The main objective of this study is to examine the impact of moisture concrete of clayey soil on the concrete slabs placed directly over it. This experimental study presents the mechanical properties of the concrete slab when placed on different clayey soil moisture content ranging from 0% to the optimum moisture content of 35%. The tests were performed on soil concrete specimens of 25*30*50 mm exposed to sprayed water curing conditions for 28 days. Tests of compressive strength, ultrasonic pulse velocity, crack depth and crack width were investigated through this paper. An ejection relationship between compressive strength of concrete and water content in the soil was observed, with a 26% increase with water increasing from 0% to 35%. T
... Show MoreThe need for Dewatering is very important in construction workshops field and sometimes it needs to pay more attention as a result of its impacts on causing additional settlement of nearby pile foundations. Dewatering construction may become a costly topic if ignored during project planning and designing .In this paper a simplified procedure maybe adopted to calculate the foundation settlement induced by using dewatering system which is required to lower the water table level to reach a dry condition during construction. Synthesized case study adopted at a specified location in Baghdad city and analysis are computed for two types of piles both of them are submerged with water. Results shows the effect of dewatering on pile foundatio
... Show MoreEarth dams in regions with moderate to high seismic activity are crucial for protecting downstream communities. Iraq and its neighboring areas have seen recurrent seismic activity, notably the 2017 Halabja Earthquake, which potentially compromised the integrity of the existing earth dam. The Darbandikhan Dam, affected by an earthquake, has inadequacies in its crest and downstream slope, presenting a greater danger of significant earthquake-induced damage compared to cyclic shocks. Consequently, evaluating the dam's safety is essential for safeguarding downstream residents and identifying optimal ways to avert slope stability failure amid recurrent seismic activity. Iraq's seismicity map is being updated to reflect earthquake magni
... Show MoreConstruction projects are the organized effort to construct a building or structure. In the fields of civil engineering and architecture, construction projects involve the process that consists of tangibly assembling an infrastructure or building. Important 5 Skills for Project Managers Leadership and Team Management Risk Management Cost Management Task Management Communication
The current study was conducted to evaluate the effect a mixture of threespecies of arbuscular mycorrhizal fungi (Glomus etunicatum, G. leptotichum andRhizophagus intraradices) double and triple mixture and organic matter by usingplastic pots in the greenhouse at some mycorrhiza and physiological limitationscharacteristics in tomato plant after four and eight weeks of cultivation. Theresults of the determinants mycorrhiza significant increase the percentage ofmycorrhizal frequency F% dry weight of roots mycorrhiza (g.plant-1) andorganic matter in all mycorrhiza single, double and triple mixture after four andeight weeks cultivation treatments. The highest percentage of mycorrhizalfrequency and increase the dry weight of the root in the trea
... Show MoreThis work investigates the effect of earthquakes on the stability of a collective pile subjected to seismic loads in the soil layer. Plaxis 3D 2020 finite element software modeled pile behavior in dry soils with sloping layers. The results showed a remarkable fluctuation between the earthquakes, where the three earthquakes (Halabja, El Centro, and Kobe) and the acceleration peak in the Kobe earthquake had a time of about 11 seconds. Different settlement results were shown, as different values were recorded for the three types of earthquakes. Settlement ratios were increased by increasing the seismic intensity; hence the maximum settlement was observed with the model under the effect of the Kobe earthquake (0.58 g), where
... Show MoreOrganizations adopt a number of procedures and instructions in their field of activities in order to aid their resources development and energies to serve their entrepreneurial orientations. This calls for preparing a range of mechanisms to mitigate the strictness and complexity of procedures. The ambiguity and severe complexity of procedures means acknowledging the loss in energy and this in turn impedes the hopes while in the same time weakens the enthusiasm in these organizations and an impedes the possibility to achieve continues innovation, thereby losing opportunities to the level of surrender to the risks and assuming them to be unconquered obstacles.
There
... Show MoreConstruction projects are characterized as projects with multi phases and activities, complex, unique, and have many different parties and stakeholders. Risks could appear at one or more of the construction project stages and may affect the achievement of project objectives. Therefore, one of the key elements in the planning phase of any project is the risk management process (RMP). This study attempts to understand the terminology of risk in general, risk management, and response to risk in particular. This study is mainly a review of thirty-eight studies that have been published between 1997 and 2020 that demonstrate the importance of the crucial phase of risk response from the risk management process and its impact on
... Show MoreGenetic algorithms (GA) are a helpful instrument for planning and controlling the activities of a project. It is based on the technique of survival of the fittest and natural selection. GA has been used in different sectors of construction and building however that is rarely documented. This research aimed to examine the utilisation of genetic algorithms in construction project management. For this purpose, the research focused on the benefits and challenges of genetic algorithms, and the extent to which genetic algorithms is utilised in construction project management. Results showed that GA provides an ability of generating near optimal solutions which can be adopted to reduce complexity in project management and resolve difficult problem
... Show More