This paper proposes a novel finite-time generalized proportional integral observer (FTGPIO) based a sliding mode control (SMC) scheme for the tracking control problem of high order uncertain systems subject to fast time-varying disturbances. For this purpose, the construction of the controller consists of two consecutive steps. First, the novel FTGPIO is designed to observe unmeasurable plant dynamics states and disturbance with its higher time derivatives in finite time rather than infinite time as in the standard GPIO. In the FTGPO estimator, the finite time convergence rate of estimations is well achieved, whereas the convergence rate of estimations by classical GPIO is asymptotic and slow. Secondly, on the basis of the finite and fast estimations, the SMC scheme is constructed in order to compensate estimation errors in both states and disturbance. Finally, the tracking efficiency is verified by carrying out many simulations on the application example of flexible joint robot (FJR). Besides, comparing the proposed method with the standard GPIO based SMC method is performed.
Erosion and deposition are natural phenomena in many estuaries that can cause morphological changes, leading to navigation and offshore structure problems. Many previous studies have focused on investigating the morphological changes of estuaries depending on different parameters and their combined effects with erosion and deposition processes, such as maximum flow amplitude, waves, currents, tidal flow, storms, rising sea elevation, maximum turbidity, salinity, and bed roughness height as input parameters. These studies are based on field measurements and numerical simulations by using topographic surveys, soil samples, satellite images, geological data, and bathymetric maps with the aid of ArcGIS. Some of these studies examine the
... Show MoreForty lower premolars with single root canals prepared with ProtaperNext files to size 25, and obturated with GP/sealer using lateral compaction. Teeth divided randomly into four groups (group n=10). Protaper universal retreatment kit (PUR), D-Race desobturation files (DRD), R-Endo retreatment kit (RE) and Hedstrom (H) files (control) were used to remove GP/sealer in each group. Removal effectiveness assessed by measuring the GP /sealer remnants in the roots after sectioning them into two halves. Stereomicroscope with a digital camera used to capture digital images. Images processed by ImageJ software to measure the percentage of GP/sealer remnants surface area in total, coronal, middle and apical areas of the canal. In the coronal area,
... Show MoreThe response of the combustor’s liner to the air-flow that passes through it is the key reason for the combustion chambers noise, hence the instabilities of those chambers that decreases the mechanical efficiency of such sections, by increased its mechanical vibrations, which increases the failure rate created during originating of the cracks spreading by the shakes producing by the series of high-level frequencies. Accordingly, any work debating the impact of the context of liners in the combustion chamber can provide grasping for the combustion noise generated by the undesirable vibrations, and benefits the industrial firms to design an ideal production procedure which increases the lifespan of the combustor. The goal of this wo
... Show MoreThe response of the combustor’s liner to the air-flow that passes through it is the key reason for the combustion chambers noise, hence the instabilities of those chambers that decreases the mechanical efficiency of such sections, by increased its mechanical vibrations, which increases the failure rate created during originating of the cracks spreading by the shakes producing by the series of high-level frequencies. Accordingly, any work debating the impact of the context of liners in the combustion chamber can provide grasping for the combustion noise generated by the undesirable vibrations, and benefits the industrial firms to design an ideal production procedure which increases the lifespan of the combustor. The goal of this work is
... Show MoreThe implementation of the concept of project scheduling in the organizations generally requires a set of procedures and requirements, So, most important of all is the understanding and knowledge of the tools and techniques which are called the methods of scheduling projects. Consequently, the projects of the municipality administration in the holy governorate of Karbala suffer from the problem of delaying their projects and chaos in the ways of implementation. To provide assistance to this directorate and to demonstrate how to schedule projects using one of the advanced scientific methods that proved their ability to schedule any project and its potential to accelerate the time of completion, as well as ease of use and effectiven
... Show MoreObjective: To identify of the effect of the different concentrations of the special liquid (for mixing the investment, Gilvest)
and mixed with water/powder ratio on setting time of phosphate–bonded investment.
Method and materials: The present study is (60) specimens made from phosphate bonded investment divided into (4)
groups (control and experimental groups), (15) specimens for each group. The Gillmore needle device is used to setting
time of phosphate bonded investment mixed with different concentration of Gilvest and water.
Results: Showed that there is a high significant difference (P<0.01) between each groups in the ANOVA test and a
significant difference (P<0.05) between the group (A) and control group i
In this research, the problem of ambiguity of the data for the project of establishing the typical reform complex in Basrah Governorate was eliminated. The blurry of the data represented by the time and cost of the activities was eliminated by using the Ranking function and converting them into normal numbers. Scheduling and managing the Project in the Critical Pathway (CPM) method to find the project completion time in normal conditions in the presence of non-traditional relationships between the activities and the existence of the lead and lag periods. The MS Project was used to find the critical path. The results showed that the project completion time (1309.5) dinars and the total cost has reached (33113017769) dinars and the
... Show More