Publication Date
Sun Jul 01 2018
Journal Name
Journal Of Construction Engineering And Management
Measuring and Evaluating Safety Maturity of Construction Contractors: Multicriteria Decision-Making Approach
...Show More Authors

View Publication
Scopus (72)
Crossref (56)
Scopus Clarivate Crossref
Publication Date
Fri Apr 20 2018
Journal Name
Iaes International Journal Of Artificial Intelligence (ij-ai)
Optimization of Digital Histopathology Image Quality
...Show More Authors

One of the biomedical image problems is the appearance of the bubbles in the slide that could occur when air passes through the slide during the preparation process. These bubbles may complicate the process of analysing the histopathological images. The objective of this study is to remove the bubble noise from the histopathology images, and then predict the tissues that underlie it using the fuzzy controller in cases of remote pathological diagnosis. Fuzzy logic uses the linguistic definition to recognize the relationship between the input and the activity, rather than using difficult numerical equation. Mainly there are five parts, starting with accepting the image, passing through removing the bubbles, and ending with predict the tissues

... Show More
View Publication Preview PDF
Scopus (3)
Crossref (1)
Scopus Crossref