The pillars of sustainable development are representing the interface between environmental, economic, and social sustainability. Sustainable development is a method of planning and managing construction projects to reduce the effect of the construction process on the environment so that there is a balance between environmental capabilities and the human needs of present and future generations. Usually, Environmental sustainability is most important and effective in construction projects. The environment suffers from significant negative impacts as a result of the implementation of construction projects; therefore, this study aims to identify the effecting factors on environmentally sustainable development. The methodology of this study used fuzzy cognitive maps (FCMs) because of adopted simulation approach, after selecting the factors that have RII more than 65% and determine causal relationship between factors by applying fuzzy logic using MATLAB program. Then the effecting factors were analyzed and ranked by static and dynamic analysis. The results showed the static analysis of effecting factors on ESD in first quarter are characterized by influential and affected by other factors of (ESD), were include (C2.4, C4.6, C1.6, C2.1, C3.3, C3.7, C3.6, C6.2), When comparing between dynamic analysis and RII of the factors, it has been noticed a difference in the importance. This is an essential finding in the understanding that dynamic analysis considers the interactions between factors, while the RII takes the reasons independently and neglects interactions between them. The study has provided recommendations for the application of (FCM) model that was proposed depend on these factors in building projects to improve the environment and reduce its negative effects.
The aim of this study is to investigate the effect of environmental management accounting information (EMAI) on the design process of environmental and sustainable products of Iraqi industrial companies. This process has five different sub-processes: research process, analysis process, conceptual design process, detailed design process and design production process. The study uses the quantitative approach as the questionnaire was designed and distributed to 87 quality managers, production managers, design managers and financial managers. The MANOVA analysis shows that EMAI has a positive and significant effect on three of these processes, namely research process, analysis process and detailed design process, while EMAI has an insi
... Show MoreConstruction projects are complicated in nature and require many considerations in contractor selection. One of the complicated interactions is that between performance with the project size, and contractor financial status, and size of projects contracted. At the prequalification stage, the financial requirements restrict the contractors to meet minimum limits in financial criteria such as net worth, working capital and annual turnover, etc. In construction projects, however, there are cases when contractors meet these requirements but show low performance in practice. The model used in the study predicts the performance by training of a neural network. The data used in the study are 72 of the most recent roadw
... Show MoreThis research is divided into a process of classifying and filtering most of the studies that dealt with sustainable professional development and dividing them into several sections to determine the categories for which sustainable professional development is measured, which categories did not address it, the extent to which the samples deal with and their number of the target variable, as well as the variables that suit sustainable professional development and the variables that did not Study it yet. And also the quality of studies in terms of the methodology used so that there is a reference for every researcher who intends to study sustainable professional development with studies, their characteristics, categories, tools and methodology
... Show MoreTo achieve sustainability, use waste materials to make concrete to use alternative components and reduce the production of Portland cement. Lime cement was used instead of Portland cement, and 15% of the cement's weight was replaced with silica fume. Also used were eco-friendly fibers (copper fiber) made from recycled electrical. This work examines the impact of utilizing sustainable copper fiber with different aspect ratios (l/d) on some mechanical properties of high-strength green concrete. A high-strength cement mixture with a compressive strength of 65 MPa in line with ACI 211.4R was required to complete the assignment. Copper fibers of 1% by volume of concrete were employed in mixes with four different aspect ratios
... Show MoreThis research investigated the importance and priorities of the project overhead costs in Iraq via a questionnaire using the fuzzy analytic hierarchy process technique (FAHP). Using this technique is very important in the uncertain circumstances as in our country. The researcher reached to frame an equation through the results of the priorities of weights include the percentages of each of the main items of the project overhead costs. The researcher tested this equation by applying it to one of the completed projects and the results showed suitability for the application. The percentages of the (salaries, grants, and incentives) and (fieldwork requirements) in equation represent approximately two-thirds of project overhe
... Show MorePeople’s ability to quickly convey their thoughts, or opinions, on various services or items has improved as Web 2.0 has evolved. This is to look at the public perceptions expressed in the reviews. Aspect-based sentiment analysis (ABSA) deemed to receive a set of texts (e.g., product reviews or online reviews) and identify the opinion-target (aspect) within each review. Contemporary aspect-based sentiment analysis systems, like the aspect categorization, rely predominantly on lexicon-based, or manually labelled seeds that is being incorporated into the topic models. And using either handcrafted rules or pre-labelled clues for performing implicit aspect detection. These constraints are restricted to a particular domain or language which is
... Show MoreControlling cost in construction projects is an essential issue. This study investigates the most critical problems that cause weakness in cost control in Iraqi construction projects. The quantitative technique was used by conducting a survey directed to professionals who work on construction projects. One hundred and sixty-four questionnaire forms were distributed to private sector companies, government companies, and government institutions, and the responses were subjected to the required statistical analysis. The results indicate that the most influential factors are the weakness in keeping up with the use of modern concepts, methods, and technologies, the delay in receiving the amounts due for work done from the owner, fluctuat
... Show MoreThe sustainable environmental neighborhoods is sustainable development of neighborhoods that include considerations related to transport, density, urban forms, and environmental buildings and especially those related to social and functional integration, and civil society participation, This standard, which did not attract the attention of specialists in the 1990s, has today become a center of attention for all those interested in urbanism and sustainability. The problem of the research is the existence of urban problems in residential neighborhoods that lead to lack of sustainability in the city, and the research aims to explain the role and importance of environmental sustainability
The information required for construction quantities surveying is not only generated by various participants in different construction phases but also stored in different forms including graphics, text, tables, or various combinations of the three. To report a bill of quantities (BOQ), the project manager has to continuously excerpt information from various resources and record it on papers. Without adequate staff and time, this repetitive and tedious process is difficult for the project manager to handle properly and thus reduces the effectiveness and the accuracy of the quantities surveying process which creates problems during the design, tender, and construction supervision of construction projects for designers and contractors pract