The pillars of sustainable development are representing the interface between environmental, economic, and social sustainability. Sustainable development is a method of planning and managing construction projects to reduce the effect of the construction process on the environment so that there is a balance between environmental capabilities and the human needs of present and future generations. Usually, Environmental sustainability is most important and effective in construction projects. The environment suffers from significant negative impacts as a result of the implementation of construction projects; therefore, this study aims to identify the effecting factors on environmentally sustainable development. The methodology of this study used fuzzy cognitive maps (FCMs) because of adopted simulation approach, after selecting the factors that have RII more than 65% and determine causal relationship between factors by applying fuzzy logic using MATLAB program. Then the effecting factors were analyzed and ranked by static and dynamic analysis. The results showed the static analysis of effecting factors on ESD in first quarter are characterized by influential and affected by other factors of (ESD), were include (C2.4, C4.6, C1.6, C2.1, C3.3, C3.7, C3.6, C6.2), When comparing between dynamic analysis and RII of the factors, it has been noticed a difference in the importance. This is an essential finding in the understanding that dynamic analysis considers the interactions between factors, while the RII takes the reasons independently and neglects interactions between them. The study has provided recommendations for the application of (FCM) model that was proposed depend on these factors in building projects to improve the environment and reduce its negative effects.
Abstract
This study was to demonstrate the role-use planning scientific methods is disabled and little used in the planning and follow-up construction of vital projects in the province of Baghdad, including network planning methods, in order to find the optimal time to finish the project in light of the resources available and the budget set for it, in the current research has been used the most prominent network planning methods and two stylistic (CPM / PERT), was the application of the critical path method on standard-design school project (traditional) to draw Action Network according to confirmed times for the activities of the project and account his Crashing time , It was Pert technique applied to the project hemato
... Show MoreThat the building of the national economy depends on the extent of the possibility of transition from the rent economy seeking to increase GDP (GDP1), and the tendency to manage projects with external sources of funding, or allow projects with foreign capital is a necessity. The strategic challenges faced by the economy in countries that have experience in investment projects have faced several factors internal and external for a period of time and not a few and the pressures and difficulties and failures have affected in one way or another on the development work in that country. On this basis, the stakeholders have a role to pay attention to the issue of the feasibility of the pattern of foreign investment in the investment environment
... Show MoreThe research aims to find out the impact of cognitive strategies in the mathematical competence of the students of the fourth scientific in the preparatory mahmoudiyah in the Directorate General of The Education of Karkh 2. A post-test of the mathematical competence prepared by (Jassim, 2018) was applied to the sample of (65) students, distributed into two groups of (33) students as experimental group and (32) students as a control group. The results found there are significant differences between the experimental group and the control group in testing the mathematical competence of students for the experimental group.
Wellbore instability problems cause nonproductive time, especially during drilling operations in the shale formations. These problems include stuck pipe, caving, lost circulation, and the tight hole, requiring more time to treat and therefore additional costs. The extensive hole collapse problem is considered one of the main challenges experienced when drilling in the Zubair shale formation. In turn, it is caused by nonproductive time and increasing well drilling expenditure. In this study, geomechanical modeling was used to determine a suitable mud weight window to overpass these problems and improve drilling performance for well development. Three failure criteria, including Mohr–Coulomb, modifie
This research aims to identify the cognitive distortion of kindergarten children and its relationship to their parenting reinforcement. The researcher used the descriptive approach, being the closest to reaching the study objectives, To measure the relationship between the research variables, the researcher prepared two questionnaire tools for this purpose, the first for measuring "cognitive distortion", And the second is to measure "parental reinforcement", and each tool consisted of (20) items.
After ensuring the validity and reliability of the two research tools and their suitabi
... Show MoreThe conservation of natural resources such as water is one of the areas that sustainable agriculture seeks to preserve, rationalize its use and protect it from pollution, because water is a specific factor for agriculture. Despite Iraq's possession of two international rivers, the Tigris and the Euphrates, which pour into the Shatt Al-Arab, it suffers from water shortages in recent times, As a result of several reasons combined, including water policies initiated by the riparian countries to reduce the quantities of water coming from the two rivers to Iraq, led by neighbor Turkey through the construction of dams and reservoirs and the establishment of irrigation projects, as well as climate changes from rising temperatures and lo
... Show MoreIn this paper, we introduce three robust fuzzy estimators of a location parameter based on Buckley’s approach, in the presence of outliers. These estimates were compared using the variance of fuzzy numbers criterion, all these estimates were best of Buckley’s estimate. of these, the fuzzy median was the best in the case of small and medium sample size, and in large sample size, the fuzzy trimmed mean was the best.