Crude oil still affects many countries because it is one of the essential fuel sources. It makes life more manageable in modern communities and cannot be overstated because it is easy to use and find. However, the pollution caused by its use in industries such as mining, transportation, and the oil and gas business, especially soil pollution, cannot be ignored. Soil pollution is an issue in most communities because it influences people and ecology. Accidental infusions and spills of ore oils are prevalent occurrences leading to the entire or fractional exchange of the soil pore fluid by oil-contaminated soils that have affected the geotechnical engineering properties. The liquid limitations for polluted soil grades silty loam and sandy loam decreased by 38% and 16%. Oil contamination leads to decreased permeability; the permeability values for sandy loam soil decreased from (3.6 × 10−6 to 0.25 × 10−6 cm/s) when the oil content increased from 0 to 16%; however, the permeability values for silty loam decreased from (2.6 × 10−6 to 0.25 × 10−6) cm. The current study results exhibit that the geotechnical properties of contaminated soil with oil slag can be modified upon adding cement at different weight percentages (3, 5, and 7%) to the soil. The Atterberg limits and specific gravity of the soil were noticeably reduced when it was stabilised with cement, as well as because oil spills on soil significantly influence the environment. So, there is an immediate and critical need for efficiently removing petroleum hydrocarbon pollutants from contaminated soil. Bioremediation is a new technology gaining interest worldwide to clean up sites that have polluted petroleum hydrocarbons.
Background: Poly-ether-ether-ketone(PEEK) has been introduced to many dental fields. Recently it was tested as a retainer wire‎ following orthodontic treatment. This study aimed to investigate the effect of changing the bonding spot size and location on the performance of PEEK retainer wires. Methods: A biomechanical study involving four three-dimensional finite element models was performed. The basic model was with a 0.8 mm cylindrical cross-section PEEK wire, bonded at the center of the lingual surface of the mandibular incisors with 4 mm in diameter composite spots. Two other models were designed with 3 mm and 5 mm composite sizes. The last model was created with the composite bonding spot of the canine away from the center
... Show MoreBackground: Poly-ether-ether-ketone(PEEK) has been introduced to many dental fields. Recently it was tested as a retainer wire‎ following orthodontic treatment. This study aimed to investigate the effect of changing the bonding spot size and location on the performance of PEEK retainer wires. Methods: A biomechanical study involving four three-dimensional finite element models was performed. The basic model was with a 0.8 mm cylindrical cross-section PEEK wire, bonded at the center of the lingual surface of the mandibular incisors with 4 mm in diameter composite spots. Two other models were designed with 3 mm and 5 mm composite sizes. The last model was created with the composite bonding spot of the canine away from the center of t
... Show MoreThe aim of this study was to measure the effectiveness of a proposed program to develop the creative abilities of the students of Tabuk University and its impact on the creative output of the NEOM project. The sample of the study consisted of (50) university students divided into two groups: an experimental group of 25 students who receive the proposed training program, and control group of (25) students.
To achieve these objectives, the researcher designed and developed tools to collect the required data, which were verified their validity and reliability.
The descriptive statistics of mean, standard deviations, correlation coefficient, T test for the associated sample were used in the analysis of the results of th
... Show MoreAbstract:
The underlying objective of the international standard No. (6) to assist in accounting applications for the extractive industries, taking into consideration the goals and objectives contained in the sixteenth of the private International Accounting Standards criterion accounting for land, machinery and equipment, as well as Standard No. axes (38) relating to intangible assets, and in order to create a vision of a comprehensive development needs oil in order to exact evaluation of policies related to the particular needs and draw a comprehensive frameworks with respect to treatment of expenditures and revenues in the oil production industry, is also interested in Standard No. (6) within the primary objectiv
... Show MoreIn oil and gas well cementing, a strong cement sheath is wanted to insure long-term safety of the wells. Successful completion of cementing job has become more complex, as drilling is being done in highly deviated and high pressure-high temperature wells. Use of nano materials in enhanced oil recovery, drilling fluid, oil well cementing and other applications is being investigated. This study is an attempt to investigate the effect of nano materials on oil well cement properties. Two types of nano materials were investigated, which are Nano silica (>40 nm) and Nano Alumina (80 nm) and high sulfate-resistant glass G cement is used. The investigated properties of oil well cement included compressive strength, thickening
... Show MoreThe city has normal natural state, and the man has a usual movement, change and search for the new .Also, the city has a usual change and transform in its time, place and quality (sizes)structures. The city has a solid memory diving into the past and the future and reflects The real present, and this memory has a timing layers change into real materialistic place making the city has accumulated overlapping circles which is hard to break u , and it broadcasts the lockup timing density ,in which there is no visual record precisely, it is just like((the social record)) that evaluates the un visual relationships between the components and parts of the city (community and form) in a visual quiet exhibition and transform change inside.
... Show MoreThe time spent in drilling ahead is usually a significant portion of total well cost. Drilling is an expensive operation including the cost of equipment and material used during the penetration of rock plus crew efforts in order to finish the well without serious problems. Knowing the rate of penetration should help in speculation of the cost and lead to optimize drilling outgoings. Ten wells in the Nasiriya oil field have been selected based on the availability of the data. Dynamic elastic properties of Mishrif formation in the selected wells were determined by using Interactive Petrophysics (IP V3.5) software based on the las files and log record provided. The average rate of penetration and average dynamic elastic propert
... Show More